Date
|
Hours
|
Work Log Summary
|
Details
|
09-11-2006
|
5.50
|
laminate rear bulkhead, trial fit door identify bo
|
Details
|
|
|
09-08-2006
|
8.00
|
nutplates on passenger seat bulkhead, installed up
|
Details
|
|
|
08-22-2006
|
8.00
|
cut out access panel at top of vertical & installe
|
Details
|
|
|
08-14-2006
|
8.00
|
finished fuel covers, prepped for de-ice cuff bond
|
Details
|
|
|
08-11-2006
|
13.00
|
installed pitch & yaw a/p servos assoc. electroni
|
Details
|
|
|
08-11-2006
|
7.50
|
created mold for fuel line cover ahead of rear sea
|
Details
|
|
|
08-10-2006
|
7.50
|
finished passenger seat bottom, cut pre-lam for bu
|
Details
|
|
|
08-09-2006
|
8.00
|
finished rear seat bottom installation w/ gap seal
|
Details
|
|
|
08-08-2006
|
6.00
|
released carbon gap seals from fuselage, trimmed &
|
Details
|
|
|
08-07-2006
|
8.00
|
trimmed rear seat bottom flange, filled hole edge
|
Details
|
|
|
08-07-2006
|
8.00
|
applied release tape layers to fuselage sides, lam
|
Details
|
|
|
08-05-2006
|
3.50
|
trimmed passenger seat bottom flange, finished 4 B
|
Details
|
|
|
08-04-2006
|
6.00
|
nutplates installed on passenger seat bottom, prep
|
Details
|
|
|
08-03-2006
|
7.00
|
phenolic hardpoint in seat bottom, created & insta
|
Details
|
|
|
08-02-2006
|
8.00
|
created 4 BID fiberglass channel, made flange on h
|
Details
|
|
|
08-02-2006
|
8.00
|
changed access from rear seat bottom by filling in
|
Details
|
|
|
08-01-2006
|
5.00
|
installed hard points in hat rack & baggage floor
|
Details
|
|
|
07-31-2006
|
8.00
|
laminated "hat rack" flanges for baggage bulkhead,
|
Details
|
|
|
07-31-2006
|
8.00
|
installed nutplates in baggage floor panel, made c
|
Details
|
|
|
07-31-2006
|
5.50
|
installed evaporator mount to upper seat bulkhead,
|
Details
|
|
|
07-28-2006
|
5.50
|
trimmed & fit back seat press. bulkhead, trimmed &
|
Details
|
|
|
07-27-2006
|
5.00
|
worked on wingtip items, started working on baggag
|
Details
|
|
|
07-27-2006
|
5.50
|
fit brake cylinders, fab & fit tip lights & lens
|
Details
|
|
|
07-25-2006
|
7.00
|
finished inside window sanding, bodywork door fram
|
Details
|
|
|
07-24-2006
|
8.00
|
finished sanding around all inside windows, remove
|
Details
|
|
|
07-24-2006
|
6.00
|
completed rudder cable installation
|
Details
|
|
|
07-20-2006
|
8.00
|
reinstalled fine line tape around windows, sanded
|
Details
|
|
|
07-19-2006
|
8.50
|
prepped and sprayed primer to upper fuselage half
|
Details
|
|
|
07-18-2006
|
16.00
|
finished body work on fuselage upper half and wind
|
Details
|
|
|
07-18-2006
|
4.00
|
elevator p/p tube fab, rudder p/p tubes lengths de
|
Details
|
|
|
07-17-2006
|
14.50
|
bodywork fuselage upper half in preparation for pr
|
Details
|
|
|
07-15-2006
|
5.00
|
covered all holes in exterior of fuselage w/ carbo
|
Details
|
|
|
07-14-2006
|
16.00
|
sanded laminates around outside windows, laminated
|
Details
|
|
|
07-13-2006
|
5.00
|
sanded outside of windows/windscreen on fuselage
|
Details
|
|
|
07-12-2006
|
12.00
|
tail inspection panel laminates, laminates over RH
|
Details
|
|
|
07-10-2006
|
7.50
|
finished sanding outside of windows, removed blue
|
Details
|
|
|
07-07-2006
|
7.00
|
sanded & applied micro to bevel around windows, st
|
Details
|
|
|
07-06-2006
|
7.50
|
sign strip windows
|
Details
|
|
|
07-05-2006
|
5.00
|
assembled internal rudder bellcrank, trimmed fusel
|
Details
|
|
|
03-22-2006
|
90.00
|
Winglets/fuel system/center console/pedestal
|
Details
|
|
|
01-07-2006
|
60.00
|
Hydraulics and fuel system
|
Details
|
|
|
11-09-2005
|
55.00
|
Butt cheeks mounted, Baggage floor. rear hydrauli
|
Details
|
|
|
10-31-2005
|
68.00
|
labor 10/05
|
|
|
|
10-15-2005
|
65.00
|
Top, belly tank
|
Details
|
|
|
09-30-2005
|
21.25
|
labor for 9/05
|
|
|
|
08-20-2005
|
46.00
|
Pressure bulked with fast build up/lowe mounts
|
Details
|
|
|
06-22-2005
|
80.00
|
Belly Tank
|
Details
|
|
|
05-19-2005
|
72.00
|
Ailerons/flaps/gear door-well
|
Details
|
|
|
05-03-2005
|
60.00
|
labor for 4/05
|
|
|
|
04-23-2005
|
80.00
|
WIng fillets, aileron travel, body work, gear door
|
Details
|
|
|
03-05-2005
|
23.50
|
labor for 3/05
|
|
|
|
02-01-2005
|
60.00
|
Gear doors elevator
|
Details
|
|
|
01-03-2005
|
5.00
|
Labor on kit 12/04
|
|
|