Powered By Kitlog Pro v2.0
Ebby's Hatz Classic
Classic
Fuselage
Work Logs Found:
141
Category Work Time:
346 Hours
Date
Hours
Work Log Summary
Details
07-01-2005
3.00
Fuel Shutoff Bracket
Details
07-01-2005
1.50
Fairlead Stanchion for Fuel shutoff lever
Details
06-19-2005
2.00
Rear Cabane Attach Point-complete
Details
06-19-2005
4.50
Fuel Shutoff Bracket
Details
06-12-2005
2.00
Rear Cabane attachment point
Details
06-12-2005
1.50
Rear Cabane Attachment
Details
06-05-2005
2.50
Cabane Attachment fitting
Details
03-09-2005
3.00
Landing Gear Washers for struts
Details
03-06-2005
2.50
Landing Gear Washer mounts.
Details
03-01-2005
2.00
Landing Gear Forward fitting
Details
02-28-2005
1.50
Gear/Wing Attachment
Details
02-27-2005
2.00
Landing Gear Attachment point
Details
02-27-2005
1.50
Gear/Wing Attachment
Details
02-26-2005
6.00
Gear/Wing Attachment
Details
02-25-2005
2.00
Gear/Wing Attachment
Details
02-22-2005
2.00
Gear/Wing Attachment
Details
02-21-2005
2.00
Gear/Wing Attachments
Details
02-14-2005
0.50
Landing Gear Attachment
Details
02-10-2005
2.00
Gear/Wing Attachments
Details
02-08-2005
2.00
Gear/Wing
Details
02-07-2005
2.00
Gear/wing Attachments
Details
02-03-2005
0.50
Gear/Wing Attachment
Details
02-01-2005
1.00
Landing gear forward attach bracket
Details
01-30-2005
2.00
Landing Gear-End fitting weldment
Details
01-30-2005
1.00
Landing Gear-Axle and cross brace.
Details
01-26-2005
1.00
Landing Gear-Strut end clamped
Details
01-24-2005
1.00
Landing Gear-two ends are finish welded.
Details
01-23-2005
1.50
Landing Gear-Welding the end fitting.
Details
01-22-2005
1.00
Landing gear strut.
Details
01-20-2005
0.50
Landing Gear-Vee support.
Details
01-19-2005
3.00
Landing Gear-Axle shaping.
Details
01-17-2005
2.00
Landing Gear-welding spring retainer bushings
Details
01-17-2005
1.50
Landing Gear-Spring retainer.
Details
01-15-2005
3.00
Landing Gear Notching the legs for welding.
Details
01-15-2005
2.00
Landing Gear Axles welding rosettes
Details
01-11-2005
1.00
Landing Gear Axel
Details
01-10-2005
2.00
Landing Gear Legs
Details
01-06-2005
2.50
Forward Gear Attachment Brackett
Details
12-31-2004
2.50
Welding in bushing for engine mounts.
Details
12-31-2004
1.00
Backside of engine mount bushing.
Details
12-26-2004
2.00
Engine mount washer
Details
12-24-2004
3.50
Engine mount gussets
Details
12-10-2004
2.00
Engine mount gusset ensemble
Details
11-14-2004
4.00
Installing floorboard brackets.
Details
11-10-2004
3.50
Engine mount gussets
Details
11-03-2004
2.00
Two additional brackets for floorboards
Details
11-01-2004
2.00
Floorboard supports
Details
04-04-2004
2.00
Cutting Pieces for the Rudder Pedals
Details
02-28-2004
1.75
Push Tube Idler
Details
02-28-2004
0.50
Push Tube Idler
Details
02-25-2004
1.50
Control stick bushing and mounting
Details
02-25-2004
1.50
Control Stick Bushing
Details
02-24-2004
1.00
Welding on doubler plates.
Details
02-24-2004
0.50
Push Tube Idler
Details
02-23-2004
2.00
Push Tube End from torque tube to idler.
Details
02-22-2004
2.50
Control stick inner push tube connection
Details
02-22-2004
2.50
Control stick attached to pushtube.
Details
02-21-2004
2.00
Welding and fitting in bushings.
Details
02-19-2004
2.00
Forward bearing stops.
Details
02-19-2004
2.00
Drilling holes for the control stick.
Details
02-16-2004
2.00
Making a torque tube flange
Details
02-16-2004
2.00
Attaching the flange to the torque tube.
Details
02-15-2004
1.50
Torque tube support stantions.
Details
02-15-2004
1.00
Torque Tube control stick flanges
Details
02-15-2004
3.00
Installing bearing blocks and supports.
Details
02-14-2004
2.00
Push Tube Square End Fitting
Details
02-12-2004
0.75
Push Tube Square End Fitting
Details
02-12-2004
0.50
Push Tube Square End Fitting
Details
02-12-2004
1.50
Push tube end fitting.
Details
02-11-2004
1.00
Push Tube Square End Fitting
Details
02-10-2004
0.50
Push Tube Square End Fitting
Details
02-03-2004
5.50
Push Tube Idler
Details
01-12-2004
3.00
Engine mount gussets
Details
01-01-2004
4.50
Engine mount gussets
Details
11-11-2003
2.00
Finished welding main fuselage.
Details
11-10-2003
2.00
Prep and weld clusters.
Details
11-09-2003
2.00
Prep and weld clusters
Details
11-06-2003
2.00
Prep and welding clusters.
Details
11-04-2003
1.00
Prep and weld seat belt attach point.
Details
11-02-2003
0.50
Preping clusters for welding.
Details
10-18-2003
0.25
Roll Wire Lug
Details
10-18-2003
1.50
Roll Wire Lug
Details
10-18-2003
0.50
Roll Wire Lug
Details
09-16-2003
2.50
Seat belt attachment
Details
09-13-2003
2.50
Cross piece for seatbelt harness attach
Details
09-10-2003
3.50
Major Cluster
Details
09-08-2003
2.00
Major Cluster
Details
09-04-2003
2.50
Diagonals in the tail section
Details
09-02-2003
2.50
Fitting diagonals in the tail section.
Details
09-01-2003
1.50
Fitting a diagonal.
Details
08-31-2003
2.00
Fitting in the diagonals
Details
08-30-2003
3.50
Tacking the upper tail longerons
Details
08-28-2003
4.00
Joining the longerons at the tail.
Details
08-27-2003
2.00
The bending in process begins.
Details
08-27-2003
2.50
Bending in the tail section.
Details
08-25-2003
3.00
Tape Tack Technique
Details
08-18-2003
4.00
Truing the fuselage with custom clamp
Details
08-17-2003
4.50
Truing the fuselage with pipe clamps
Details
08-14-2003
2.00
Using a Fitting String to create angles of inciden
Details
08-13-2003
2.50
Truing the fuselage with help.
Details
08-12-2003
1.00
Keeping things aligned
Details
08-11-2003
3.00
Installing Diagonals
Details
08-11-2003
12.00
Fitting a cluster
Details
08-07-2003
2.00
Fitting the cross tubes.
Details
08-06-2003
3.00
Truing the fuselage with wooden supports.
Details
08-05-2003
6.00
Fitting cross members.
Details
08-04-2003
6.00
Fitting in the cross members
Details
08-03-2003
4.50
Truing up the fuselage with wooden supports
Details
07-30-2003
3.50
Setup for top and bottom of fueslage.
Details
07-29-2003
6.00
Jigging and truing the fuselage sides
Details
07-27-2003
2.00
Laying out the fuselage pattern
Details
07-26-2003
4.00
Transfer plans to full size layout
Details
07-26-2003
4.50
Tack welding the other side
Details
07-25-2003
2.50
Preping tube ends for tack welding
Details
07-25-2003
2.50
Drilling oiling holes at each diagonal
Details
07-24-2003
1.00
Tubing spacers
Details
07-21-2003
4.00
Marking Tubes For Fishmouth cuts
Details
07-21-2003
2.00
Cutting fishmouth with joint jigger
Details
07-20-2003
4.00
Cutting webs for the other side.
Details
07-20-2003
1.00
Another Day another side.
Details
07-19-2003
4.00
Started Tack Welding
Details
07-19-2003
5.50
Fitting the diagonals
Details
07-19-2003
2.00
Closing in on finishing side one.
Details
07-18-2003
6.50
Fitting diagonals
Details
07-14-2003
1.00
Typical Joint Construction
Details
07-11-2003
0.10
Layed out the side before fitting joints
Details
07-11-2003
2.50
Bending the lower longeron
Details
07-08-2003
3.00
Fuselage sides
Details
07-07-2003
4.00
Laying out the fuselage side patterns.
Details
06-19-2003
1.50
Landing Gear Strut
Details
06-18-2003
3.00
Landing Gear
Details
06-12-2003
3.00
Landing Gear Strut
Details
06-10-2003
4.00
Landing Gear Strut
Details
06-07-2003
2.50
Gear Strut End
Details
06-04-2003
0.50
Landing gear end doubler
Details
05-24-2003
1.50
Practice end fitting for landing gear.
Details
03-06-2003
4.00
Stop Washers for Landing Gear Springs
Details
02-26-2003
5.00
Spring Gear Bushings
Details
02-20-2003
5.00
Landing Gear Axels
Details
02-03-2003
2.50
Interplane Doubler straps.
Details
02-03-2003
4.50
Control Tube End lugs.
Details
SITE NAVIGATION
Contact Builder
Classic Home
Category
# Logs
# Hours
All
239
616
Cowling
3
6
Empennage
69
196
Engine
4
11
Firewall Forward
7
24
Fuselage
141
346
Instruments
6
12
Shop Supplies
5
12
Systems
1
1
Tools
1
4
Wings
2
4
Copyright © 2001-2024 Matronics. All Rights Reserved.