KitLog pro

Powered By Kitlog Pro v2.0

Ebby's Hatz Classic
Work Logs Found: 141
Category Work Time: 346 Hours
 Date
Hours
Work Log Summary

Details

 07-01-2005
3.00
Fuel Shutoff Bracket
Details
       

 07-01-2005
1.50
Fairlead Stanchion for Fuel shutoff lever
Details
       

 06-19-2005
2.00
Rear Cabane Attach Point-complete
Details
       

 06-19-2005
4.50
Fuel Shutoff Bracket
Details
       

 06-12-2005
2.00
Rear Cabane attachment point
Details
       

 06-12-2005
1.50
Rear Cabane Attachment
Details
       

 06-05-2005
2.50
Cabane Attachment fitting
Details
       

 03-09-2005
3.00
Landing Gear Washers for struts
Details
       

 03-06-2005
2.50
Landing Gear Washer mounts.
Details
       

 03-01-2005
2.00
Landing Gear Forward fitting
Details
       

 02-28-2005
1.50
Gear/Wing Attachment
Details
       

 02-27-2005
2.00
Landing Gear Attachment point
Details
       

 02-27-2005
1.50
Gear/Wing Attachment
Details
       

 02-26-2005
6.00
Gear/Wing Attachment
Details
       

 02-25-2005
2.00
Gear/Wing Attachment
Details
       

 02-22-2005
2.00
Gear/Wing Attachment
Details
       

 02-21-2005
2.00
Gear/Wing Attachments
Details
       

 02-14-2005
0.50
Landing Gear Attachment
Details
     

 02-10-2005
2.00
Gear/Wing Attachments
Details
     

 02-08-2005
2.00
Gear/Wing
Details
     

 02-07-2005
2.00
Gear/wing Attachments
Details
     

 02-03-2005
0.50
Gear/Wing Attachment
Details
     

 02-01-2005
1.00
Landing gear forward attach bracket
Details
     

 01-30-2005
2.00
Landing Gear-End fitting weldment
Details
       

 01-30-2005
1.00
Landing Gear-Axle and cross brace.
Details
       

 01-26-2005
1.00
Landing Gear-Strut end clamped
Details
     

 01-24-2005
1.00
Landing Gear-two ends are finish welded.
Details
     

 01-23-2005
1.50
Landing Gear-Welding the end fitting.
Details
       

 01-22-2005
1.00
Landing gear strut.
Details
       

 01-20-2005
0.50
Landing Gear-Vee support.
Details
     

 01-19-2005
3.00
Landing Gear-Axle shaping.
Details
       

 01-17-2005
2.00
Landing Gear-welding spring retainer bushings
Details
       

 01-17-2005
1.50
Landing Gear-Spring retainer.
Details
       

 01-15-2005
3.00
Landing Gear Notching the legs for welding.
Details
       

 01-15-2005
2.00
Landing Gear Axles welding rosettes
Details
       

 01-11-2005
1.00
Landing Gear Axel
Details
       

 01-10-2005
2.00
Landing Gear Legs
Details
       

 01-06-2005
2.50
Forward Gear Attachment Brackett
Details
       

 12-31-2004
2.50
Welding in bushing for engine mounts.
Details
       

 12-31-2004
1.00
Backside of engine mount bushing.
Details
     

 12-26-2004
2.00
Engine mount washer
Details
       

 12-24-2004
3.50
Engine mount gussets
Details
       

 12-10-2004
2.00
Engine mount gusset ensemble
Details
       

 11-14-2004
4.00
Installing floorboard brackets.
Details
       

 11-10-2004
3.50
Engine mount gussets
Details
       

 11-03-2004
2.00
Two additional brackets for floorboards
Details
       

 11-01-2004
2.00
Floorboard supports
Details
       

 04-04-2004
2.00
Cutting Pieces for the Rudder Pedals
Details
       

 02-28-2004
1.75
Push Tube Idler
Details
       

 02-28-2004
0.50
Push Tube Idler
Details
       

 02-25-2004
1.50
Control stick bushing and mounting
Details
       

 02-25-2004
1.50
Control Stick Bushing
Details
       

 02-24-2004
1.00
Welding on doubler plates.
Details
       

 02-24-2004
0.50
Push Tube Idler
Details
       

 02-23-2004
2.00
Push Tube End from torque tube to idler.
Details
       

 02-22-2004
2.50
Control stick inner push tube connection
Details
       

 02-22-2004
2.50
Control stick attached to pushtube.
Details
       

 02-21-2004
2.00
Welding and fitting in bushings.
Details
     

 02-19-2004
2.00
Forward bearing stops.
Details
       

 02-19-2004
2.00
Drilling holes for the control stick.
Details
       

 02-16-2004
2.00
Making a torque tube flange
Details
       

 02-16-2004
2.00
Attaching the flange to the torque tube.
Details
       

 02-15-2004
1.50
Torque tube support stantions.
Details
       

 02-15-2004
1.00
Torque Tube control stick flanges
Details
       

 02-15-2004
3.00
Installing bearing blocks and supports.
Details
       

 02-14-2004
2.00
Push Tube Square End Fitting
Details
       

 02-12-2004
0.75
Push Tube Square End Fitting
Details
       

 02-12-2004
0.50
Push Tube Square End Fitting
Details
       

 02-12-2004
1.50
Push tube end fitting.
Details
       

 02-11-2004
1.00
Push Tube Square End Fitting
Details
       

 02-10-2004
0.50
Push Tube Square End Fitting
Details
       

 02-03-2004
5.50
Push Tube Idler
Details
       

 01-12-2004
3.00
Engine mount gussets
Details
       

 01-01-2004
4.50
Engine mount gussets
Details
       

 11-11-2003
2.00
Finished welding main fuselage.
Details
     

 11-10-2003
2.00
Prep and weld clusters.
Details
     

 11-09-2003
2.00
Prep and weld clusters
Details
     

 11-06-2003
2.00
Prep and welding clusters.
Details
       

 11-04-2003
1.00
Prep and weld seat belt attach point.
Details
       

 11-02-2003
0.50
Preping clusters for welding.
Details
     

 10-18-2003
0.25
Roll Wire Lug
Details
       

 10-18-2003
1.50
Roll Wire Lug
Details
       

 10-18-2003
0.50
Roll Wire Lug
Details
     

 09-16-2003
2.50
Seat belt attachment
Details
       

 09-13-2003
2.50
Cross piece for seatbelt harness attach
Details
       

 09-10-2003
3.50
Major Cluster
Details
     

 09-08-2003
2.00
Major Cluster
Details
       

 09-04-2003
2.50
Diagonals in the tail section
Details
       

 09-02-2003
2.50
Fitting diagonals in the tail section.
Details
       

 09-01-2003
1.50
Fitting a diagonal.
Details
     

 08-31-2003
2.00
Fitting in the diagonals
Details
       

 08-30-2003
3.50
Tacking the upper tail longerons
Details
       

 08-28-2003
4.00
Joining the longerons at the tail.
Details
       

 08-27-2003
2.00
The bending in process begins.
Details
       

 08-27-2003
2.50
Bending in the tail section.
Details
       

 08-25-2003
3.00
Tape Tack Technique
Details
       

 08-18-2003
4.00
Truing the fuselage with custom clamp
Details
       

 08-17-2003
4.50
Truing the fuselage with pipe clamps
Details
     

 08-14-2003
2.00
Using a Fitting String to create angles of inciden
Details
       

 08-13-2003
2.50
Truing the fuselage with help.
Details
       

 08-12-2003
1.00
Keeping things aligned
Details
       

 08-11-2003
3.00
Installing Diagonals
Details
       

 08-11-2003
12.00
Fitting a cluster
Details
       

 08-07-2003
2.00
Fitting the cross tubes.
Details
     

 08-06-2003
3.00
Truing the fuselage with wooden supports.
Details
       

 08-05-2003
6.00
Fitting cross members.
Details
       

 08-04-2003
6.00
Fitting in the cross members
Details
       

 08-03-2003
4.50
Truing up the fuselage with wooden supports
Details
       

 07-30-2003
3.50
Setup for top and bottom of fueslage.
Details
       

 07-29-2003
6.00
Jigging and truing the fuselage sides
Details
       

 07-27-2003
2.00
Laying out the fuselage pattern
Details
     

 07-26-2003
4.00
Transfer plans to full size layout
Details
       

 07-26-2003
4.50
Tack welding the other side
Details
       

 07-25-2003
2.50
Preping tube ends for tack welding
Details
       

 07-25-2003
2.50
Drilling oiling holes at each diagonal
Details
       

 07-24-2003
1.00
Tubing spacers
Details
       

 07-21-2003
4.00
Marking Tubes For Fishmouth cuts
Details
       

 07-21-2003
2.00
Cutting fishmouth with joint jigger
Details
       

 07-20-2003
4.00
Cutting webs for the other side.
Details
     

 07-20-2003
1.00
Another Day another side.
Details
       

 07-19-2003
4.00
Started Tack Welding
Details
       

 07-19-2003
5.50
Fitting the diagonals
Details
       

 07-19-2003
2.00
Closing in on finishing side one.
Details
       

 07-18-2003
6.50
Fitting diagonals
Details
       

 07-14-2003
1.00
Typical Joint Construction
Details
       

 07-11-2003
0.10
Layed out the side before fitting joints
Details
     

 07-11-2003
2.50
Bending the lower longeron
Details
       

 07-08-2003
3.00
Fuselage sides
Details
       

 07-07-2003
4.00
Laying out the fuselage side patterns.
Details
       

 06-19-2003
1.50
Landing Gear Strut
Details
       

 06-18-2003
3.00
Landing Gear
Details
       

 06-12-2003
3.00
Landing Gear Strut
Details
       

 06-10-2003
4.00
Landing Gear Strut
Details
       

 06-07-2003
2.50
Gear Strut End
Details
       

 06-04-2003
0.50
Landing gear end doubler
Details
       

 05-24-2003
1.50
Practice end fitting for landing gear.
Details
       

 03-06-2003
4.00
Stop Washers for Landing Gear Springs
Details
       

 02-26-2003
5.00
Spring Gear Bushings
Details
       

 02-20-2003
5.00
Landing Gear Axels
Details
       

 02-03-2003
2.50
Interplane Doubler straps.
Details
     

 02-03-2003
4.50
Control Tube End lugs.
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.