Powered By Kitlog Pro v2.0
ROBERT'S WEB SITE
RV7
Engine
Work Logs Found:
24
Category Work Time:
87 Hours
Date
Hours
Work Log Summary
Details
07-20-2021
4.00
J-3 L mag and J-4 R mag to starter switch
07-01-2021
4.00
Wiring of Altenator and mag
06-30-2021
3.00
Work on Mag L/R wiring
Details
11-18-2020
4.00
Fuel flow mount
11-16-2020
6.00
CHT/ EGT cables and prep for rivitting
Details
11-15-2020
4.00
installing egnine sensors
11-13-2020
5.00
Oil and fuel pressure mounts/GRT remote EIS
10-05-2020
3.00
Baffel rods redone
Details
10-03-2020
4.00
more work on engine cables
10-01-2020
3.00
Installed some engine cables
Details
09-04-2020
4.00
Fab air to carb work
08-31-2020
4.00
FAB air work to carb
08-19-2020
4.00
air inlet to carb work
Details
04-23-2020
4.00
Cut the VA-131--C to fit the Carb
01-06-2020
3.00
Baffel
Details
01-03-2020
3.00
Installed 60 amp Hartselll alternator / carb
01-03-2020
1.00
Added 8 quarts of Aeroshell 100 break in oil
Details
01-02-2020
2.00
Drain shipping preservation oil from engine
01-01-2020
4.00
Engine mount
Details
09-21-2019
4.00
Engine mount to firwall re tourque bolts
Details
09-17-2019
4.00
Engine mount
Details
08-29-2019
4.00
Gear legs fitting engine mount
Details
08-28-2019
4.00
setting up to install engine mount, gear legs
07-09-2019
2.00
New engine
Details
SITE NAVIGATION
Contact Builder
RV7 Home
Category
# Logs
# Hours
All
793
5634
After Inspection
1
11
AIR FILTER BOX
14
116
auto pilot
2
17
Avionics
1
78
Brakes
8
32
Canopy
1
282
Cowling
22
234
Electrical
1
129
Empennage
61
490
Engine
24
176
Engine Baffles
39
240
Engine exhaust
1
5
extra parts
1
8
Firewall forward kit
5
91
Firwall forward kit
5
91
Fuselage
293
1663
Lights/strobes
8
64
Miscellaneous
1
31
Panel
8
358
PITOT/STATIC SYSTEM
5
39
Prop
5
23
SPINNER
2
32
Tanks
89
369
Tools
3
12
Wings
186
988
Wiring & connectors
7
55
RV-7 Home
Copyright © 2001-2025 Matronics. All Rights Reserved.