Powered By Kitlog Pro v2.0
ROBERT'S WEB SITE
RV7
Fuselage
Work Logs Found:
293
Category Work Time:
1223 Hours
Date
Hours
Work Log Summary
Details
12-08-2020
6.00
forward fuselage assembly
Details
12-07-2020
5.00
forward fuselage assembly
Details
05-13-2020
3.00
Sanding fiberglass to 1/8 clearance on HS-VS tips
05-07-2020
5.00
Finished riveting F-775 rear top skin to lower ski
05-04-2020
4.00
Set up to rivet F-775 top skin
Details
12-26-2019
4.00
F-794B to aft top skin
Details
12-25-2019
4.00
work HS Fiberglass tip L side HS
Details
12-24-2019
4.00
Work on F-794B
12-23-2019
4.00
LS empenage Gap cover
Details
12-21-2019
4.00
F-794B work
Details
12-20-2019
4.00
work on F-794B
Details
12-19-2019
4.00
Rudder/ VS work
Details
12-18-2019
4.00
Rudder stops
Details
12-16-2019
4.00
Rrudder stops
Details
12-13-2019
3.00
Rudder stops
Details
12-12-2019
3.00
Redoing rudder stops
12-10-2019
5.00
Adjusting rudder rod
12-09-2019
3.00
Rudder bolts
Details
12-04-2019
4.00
Installed the VS again
Details
12-03-2019
4.00
HS-615 ffitting
Details
12-02-2019
4.00
Recheck for vertcal distance, VS riveting
Details
11-25-2019
4.00
VS mounting
Details
11-24-2019
4.00
VS
Details
11-19-2019
4.00
Removed VS after drilling holes in F-712D to aft d
Details
11-18-2019
4.00
Aft Deck and VS 702
Details
11-17-2019
4.00
F-712D
Details
11-16-2019
4.00
More work on aft deck
11-15-2019
4.00
Riveted most od the Aft deck on
Details
11-14-2019
4.00
Prep for riveting the aft deck
Details
11-13-2019
4.00
work on mounting VS
Details
11-10-2019
3.00
Riveting F-790
Details
11-09-2019
4.00
More Work on elevators
11-08-2019
4.00
More Work on elevators
11-06-2019
4.00
More Work on elevators
11-05-2019
3.00
Elevator & Push Rod
Details
11-04-2019
4.00
Trimming F-714
Details
11-03-2019
3.00
Installing/riveting some rivets in aft elevators
11-02-2019
5.00
Elevator to HS work
Details
11-01-2019
4.00
Drilling the elevator horns
Details
10-31-2019
4.00
Work on Elevator
Details
10-30-2019
4.00
More work on elevator install to HS
10-26-2019
4.00
Elevators
Details
10-25-2019
4.00
Measuring/Drilling HS
10-24-2019
4.00
Measuring and drilling HS
10-23-2019
4.00
More work on fitting HS
10-22-2019
4.00
F-711E
Details
10-21-2019
5.00
measuring/fitting HS
10-20-2019
5.00
F-773 aft fuselage
Details
10-17-2019
4.00
Work on aft deck
Details
10-16-2019
4.00
Aft Deck andrelated parts
Details
10-15-2019
6.00
F-714
Details
10-13-2019
2.00
Work on upper forward ribs to firewall
Details
10-01-2019
4.00
static port
Details
09-29-2019
4.00
Fuel vent line screen
Details
09-24-2019
4.00
Rudder control cable parts
Details
09-20-2019
4.00
Finish fuel vent lines
Details
08-23-2019
6.00
Fuel vent install
Details
08-12-2019
4.00
Work on fuel lines
08-07-2019
4.00
Re Cutting 3/8" fuel tubing fuel for better fit
08-06-2019
4.00
Park brake
Details
08-05-2019
4.00
Brake tubing and Park brake
08-02-2019
4.00
Work on brakes tubing
07-30-2019
6.00
Work on brake tubes etc.
07-29-2019
5.00
Work on Brake tubing
07-27-2019
4.00
Forward section bulkhead
Details
07-26-2019
3.00
Fuel line work
Details
07-25-2019
4.00
Work on fuel lines
07-23-2019
4.00
Heater Bracket
Details
07-22-2019
6.00
Heat fire wall bracket
Details
07-21-2019
4.00
Gasolator install
Details
07-20-2019
4.00
Mount Gasalator to fire wall
Details
07-18-2019
4.00
Roll bar nuts
Details
07-17-2019
3.00
Spent 3 hours trying to find the brake tee
Details
07-17-2019
4.00
Finished the floor cover nut plates
07-15-2019
5.00
work on front floor covers F-782C
Details
07-10-2019
3.00
more work on battery mount and MR an SR
Details
07-05-2019
4.00
Battery bracket install
Details
07-04-2019
5.00
more work on battery install
07-02-2019
4.00
ES-PC 680 battery mount
Details
06-28-2019
4.00
Mounting ES-40108 Facet electric fuel pump etc
Details
06-27-2019
4.00
Clecoed top skin for marking the roll bar drilling
Details
06-26-2019
6.00
Top front skin
Details
06-25-2019
4.00
F-721A L/R
Details
06-24-2019
5.00
F--718 L/R longerons F-720 L/R
Details
06-22-2019
4.00
F-793 heat brackets
Details
06-21-2019
4.00
F-721C and F-721D
Details
06-20-2019
4.00
F-7103C L/R
Details
06-19-2019
3.00
C-668
Details
06-18-2019
5.00
C-668
Details
06-17-2019
5.00
WD-641 Roll bar
Details
06-15-2019
4.00
F-7103C L/R
Details
06-14-2019
4.00
Fabricated F7103C
Details
06-13-2019
4.00
Fabricated F-7108
06-12-2019
4.00
Dimpled F-768B L/R, F-745 L/R
06-10-2019
4.00
Work on top skin to ribs/panel
06-09-2019
4.00
Still fittiing ribs etc for a better fit of the to
06-08-2019
4.00
Fitting top front skin
Details
06-07-2019
4.00
Riveting front side skins
Details
06-06-2019
4.00
Work on WD-641 Roll Bar setting
Details
06-04-2019
6.00
Riveting seat floors to ribs
06-02-2019
5.00
Work on F-742 L/R seat floor
Details
05-31-2019
3.00
More work on aft baggage
05-29-2019
4.00
Finished riveting nut plates on F-652 & F-751
05-28-2019
4.00
Baggage compartment
Details
05-27-2019
3.00
Aft baggage compartment
Details
05-22-2019
5.00
baggage floor riveting
Details
05-14-2019
5.00
Work on aft Baggage floor
05-13-2019
4.00
Details
05-11-2019
4.00
Work on F-747 R/L
Details
05-10-2019
5.00
Fitting WD-613 EF
Details
05-05-2019
3.00
Fitting 613-EF flap actuator mount
05-04-2019
4.00
Removed baggage floor F-748 & F-766A
Details
05-03-2019
4.00
Flap installation
04-26-2019
3.00
Electric flaps
Details
04-25-2019
5.00
Electric flaps
Details
04-24-2019
5.00
Finding Part F-758 L/R
Details
04-23-2019
5.00
Electric flaps
Details
04-22-2019
5.00
Electric flaps build
Details
04-20-2019
4.00
Manufactured parts for electric Flaps
Details
01-27-2019
4.00
F-695 Gussets
Details
01-25-2019
5.00
F-695 gusets
Details
01-23-2019
5.00
Fitting F-695 Gussets
01-22-2019
4.00
After fitting top panel skin removed it and drille
Details
01-18-2019
6.00
Drilling F-675 L/R per DWG 23
01-14-2019
6.00
More skin riveting
01-08-2019
6.00
More skin riveting and drilling F695 L/R
01-07-2019
6.00
More skin riveting
01-03-2019
6.00
More skin riveting
01-02-2019
6.00
More skin riveting
01-02-2019
6.00
More riveting etc
12-29-2018
6.00
more Fuselage skin riveting
12-27-2018
6.00
Riveting left side skins to fuselage
12-25-2018
6.00
Riveting right side skins to fuselage
12-18-2018
6.00
Bolts to Aft center bulkhead and all F-716 front r
12-17-2018
4.00
Trimed F-717-S R/L and front lower bolts to F-704B
Details
12-11-2018
3.00
work on F-652 upper baggage bulk head
Details
12-10-2018
3.00
work on drilling F-724 L/R lower tab's
Details
11-28-2018
6.00
Arrival of fire wall anf finishing kits
Details
11-26-2018
4.00
More work on baggage area
Details
11-24-2018
5.00
more work on rear baggage area
Details
11-21-2018
5.00
Started working on the baggage area
Details
11-19-2018
3.00
Details
11-16-2018
5.00
Riveting
Details
11-15-2018
4.00
Rivet F-6118 to F-601N-L
11-14-2018
4.00
Refabricated Lower front longerron
Details
11-13-2018
4.00
removed left side skin to dimple
Details
11-10-2018
5.00
Moving the 2 sections of the fuselage
Details
11-09-2018
5.00
finished the 2 benches
11-08-2018
5.00
Building a low bench for fuselage
11-04-2018
4.00
Removed all parts connected to F-902 L/R
Details
11-03-2018
4.00
Finished dimpling R side skin
11-02-2018
4.00
started rivetting R side forward skin
11-01-2018
4.00
Finished rivetitng forwar bottom skin
10-31-2018
4.00
Rivet forward bottom skin F-772
10-28-2018
5.00
Rivet section of F-730 plate to F-728 B& F-729B
10-27-2018
4.00
Riveting F-728 bell crank chanell
Details
10-26-2018
6.00
Fit F-728B,F-729B,F-730 plate to F-706 bulk head
10-25-2018
5.00
prep to rivet F-706B to ribs
Details
10-24-2018
4.00
CS upper right longeron debur etc.
10-23-2018
5.00
CS upper left longeron debur etc,
10-22-2018
5.00
dimpled and counter sink in F-772 bottom front ski
10-20-2018
6.00
Removed both front side skins &lower F-772 skin
10-19-2018
4.00
Finished floor stiffeners drilled/deburred
Details
10-18-2018
4.00
removed F-902 R/L installed 4 nut plates
Details
10-16-2018
4.00
Rudder pedal work
10-04-2018
5.00
drill pedal to brake cylinders
09-24-2018
4.00
work on rudder pedals
09-21-2018
4.00
measuring and drilling rudder pedals
09-20-2018
4.00
work on rudder pedals
09-16-2018
4.00
Fabricated F-6118 Rudder pedal brace per manual
Details
09-15-2018
4.00
Installed the fire wall recess to fit with F-611
09-14-2018
4.00
Work on Rudder control pedals
Details
09-13-2018
4.00
manufactured another F-782 D angle
09-12-2018
4.00
work on new F-7101-L
Details
09-11-2018
3.00
clecoed F-770-L back on to drill angle clip F-719B
Details
09-09-2018
4.00
Drilled F-7101-L for K1000-08 nut plates
Details
09-04-2018
2.00
Manufacturing F-782D
08-30-2018
5.00
Fabricating( 2) F-719
08-28-2018
3.00
Measured and drilled F-772 B-R& F-772B-L floor sti
08-26-2018
2.00
Drilled lower engine bracket to lower logeron for
Details
08-24-2018
3.00
Removed all clecos from L side skins for dimpling
08-22-2018
4.00
Bolted F-684 , Drilled F-717 lower skin L/R etc.
08-20-2018
6.00
Clecoed F-684 gusset, clecoed F-722 on L/R
Details
08-19-2018
4.00
Work on drilling the F-684 Gusset
08-16-2018
4.00
Drilled lower engine bracket holes SEC- L DWG-23
08-15-2018
6.00
work on F-7114 and F-7101-L
Details
08-11-2018
4.00
Fitting in F-7114-L& F-7101-L
08-10-2018
4.00
trimed F-717 to 26-1/2" instead of 26 5/8" to fit
Details
08-08-2018
4.00
Fabricate lower lngerons
Details
08-07-2018
4.00
Fabricate F-719 B L/R
08-06-2018
4.00
Got a HF engine stand so spent time picking it up
Details
08-02-2018
4.00
Trimed F-713-R
Details
08-01-2018
5.00
Finished drilling F-601A-2
Details
07-31-2018
4.00
Final drilling fire wall to skins
07-30-2018
4.00
more work on fitting RF-718 L/R
07-29-2018
3.00
Trim F-718 longerons
Details
07-24-2018
3.00
Fire wall fitting to longeron
07-23-2018
4.00
Clecoed F-772 bottom skin to F-404 A&B
Details
07-22-2018
3.00
Drilled remaining holes in F-718 longeron
Details
07-21-2018
3.00
Drilled F-715 L/R using side skin F-770
07-20-2018
4.00
Drilled F-718 using sde skin up to F-704 bilk head
07-19-2018
3.00
Finished drilling F-721B L/R to upper longeron F-7
07-16-2018
3.00
more work on F-721 A/B
07-13-2018
3.00
F-721B L/R fitting to upper longeron
07-11-2018
5.00
Bending F-770 lower skin per drawing
Details
07-10-2018
4.00
more work on longerons bending
07-09-2018
3.00
measured and cut both L?R F-718 longerons
07-08-2018
3.00
Got side skins to match
Details
07-06-2018
4.00
trying to match holes from F-770 to F-773 skins
07-04-2018
4.00
Drilled F-623-L/R to F-776 bottom skin
07-03-2018
4.00
Clecoed aft skin & F-705 aft ribs to F-706B
07-01-2018
3.00
Still working on matching center to aft
06-30-2018
5.00
Prep for merging center section to aft section
06-29-2018
3.00
Drilled the F-715 ribs after fluting& bending to f
06-25-2018
4.00
More rivitting on the ribs to F-705
06-24-2018
6.00
More rivitting on the ribs to F-705
06-22-2018
4.00
Riveting Ribs to F-705
06-21-2018
4.00
Rivet seat Ribs to F-705 to Baggage ribs
06-18-2018
4.00
Rivet seat ribs to F-704 Aft bulkhead
06-07-2018
3.00
Fitting seat ribs and baggage floor ribs
06-06-2018
3.00
Work on setting up seat ribs and croch brackets
06-05-2018
3.00
F-704
Details
06-01-2018
3.00
F-605
Details
05-31-2018
3.00
measured ,clamped/drilled F-605 C
05-23-2018
4.00
Ordered damaged F-605 C so removed rivits etc
05-21-2018
3.00
Left side crotch strap's finnished start left side
05-18-2018
3.00
Work on left side crotch strap's
05-17-2018
3.00
Prep to rivet F-704 B to seat ribs
05-16-2018
4.00
finished dimple ribs and rest of F-776
Details
05-15-2018
4.00
Dimpled F-776 skin after deburring
05-14-2018
4.00
final drill on F-776 to seat ribs
Details
05-12-2018
3.00
Fitting bottom center skin to ribs
Details
05-11-2018
4.00
manufactured F-623A FWD and aft per DWG
Details
05-10-2018
4.00
Details
05-09-2018
5.00
manufactured F-916 C(4)
Details
05-08-2018
4.00
Nut plates
Details
05-07-2018
3.00
work on F-716B and F-716R
05-02-2018
3.00
Prep for center fuselage pg 8.5 manual
Details
05-01-2018
3.00
L-side skins to J-stiffeners riveting
04-30-2018
4.00
Right aft skin to bulk head and J-stiffeners rivet
04-29-2018
4.00
Aft skin riveting
04-28-2018
4.00
Aft skin riveting
04-27-2018
4.00
Riveting lower aft skin
04-26-2018
4.00
Lower aft skin riveting
Details
04-20-2018
5.00
Aft fuselage prep
Details
04-19-2018
5.00
F-708 bulk head
Details
04-18-2018
4.00
finished left aft side ski dimpling
04-17-2018
5.00
right aft side skin
Details
04-16-2018
5.00
Work on F-711 and F-712 bukhead
Details
04-10-2018
5.00
Aft Bulk Heads and skins
Details
04-07-2018
4.00
Aft Bulk Heads and skins
04-04-2018
5.00
Aft Bulk head
04-03-2018
5.00
Aft Bulk Heads
03-29-2018
5.00
Work on aft bulkhead, skins etc
03-22-2018
3.00
Aft Bulk hears and J stiffeners
03-20-2018
5.00
Work on rear bulkheads J stiffeners
03-19-2018
5.00
More work on aft bulkheads and F-711 and F-712
03-18-2018
5.00
work on F-711 and F-712
03-16-2018
4.00
Work on F-713 Longerons bending etc
Details
03-11-2018
5.00
Work on F-711 and F712 bulkhead
03-11-2018
4.00
work on F-711 and F-712
03-10-2018
4.00
Work on 705 Bulkhead and F711 Bulkhead
03-02-2018
4.00
Work on 705 Bulkhead
02-26-2018
4.00
Work on 705 Bulkhead ribs
02-23-2018
4.00
Work on 705 Bulkhead
02-07-2018
4.00
Work on 705 Bulkhead
02-02-2018
4.00
Work on F-705
02-01-2018
5.00
work on F705L and F-705R
01-30-2018
5.00
work on F-705 bulkhead
12-20-2017
4.00
work on F-705 Bulkhead
12-19-2017
4.00
Work on F 705 bulkhead
12-13-2017
4.00
Drilled all F-634 L/R seat belt hangers
12-06-2017
4.00
Cutting parts
Details
12-02-2017
4.00
Center section work
Details
11-26-2017
4.00
Center bulk head work
Details
11-23-2017
4.00
center bulk head work
Details
11-20-2017
4.00
Drilled 2 Bars
Details
11-15-2017
3.00
Back Riveting Aux fuel and brake plates to F-601A-
Details
11-14-2017
3.00
Fuel pump plate nut plates
Details
11-12-2017
4.00
F-601 J-L&R
Details
11-11-2017
3.00
Riveting parts to F-601A-2
Details
11-04-2017
3.00
Prime parts
Details
11-03-2017
6.00
F-601A-2
Details
11-02-2017
3.00
F-601Z
Details
11-01-2017
6.00
F-601A-2
Details
10-31-2017
2.00
F-601P
Details
10-26-2017
3.00
F-601A-2 Aux fuel doubler
Details
10-25-2017
6.00
manufacturing parts
Details
10-22-2017
4.00
Getting parts ready for the 1st part of the fusela
Details
03-22-2017
3.00
J-Stiffeners and Aft Bulk heads
07-30-2016
6.00
Work on Brakes tubing and Park brake
01-25-2016
5.00
Clecoed top skin after clamping F-695 gussets inpl
05-25-2015
6.00
Inventory of fuselage parts
SITE NAVIGATION
Contact Builder
RV7 Home
Category
# Logs
# Hours
All
793
5634
After Inspection
1
11
AIR FILTER BOX
14
116
auto pilot
2
17
Avionics
1
78
Brakes
8
32
Canopy
1
282
Cowling
22
234
Electrical
1
129
Empennage
61
490
Engine
24
176
Engine Baffles
39
240
Engine exhaust
1
5
extra parts
1
8
Firewall forward kit
5
91
Firwall forward kit
5
91
Fuselage
293
1663
Lights/strobes
8
64
Miscellaneous
1
31
Panel
8
358
PITOT/STATIC SYSTEM
5
39
Prop
5
23
SPINNER
2
32
Tanks
89
369
Tools
3
12
Wings
186
988
Wiring & connectors
7
55
RV-7 Home
Copyright © 2001-2025 Matronics. All Rights Reserved.