KitLog pro

Powered By Kitlog Pro v2.0

DANIEL'S WEB SITE
Work Logs Found: 10
Category Work Time: 35 Hours
 Date
Hours
Work Log Summary

Details

 01-13-2008
4.00
Final Installed Tail Rotor
Details
     

 11-26-2007
5.00
Tail boom and Blade box
Details

 11-09-2007
3.00
Installed tail boom items
Details

 09-21-2006
4.00
Installed tail rotor drive train
Details

 12-20-2005
0.50
Last tail rotor bolt
Details

 09-25-2005
4.00
Fabricate assemblies
Details
     

 10-09-2004
6.00
Installed tail boom
Details
       

 05-11-2004
3.00
Horizontal Tail
Details

 04-25-2004
3.00
Insp panel and boom support
Details

 04-21-2004
2.50
Inspection panels
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.