 08-29-2008
2.50
Tracking and Final Inspection
Details

 08-11-2008
2.00
Main Rotor Final Adjustments
Details
     

 08-09-2008
2.50
FInal Install of Main Rotor
Details

 07-26-2008
2.00
Drilled pitchhorn alignment bolt holes
Details

 07-25-2008
1.00
Drilled holes in pitch horn
Details

 07-21-2008
2.00
Final alignment
Details

 07-20-2008
2.00
Replaced teeter bolts
Details

 07-18-2008
2.00
Balanced Blades
Details

 06-30-2008
2.00
Balancing blades
Details

 06-29-2008
2.00
Installed Blades
Details
       

 11-16-2007
4.00
Main rotor box and support
Details

 11-02-2007
4.00
Glued Main Rotor Blades
Details
       

 12-11-2006
1.50
Tip Plug
Details
     

 12-08-2006
1.50
Tip plug
Details

 12-07-2006
2.00
Tip plug
Details

 12-06-2006
3.00
Installed the tip weights
Details

 11-30-2006
4.00
Root end of main rotors
Details
     

 11-29-2006
2.50
Fitting the retention straps
Details
     

 11-27-2006
3.00
Rotor Cradles
Details
     

 11-20-2006
4.00
Started on main rotors
Details
     

 10-09-2006
3.00
Cut out pitch horns
Details
     

 11-15-2005
3.00
Getting ready for engine installation
Details
       

 11-14-2005
4.00
Trued main rotor and added secondary shims
Details

 10-27-2005
3.00
Drilled main drive holes
Details

 04-19-2004
3.00
Fitting of Main Rotor Mast
Details

 04-02-2004
3.50
Lower mast bearing
Details

 04-01-2004
3.00
Upper Mast Bearing
Details