Exec 162
Main Rotor
Work Logs Found:
27
Category Work Time:
72 Hours
Date
Hours
Work Log Summary
Details
08-29-2008
2.50
Tracking and Final Inspection
Details
08-11-2008
2.00
Main Rotor Final Adjustments
Details
08-09-2008
2.50
FInal Install of Main Rotor
Details
07-26-2008
2.00
Drilled pitchhorn alignment bolt holes
Details
07-25-2008
1.00
Drilled holes in pitch horn
Details
07-21-2008
2.00
Final alignment
Details
07-20-2008
2.00
Replaced teeter bolts
Details
07-18-2008
2.00
Balanced Blades
Details
06-30-2008
2.00
Balancing blades
Details
06-29-2008
2.00
Installed Blades
Details
11-16-2007
4.00
Main rotor box and support
Details
11-02-2007
4.00
Glued Main Rotor Blades
Details
12-11-2006
1.50
Tip Plug
Details
12-08-2006
1.50
Tip plug
Details
12-07-2006
2.00
Tip plug
Details
12-06-2006
3.00
Installed the tip weights
Details
11-30-2006
4.00
Root end of main rotors
Details
11-29-2006
2.50
Fitting the retention straps
Details
11-27-2006
3.00
Rotor Cradles
Details
11-20-2006
4.00
Started on main rotors
Details
10-09-2006
3.00
Cut out pitch horns
Details
11-15-2005
3.00
Getting ready for engine installation
Details
11-14-2005
4.00
Trued main rotor and added secondary shims
Details
10-27-2005
3.00
Drilled main drive holes
Details
04-19-2004
3.00
Fitting of Main Rotor Mast
Details
04-02-2004
3.50
Lower mast bearing
Details
04-01-2004
3.00
Upper Mast Bearing
Details
SITE NAVIGATION
Contact Builder
Exec 162 Home
Category
# Logs
# Hours
All
319
1114
Airframe and Landing Gear
5
29
Avionics
5
12
Clutch assembly
1
2
Control Systems
27
78
Cooling System
8
20
Electronics
28
78
Empennage
12
44
Engine
8
22
Fuel System
12
33
Fuselage
69
236
Hardware
4
10
Heat Shielding
6
22
Instruments
16
38
Interior
22
57
lower engine mount
1
8
Main Rotor
27
72
Miscellaneous
15
46
None
4
1
Painting
17
171
Power train
10
24
Systems
4
12
Tail Boom
10
35
Tools
3
12
Workshop and Inventory
5
52
Copyright © 2001-2024 Matronics. All Rights Reserved.