KitLog pro

Powered By Kitlog Pro v2.0

Randy's 750 Cruzer Project
Work Logs Found: 10
Category Work Time: 25 Hours
 Date
Hours
Work Log Summary

Details

 11-16-2024
3.00
Installed vertical stab attachment brackets
Details
       

 10-23-2024
2.00
Installed elevator counter balance weights
       

 10-09-2024
2.50
Trimmed vertical stab to fit on horizontal stab
       

 10-06-2024
2.50
Riveted mounting plates & mounted horizontal stab
       

 10-05-2024
1.00
Installed upper elevator control cable guide
Details
       

 10-02-2024
4.00
Installed elevator control cable pulleys
       

 09-22-2024
1.00
Installed vertical stab mounting brackets
       

 09-22-2024
1.50
Installed nut plates on rear access covers
       

 09-14-2024
4.00
Drilled mounting holes for horizontal stab
Details
       

 09-10-2024
3.50
Fitted & positioned horizontal stab
Details
     










Copyright © 2001-2025 Matronics. All Rights Reserved.