Powered By Kitlog Pro v2.0
Randy's 750 Cruzer Project
CH750 Cruzer
Empennage
Work Logs Found:
10
Category Work Time:
25 Hours
Date
Hours
Work Log Summary
Details
11-16-2024
3.00
Installed vertical stab attachment brackets
Details
10-23-2024
2.00
Installed elevator counter balance weights
10-09-2024
2.50
Trimmed vertical stab to fit on horizontal stab
10-06-2024
2.50
Riveted mounting plates & mounted horizontal stab
10-05-2024
1.00
Installed upper elevator control cable guide
Details
10-02-2024
4.00
Installed elevator control cable pulleys
09-22-2024
1.00
Installed vertical stab mounting brackets
09-22-2024
1.50
Installed nut plates on rear access covers
09-14-2024
4.00
Drilled mounting holes for horizontal stab
Details
09-10-2024
3.50
Fitted & positioned horizontal stab
Details
SITE NAVIGATION
Contact Builder
CH750 Cruzer Home
Category
# Logs
# Hours
All
342
914
Brakes
4
13
Center Console
2
9
Controls
27
52
Elevator
18
44
Empennage
10
25
Engine
8
24
Firewall
10
22
Fuel System
19
55
Fuselage
99
248
Horizontal Stablizer
24
63
Landing Gear
8
16
Miscellaneous
2
7
None
4
5
Prop
1
2
Rudder
2
8
Seats
6
10
Vertical Stabilizer
7
14
Wings
91
297
Copyright © 2001-2025 Matronics. All Rights Reserved.