KitLog pro

Powered By Kitlog Pro v2.0

Brad's CH 601XLB
Work Logs Found: 19
Category Work Time: 31 Hours
 Date
Hours
Work Log Summary

Details

 05-13-2024
2.00
Fix Low Battery Indicator Circuit Board
Details

 05-09-2024
3.00
Repair Low Battery Indicator
Details

 05-08-2024
2.00
Install Fuel Pressure Gauge
Details
       

 05-01-2024
2.00
Work on wiring
Details

 04-30-2024
3.00
Work on wiring. Move or remove some gauges.
Details

 04-17-2024
2.00
Remount Low Battery indicator to fix it.
Details
       

 04-16-2024
1.00
Test fit Instrument Panel cover
Details

 04-15-2024
2.00
Install potentiometer and LED control for panel
Details
       

 04-09-2024
5.00
Install potentiometer and LED control for panel
Details

 04-06-2024
1.00
Install potentiometer for panel lighting
Details

 04-04-2024
2.00
Install potentiometer for panel lighting
Details

 04-03-2024
2.00
Test fit Instrument Panel cover
Details

 03-04-2024
2.00
Work on instrument wiring
Details

 08-02-2023
2.00
Install flexible grommets
Details

 08-24-2009
0.00
Panel
     

 06-21-2009
0.00
BNC Cable
       

 11-18-2008
0.00
Panel
       

 09-10-2008
0.00
Instrument panel
       

 09-07-2008
0.00
Instrument panel
       










Copyright © 2001-2024 Matronics. All Rights Reserved.