KitLog pro

Powered By Kitlog Pro v2.0

GOTTFRIED'S WEB SITE
Work Logs Found: 63
Category Work Time: 217 Hours
 Date
Hours
Work Log Summary

Details

 03-31-2021
1.00
blade hanger refinement
Details
     

 03-10-2021
2.00
adjusting tail rotor angles
Details
       

 03-04-2021
2.00
adjustingi swash plate angles
Details
       

 02-25-2021
2.00
Rotor blade balancing
Details
       

 02-24-2021
2.00
tail rotor slider modification
Details
     

 02-22-2021
2.00
painting blade support rig
Details
       

 02-11-2021
2.00
Rotor blade installation and blade hangers
Details
       

 02-02-2021
2.00
Blade hanger fabrication
Details
     

 01-29-2021
4.00
Blade hanger fabrication
Details
       

 01-28-2021
3.00
Blade holders
Details
       

 01-26-2021
2.00
rotor hub installation
Details
       

 01-25-2021
2.00
Rotor hub assembly
Details
     

 11-30-2020
2.00
Rotor head painting
Details
       

 05-01-2020
1.00
rotor shaft plug installation
Details
       

 04-24-2020
3.00
Fitting of the retension bolts for the blade gripp
Details
       

 04-20-2020
3.00
retension bolt fitting
Details
     

 01-05-2020
2.00
Final installation of tail rotor drive shaft
Details
       

 01-23-2019
6.00
transmission and controls all aligned and adjusted
Details
       

 01-22-2019
6.00
swash plate installation
Details
     

 01-20-2019
2.00
Tail rotor drive shaft alignmeng
Details
     

 01-19-2019
3.00
Tail rotor drive shaft assembling
Details
       

 01-17-2019
5.00
Tail rotor shaft drilling and asembling
Details
       

 01-16-2019
3.00
Rotor shaft bearing alignment
Details
       

 01-13-2019
3.00
Painting transmission and swash plate
Details
       

 01-09-2019
4.00
preparing transmission for painting
Details
     

 01-05-2019
3.00
TR drive shaft installation
Details
     

 01-04-2019
4.00
TR transmission alignment
Details
       

 12-26-2018
6.00
planning installation of TR drive shaft
Details
       

 12-24-2018
4.00
Fitting the main transmission
Details
       

 12-22-2018
4.00
Installation of rotor shaft head bearing
Details
       

 12-10-2018
8.00
Rotor blade finishing
Details

 12-06-2018
10.00
sanding and buffing blades
Details
     

 12-01-2018
7.00
sanding and polishing rotor blades
Details
       

 11-26-2018
7.00
sanding of rotor blades
Details
     

 11-24-2018
6.00
polishing rotor blades
Details
       

 11-10-2018
6.00
finishing rotor blade drag link brakets installati
Details
       

 11-04-2018
5.00
drilling rotor tip holes for later balancing
Details
       

 04-24-2018
5.00
building box for rotor blades
Details
       

 04-22-2018
5.00
building a box for otor lades
Details
       

 04-20-2018
3.00
installn rag lnk brackets
Details
       

 04-17-2018
4.00
drilling drag link brackets
Details
       

 04-15-2018
3.00
drilling drag link brackets
Details
       

 04-13-2018
1.00
filling the tail rotor gear box
Details
       

 04-08-2018
3.00
drag links
Details
       

 04-03-2018
3.00
endplugs
Details
       

 03-31-2018
3.00
end plugs
Details
       

 03-30-2018
2.00
end plug installation
Details
       

 03-29-2018
3.00
plugs for rotor tips
Details
       

 03-26-2018
2.00
end plugs for rotor blades
Details
       

 04-17-2017
3.00
TR mounting
Details
       

 04-15-2017
3.00
assembling TR
Details
       

 04-14-2017
2.00
TR scissors fabrication
Details
       

 04-12-2017
2.00
Making TR scissors
Details
       

 04-07-2017
3.00
Fitting TR to shaft
Details
       

 04-06-2017
2.00
fitting tail rotor
Details
       

 09-06-2016
3.00
Rotor tip weights
Details
       

 09-05-2016
3.00
Rotor tip weights
Details
       

 08-24-2016
4.00
Bonding last set of doublers
Details
       

 08-18-2016
3.00
Bonding doublers on 2nd blade
Details
     

 08-15-2016
3.00
bonded top side doublers
Details
       

 08-12-2016
3.00
bonding doublers
Details
     

 08-11-2016
4.00
preparing for doubler bonding
Details
       

 07-07-2016
3.00
familiarization with rotor blade construction
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.