KitLog pro

Powered By Kitlog Pro v2.0

GOTTFRIED'S WEB SITE
Work Logs Found: 25
Category Work Time: 85 Hours
 Date
Hours
Work Log Summary

Details

 03-22-2021
3.00
horizontal tail fin
Details
       

 01-27-2021
2.00
Collective permanent installation
Details
       

 04-28-2020
3.00
control cable attachments
Details
     

 04-26-2020
3.00
control cable clamps
Details
       

 12-22-2019
1.00
Safety wiring tail rotor controls
Details
       

 12-20-2019
6.00
Final assembly
Details

 12-19-2019
4.00
Final assembly
Details

 12-12-2019
2.00
preping cyclic/collective control for final instal
Details
       

 12-11-2019
3.00
preping control rods
Details
       

 02-09-2019
3.00
installation of slider bracket
Details
       

 02-08-2019
5.00
Installation of slider
Details
       

 02-06-2019
2.00
Corrosion on cyclic beam2
Details
       

 06-23-2016
5.00
control rod finishing
Details
       

 04-13-2016
2.00
collective friction device
Details
     

 04-11-2016
3.00
cleaning and zinc chromating controls
Details
       

 01-13-2016
3.00
push pull control tubes
Details
       

 01-07-2016
6.00
push pull rod assembly
Details
       

 01-04-2016
5.00
floor pan cut out for directional control & Collec
Details
       

 01-03-2016
5.00
mixer
Details
       

 01-02-2016
6.00
cyclic control assembling
Details
       

 12-30-2015
2.00
Collective installation
Details
       

 12-29-2015
3.00
collective and throttle assembly
Details
       

 12-22-2015
2.00
collective controls parts machining
Details
       

 12-16-2015
4.00
fitting and assembling of directional controls
Details
       

 12-13-2015
2.00
fitting controls of directional controls
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.