Powered By Kitlog Pro v2.0
MARK'S WEB SITE
RV14A
Empennage
Work Logs Found:
50
Category Work Time:
178 Hours
Date
Hours
Work Log Summary
Details
10-14-2018
3.50
Riveting, dimpling floor and tunnel walls
Details
07-11-2016
5.00
Fiberglass
Details
07-04-2016
4.00
fitting rudders
Details
07-02-2016
2.50
right rudder tip
Details
06-28-2016
2.50
left rudder tip
Details
06-26-2016
2.50
top rudder fairing
Details
06-21-2016
2.50
rudder fairing tips
Details
05-27-2016
2.50
rivet deck
Details
05-24-2016
4.00
tie wrap, prime,match drill
Details
05-22-2016
3.00
ran and tie wraped cables
Details
05-21-2016
3.00
Running cables
Details
05-20-2016
2.00
Nut plates
Details
11-08-2015
3.00
Riveting and Dimpling
Details
11-05-2015
4.50
riveting and priming bulkheads
Details
11-03-2015
3.00
riveting and priming bulkheads
Details
10-30-2015
1.00
riveting bulkheads
10-27-2015
1.00
Priming bulkheads and tie down bracket
Details
10-24-2015
4.00
cutting and priming
Details
10-12-2015
6.00
riveted trailing edge, formed lead edge
Details
10-11-2015
2.00
seal elevator
Details
10-07-2015
2.00
trim tab servo
Details
09-26-2015
6.00
rivet elevator skins
Details
09-20-2015
3.00
Elevator ribs
Details
09-18-2015
2.00
Rivet elevator skins
Details
09-12-2015
2.00
Repaired spar
Details
08-31-2015
2.00
final rivet of trim tab
Details
08-30-2015
1.00
riveting of spare to ribs
Details
08-29-2015
4.00
start of assembly of elevators, trim tab
Details
08-28-2015
4.00
priming
Details
08-22-2015
8.00
evevators and trim tab
Details
07-25-2015
6.00
elevator, trib tab and tips
Details
07-07-2015
6.00
begining of riviting of horizontal stabilizer
Details
06-27-2015
4.00
Begining construction of horizontal stabilizer
Details
06-21-2015
5.00
Preparing horizontal stabilizer ribs
Details
06-19-2015
3.00
Dimpling skins
Details
06-12-2015
5.00
Horizontal stabilizer front spar
Details
06-06-2015
5.00
Begining Horizontal Stablilzer
Details
05-31-2015
3.00
Final assembly of rudder
Details
05-17-2015
4.00
Rudder assembly
Details
05-09-2015
2.00
dimppling and priming rudder
Details
04-25-2015
5.00
Final drilling and fitting rudder
Details
03-30-2015
1.00
Riveted rear spar to vertical stabilizer
Details
03-29-2015
4.00
Finsihing up vertical stabilizer
Details
03-22-2015
6.00
Riveting vertical stabilizer
Details
03-14-2015
2.00
more cutting and deburring
Details
03-08-2015
7.00
deburring and cuting apart parts
Details
02-28-2015
6.00
C Frame table, debur, dimple
Details
02-21-2015
4.00
Cleco Veritcal Stabilizer
Details
02-16-2015
1.00
Continue on Vertical stabilizer
Details
02-15-2015
3.00
Start of kit
Details
SITE NAVIGATION
Contact Builder
RV14A Home
Category
# Logs
# Hours
All
198
739
Empennage
50
178
Fuselage
37
140
Wings
111
421
Copyright © 2001-2024 Matronics. All Rights Reserved.