Powered By Kitlog Pro v2.0
CHUCK'S WEB SITE
Sonex-B Tri-Gear
Cowling
Work Logs Found:
66
Category Work Time:
140 Hours
Date
Hours
Work Log Summary
Details
04-09-2024
1.90
Cutting Oil Cooler Air Inlet / Shorten & Install H
Details
04-07-2024
3.60
New Deflection Lips Fabricated And Installed
Details
04-06-2024
2.10
Fabricating New Exhaust Tunnel Deflection Lips
Details
04-06-2024
3.10
Completed Both Tunnel Installations.
Details
04-05-2024
1.50
Cutting And Mounting Passenger Exhaust Tunnel
Details
04-05-2024
1.10
Completing Nose Gear Coverplate Assy Install
Details
04-04-2024
2.00
Fitting Nose The Gear Coverplate Assembly
Details
04-04-2024
1.90
Fabricating Nose Gear Coverplate Assembly
Details
04-03-2024
2.25
Final Trim And Fit Of Cowling Nosewheel Strut Slot
Details
03-25-2024
2.50
Sonex Tech Support Submission
Details
03-24-2024
0.50
Bending The Exhaust Tunnel Low Pressure Lips
Details
03-24-2024
2.60
Bending Exhaust Tunnel Forms
Details
02-04-2024
2.10
Trim Oil Cooler Air Intake Baffle For Baffle-Seal
Details
01-27-2024
1.20
Sanding The Exterior Fiberglass Tape Reinforcement
Details
01-27-2024
1.00
Installing Full Cowling With New Blister Channel
Details
01-26-2024
1.30
Fiberglass Reinforcement On Exterior Blister Joint
Details
01-22-2024
0.80
Sanding Down The Excess Exterior Adheasive
Details
01-21-2024
2.60
Blister Interior Fiberglass Reinforcement - Part 2
Details
01-21-2024
2.80
Blister Interior Fiberglass Reinforcement - Part 1
Details
01-20-2024
0.70
Adhearing The New Blister Channel To Cowling
Details
01-19-2024
1.90
Prepping For Mounting The New Blister Channel
Details
01-13-2024
4.20
Fiberglassing The Cowling Side Vents Into Place
Details
01-12-2024
1.30
Dressing The Cowling Side Vent Openings
Details
01-02-2024
1.00
Installing Cowling Side Vents
Details
01-01-2024
2.40
Updrill, Prep And Rivet Cowling Attachment Hinges
Details
01-01-2024
1.10
Layout And Attach Cowling Side Vent Templates
Details
12-17-2023
6.00
Prototyping A Shim To Align Rivnuts With Bolts
Details
12-16-2023
2.20
Securing Upper Cowling To The Lower Cowling
Details
12-16-2023
3.20
Fitting Top Cowling Piece
Details
12-15-2023
3.60
Continued Fitting Of The Upper Cowling Piece
Details
12-14-2023
3.10
Initial Fitting Of The Upper Cowling Piece
Details
12-13-2023
3.10
Completed Lower Cowl Fitting And Clecoed Hinges
Details
12-12-2023
1.70
Filling Bad Holes And Fitting Hinge to Pilot Side
Details
12-10-2023
2.90
Trimming Engine Cooling Fins For Clearance
Details
12-10-2023
2.10
Continued Fitting Of Cowling To Firewall/Engine
Details
12-09-2023
4.50
Initial Fitting Of Cowling To Firewall/Engine
Details
12-09-2023
0.80
Fitting New Blister Channel To Cowling
Details
12-09-2023
2.20
Fitting New Blister Channel To Cowling
Details
12-05-2023
1.70
Trimming And Dressing Blister Underneath Edge
Details
12-04-2023
0.40
Pulling The New Blister Channel From The Mold
Details
12-03-2023
3.80
Laying Up The Blister Channel In The Mold
11-19-2023
2.90
Wetsanding And Polishing The Mold Surface
Details
11-15-2023
0.90
Removing The Blister Channel Mold From The Plug
11-13-2023
3.60
Laying Up The Tooling Gelcoat Mold On The Plug
Details
11-11-2023
1.70
Applying The Flange To The Mold Plug
Details
11-10-2023
0.40
Final Waxing And Plug Surface Inspection
Details
11-07-2023
2.60
Plug Surface Polishing And Waxing
Details
11-05-2023
1.80
Sanded Primed Plug Surface
Details
11-03-2023
2.50
Spraying Duratec Surface Primer To The Plug
Details
10-26-2023
0.50
Dressed Mold Plug With Plastic Skirting
Details
10-18-2023
1.80
Surface Prep Of New Blister Channel Mold Plug
Details
10-15-2023
1.10
3D Printing The Segemnted Blister Mold Plug
Details
10-09-2023
3.20
Print Test Of The New Blister Surface Shape
Details
10-05-2023
2.90
Produce Small Scale Prototype Of Blister Plug
Details
10-03-2023
3.80
Creating Digital Mesh Of New Blister Channel
Details
09-24-2023
1.10
Producing #d Model Of Lower Cowling
Details
09-08-2023
1.20
Oil Pump Housing Cover Contact Point
Details
09-07-2023
0.70
Cleaned And Dressed The Trimmed Cooling Fins
Details
09-06-2023
1.60
Trimming Lower Engine Block Cooling Fins
Details
09-06-2023
1.20
Fiberglass Blister Testing
Details
09-05-2023
2.40
Cowling Mods To Eliminate Contact Points
Details
09-03-2023
5.80
Fitting The Lower Cowling Piece
Details
09-02-2023
2.60
Cut Nosewheel Strut Slot & Trim Prop Hub Opening
Details
08-29-2023
1.00
Cowl Prep - Clearing The Openings - Part 2
Details
08-26-2023
0.90
Cowl Prep - Clearing The Openings - Part 1
Details
08-20-2023
0.80
Designed CNC Toolpaths for Prop Hub Spacer
Details
SITE NAVIGATION
Contact Builder
Sonex-B Tri-Gear Home
Category
# Logs
# Hours
All
463
1153
Avionics
53
142
Controls
20
62
Cowling
66
140
Documentation
69
81
Electrical System
4
17
Empennage
56
163
Engine
43
98
Fuel System
8
17
Fuselage
79
232
Landing Gear
28
97
Miscellaneous
8
12
Plans Review
7
14
Tools
3
10
Wings
19
68
Copyright © 2001-2024 Matronics. All Rights Reserved.