KitLog pro

Powered By Kitlog Pro v2.0

Edwards Web Site
Work Logs Found: 35
Category Work Time: 304 Hours
 Date
Hours
Work Log Summary

Details

 03-24-2025
10.00
Installed oil cooler, scat tubing, spark plug wire
Details
       

 03-15-2025
4.00
Installed the propellor
Details
       

 03-10-2025
6.00
More firewall forward wiring
Details
       

 03-08-2025
12.00
Continued wiring of engine sensors and controls
Details
       

 03-05-2025
6.00
Added thermocouple extension wire to probes
Details
       

 03-01-2025
7.00
Added CHT/EGT probes and heat muffs
Details
       

 02-28-2025
8.00
Added exhaust system to the engine
Details
       

 02-06-2025
8.00
Added FlyLEDs and attached wingtips
Details
       

 01-25-2025
7.00
Installed Flaps and Ailerons linkages
Details
       

 01-04-2025
4.00
Finished fuel lines between wings and fuselage
Details
       

 12-16-2024
3.00
Started fuel line connection between wings and fus
Details
       

 12-06-2024
8.00
Made the wire/ pitot tube connections at wing root
Details
       

 11-27-2024
6.00
Attached the wings to the fuselage
Details
       

 11-26-2024
6.00
Finished up wiring connectors at the wing roots
Details
       

 11-13-2024
5.00
Fianl assembly of Horizontal/Vertical Stabilizers
Details
       

 11-11-2024
4.00
Started assembly of some of the painted parts
Details
       

 11-07-2024
4.00
Painting - Lower Cowling and misc parts
Details
       

 11-06-2024
4.00
Painting - Upper Cowling, Canopy
Details
       

 11-05-2024
8.00
Painting - Priming cowling, canopy and other small
Details
       

 11-01-2024
3.00
Painting- Fuselage and Wings after removing maskin
Details
       

 10-31-2024
3.50
Painting - Fuselage,bottom side Green paint
Details
       

 10-26-2024
10.00
Painting - Fuselage, Prep for Green lower side
Details
       

 10-24-2024
8.00
Painting - Fuselage, Prep. for White top side
Details
       

 10-19-2024
3.00
Painting - Fuselage priming
Details
       

 10-18-2024
8.00
Painting - Fuselage prep
Details
       

 10-11-2024
10.00
Painting continued
Details
 

 10-03-2024
20.00
Painting Continued
Details
       

 09-25-2024
40.00
Painting
Details
       

 07-01-2024
45.00
First attempt at painting
Details

 06-21-2024
0.00
Completion of paint booth
Details
       

 02-17-2024
6.00
Moved fuselage to the hangar
Details
       

 07-03-2023
4.00
Deburred and primed/painted several misc. parts.
Details
       

 07-02-2023
5.00
Fitted the wingtip lenses
Details
       

 06-24-2023
10.00
Finished assembly and mounting of FLYLED wingtip l
Details
       

 06-16-2023
8.00
Prepared to move wings and hor stab to hangar spac
Details
       










Copyright © 2001-2025 Matronics. All Rights Reserved.