KitLog pro

Powered By Kitlog Pro v2.0

Adams RV-7A Build
Work Logs Found: 53
Category Work Time: 353 Hours
 Date
Hours
Work Log Summary

Details

 09-02-2024
6.25
AlCantara Glareshield
Details
       

 06-24-2024
6.50
Fuel Tank and Behind Firewall prep
Details
       

 05-30-2024
5.50
Fairing Cowling and FLG fiberglass
Details
       

 05-14-2024
5.25
Oil Door and Front sytrut cuff
Details
       

 05-13-2024
3.00

Details
       

 05-09-2024
6.00
Riveting Cowl, Fitting wheel pants and cuff
Details
       

 05-07-2024
6.25
Front Wheel Pants, Rivet Firewall
Details
       

 05-01-2024
3.00
Cowl and Front Landing Gear
Details
       

 04-30-2024
7.00
Cowling installation
Details
       

 04-25-2024
6.50
Attaching Cowling
Details
       

 04-24-2024
5.50
Attaching Cowling
Details
       

 04-23-2024
7.00
Fitting Cowling, installing fastener tabs
Details
     

 04-22-2024
8.00
Installing Cowling
Details
       

 04-17-2024
7.25
Fitting Cowling
Details
       

 04-16-2024
7.00
Start Cowl Instalation
Details
     

 03-28-2024
6.50
Wiring Tail, Front Wheel Pants
Details

 03-26-2024
7.00
Rivet Fwd Fuselage
Details
       

 03-19-2024
7.00
Pain rivet rack supports, mount engine mount to fu
Details
       

 03-18-2024
7.00
Tank Mounts, Ground Blocks, Front Gear
Details
       

 03-14-2024
7.50
Flap Torque Tube
Details

 03-13-2024
7.50
Steps, Baggage floor
Details
       

 02-01-2024
7.50
Assembling wings to Fuselage
Details
     

 01-31-2024
7.25
Control Sticks, Roll Bar
Details
       

 01-30-2024
7.00
Brake Vent and Fuel Lines
Details
       

 01-29-2024
7.00
Rudder Pedals, Brakes, Unpack Panel
Details
       

 01-16-2024
7.25
Brake, Fuel and Vent lines
Details
       

 01-12-2024
7.00
Interior, Inspection Covers
Details
       

 01-11-2024
7.00
Interior, Pain Prep
Details
     

 01-10-2024
7.50
CAnopy, Skirts, Paint prep
Details
       

 01-08-2024
7.00
Riveting Turtle Deck
Details

 01-05-2024
7.00
Cutting Canopy
Details
       

 01-04-2024
7.00
Canopy Installation
Details
       

 01-03-2024
5.00
Fittin Canopy
Details
       

 01-02-2024
7.50
Canopy Frame installation
Details
       

 12-21-2023
6.50
Riveting Turtle Deck
Details
       

 11-28-2023
6.00
Riveting Turtle Deck
Details
       

 11-27-2023
7.00
Landing gear mounts
Details
       

 10-26-2023
7.00
Wheel Pants, Prep for paint
Details

 10-25-2023
7.00
Wheel Pants and Disassembly of fuselage
Details
       

 10-09-2023
7.00
Flap Position Sensor install, Wheel Pants
Details
       

 08-23-2023
7.50
Brake Lines
Details
     

 08-16-2023
7.50
Landing gear and panel design
Details
     

 08-03-2023
7.25
ELT and Stobe mounts, ADAHRS Mount, Tie Down
Details
       

 08-02-2023
7.25
Fairings, Seat Belt Mounts, ELT Mounts
Details
       

 08-01-2023
6.00
Fuselage steps, fiberglass continued...
Details
       

 07-31-2023
7.00
Landing gear mount and LS wing step
Details
       

 06-20-2023
7.00
Inspection Holes
Details

 06-19-2023
6.00
Wingtip LED Light Cut Landing Gear Holes
Details

 06-15-2023
6.00
Misc, Fuel Tank, wiring
Details

 06-13-2023
6.50
Roll Trim, Inspection holes
Details
       

 05-30-2023
8.00
Front Deck Holes and Dimpling
Details

 05-29-2023
7.25
Pushrods
Details
       

 05-23-2023
6.00
Firewall Prep
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.