Powered By Kitlog Pro v2.0
MARK'S WEB SITE
RV-7A
Fuselage
Work Logs Found:
120
Category Work Time:
330 Hours
Date
Hours
Work Log Summary
Details
01-14-2023
3.00
Canopy Frame Fitting
Details
01-12-2023
1.00
Fit Canopy Brace
Details
01-11-2023
1.50
Canopy Slider Block Drill/Trim
Details
07-14-2016
4.40
Complete Rear Slider Track Assembly
Details
10-01-2015
4.50
Riveting Sub-Panel Structure to Fuselage
Details
09-30-2015
7.00
Assemble Forward Fuselage Sub-Panel Structure
Details
09-18-2015
2.50
Fabricate ELT Antenna Doubler Plate
Details
09-17-2015
2.50
ELT Mount and run Static Line
Details
02-02-2015
2.00
Static Line Installation to Instrument Panel
Details
12-12-2014
1.80
Rudder Cable Link Fabrication and Installation
Details
12-12-2014
2.10
Installing Rudder Pedal Assembly
Details
12-12-2014
2.00
Brake LIne Installation to Brake Pedals
Details
12-10-2014
2.50
Garmin Pitch Servo Installation
Details
12-08-2014
3.00
Rudder Cable Egress Fairings
Details
12-08-2014
1.00
GMU 22 Magnetometer Mounting Plate
Details
12-07-2014
2.50
Static Line Installation
Details
12-06-2014
1.00
Rivet Servo Bracket
Details
12-06-2014
1.50
Ray Allen Trim Pitch Servo
Details
12-06-2014
2.00
Fabricate Static Line Clamps
Details
12-02-2014
1.20
Static Port Installation
Details
12-02-2014
4.20
Pitch Servo Bracket Installation
Details
12-01-2014
2.50
Magnetometer Cable Installation
Details
11-01-2014
2.50
Rivet Antenna Reinforcing Plates
Details
10-26-2014
1.50
Install Battery Box and Contactor Bus Bar
Details
10-26-2014
2.00
Fabricate ADS-B Antenna Reinforcing Plate
Details
10-25-2014
4.00
Install Battery and Starter Contactors
Details
10-20-2014
2.50
Mount Battery Box to Firewall
Details
10-20-2014
1.50
Firewall Platenuts
Details
10-20-2014
1.00
Battery Contactor Mockup
Details
10-19-2014
2.50
CI-105 Transponder Antenna Plate
Details
10-19-2014
2.50
Battery Box Riveting
Details
10-18-2014
1.00
Installation of TG-10 Heater Vent
Details
10-18-2014
3.00
Battery Box Fabrication
Details
10-13-2014
4.00
Fabricate Battery Box
Details
10-13-2014
1.00
Dimpled Belly Skin for VHF Antenna
Details
10-06-2014
1.00
Static Ports
Details
10-05-2014
0.50
Rivet Rudder Pedal Brace
Details
10-05-2014
2.00
Naca Vent Installation
Details
10-04-2014
3.50
Rivet Firewall Recess
Details
10-04-2014
1.00
Install Fuel Vent Line Fittings
Details
10-04-2014
0.50
Drilled Firewall Nose Gear Access Hole
Details
10-02-2014
0.50
Transducer Manifold Installation
Details
10-02-2014
3.00
Fuel Pump to Firewall Fuel Line
Details
10-02-2014
0.50
Dimple Firewall Rivet Holes
Details
10-01-2014
2.50
Fabricate and Install Fuel Line Doubler
Details
10-01-2014
2.00
Elevator Horn Inspection Covers
Details
09-27-2014
1.50
Sub-Panel Bend Line and Priming
Details
09-27-2014
2.00
Elevator Horn Inspection Cover Installation
Details
09-24-2014
3.00
Install Heater Bypass Valve
Details
09-23-2014
2.00
GMU 22 Magnetometer Mounting Plate
Details
09-22-2014
3.00
Rivet Instrument Panel Angles to Canopy Deck
Details
09-22-2014
1.00
Drill for Nutplates
Details
09-21-2014
2.00
Dimpled Top Forward Skin
Details
09-14-2014
7.00
Fit Forward Fusalage Ribs and Top Skin
Details
09-13-2014
5.00
Center Forward Fusalage Rib
Details
09-12-2014
1.50
Elevator Pushrods Primed
Details
09-07-2014
6.00
Assemble Elevator Push Rods
Details
09-05-2014
3.00
Fabricate Instrument Sub-Panel Brackets
Details
08-27-2014
4.00
Fabricate fusalage Brake Lines
Details
08-20-2014
6.10
Install Fuel Lines From Selector to Wings
Details
08-19-2014
1.50
Brake LIne Fittings
Details
06-30-2014
6.00
Rivet Aft Bulkheads and Tie Down Bar.
Details
01-05-2014
1.50
Install Fuel Tank Attach Hardware to Fusalage
Details
10-17-2013
1.75
Riveted Brake Hose Bracket to Firewall
Details
10-11-2013
1.50
Enlarge Fuel Line Through Fusalage to 1"
Details
09-29-2013
3.50
Fabricate Left Fuel Vent Line
Details
09-28-2013
4.50
Fabricate Fusalage Fuel Vent Lines
Details
09-27-2013
3.50
Fabricate Fuel Line on Pump Assembly
Details
09-25-2013
1.50
Mount high pressure fuel pump.
Details
09-12-2012
2.20
Fabricate Left and Right Fuel Tank Support Angle
Details
09-08-2012
4.00
Fit Brake Master Cylinder
Details
09-06-2012
5.00
Assemble Brake Pedal Brackets
Details
09-05-2012
2.50
Fit Control Column and Control Stick Bases
Details
09-02-2012
3.00
Backrest Brace and Flap Actuator Covers
Details
08-25-2012
1.20
Drill and Rivet the Seat Adjustment Supports
Details
08-25-2012
1.20
Continue work on flap channel
Details
08-22-2012
1.80
Finish Flap Actuator Channel
Details
08-20-2012
3.60
Crotch Strap Bracket Installation
Details
08-19-2012
4.00
Crotch Strap Attach Bracket Installation
Details
08-18-2012
1.50
Make Flap Motor Attach Angle
Details
08-16-2012
0.40
Make Flap Actuator Plate
Details
08-15-2012
1.20
Fit and Drill the Flap Actuator Bearing Blocks
Details
08-15-2012
2.50
Electric Flap Motor Installation
Details
06-26-2012
2.00
Rivet Both Seat Back Assemblies
Details
06-25-2012
2.00
Right Seat Back Primed and Painted
Details
06-16-2012
3.00
Prime and Paint Seat Left Seat Back
Details
06-16-2012
4.80
Fuel Valve Cover and Fuel Pump Mount
Details
06-14-2012
3.20
Modify Center Floor for Fuel Pump Assembly
Details
06-13-2012
5.10
Optional High Pressure Fuel Pump Fit
Details
05-29-2012
2.10
Insert Center Cabin Floor and Heat Baffle to Fusal
Details
05-28-2012
3.40
Fit Heat Baffle to Center Cabin Floor
Details
05-27-2012
7.00
Fabricate Seat Back Braces
Details
05-26-2012
1.00
Temporarily Installed Forward Seat Floors
Details
05-26-2012
7.00
Build Both Seat Backs
Details
05-25-2012
2.30
Install Platenuts for Stick Cutout Rings
Details
05-24-2012
4.00
Made F-741A-L&R Tunnel Support Cover
Details
05-22-2012
0.50
Fit F-748 Baggage Tunnel Cover
Details
05-20-2012
3.80
Install Aft Seat Floor Assemblies
Details
05-16-2012
3.60
Finish F-747-L&R Baggage Floors
Details
05-15-2012
2.20
Rivet Aft Baggage Side Covers
Details
05-06-2012
2.60
Prepare Forward Baggage Side Covers
Details
12-14-2011
2.60
Riveting of External Step to Fusalage
Details
11-25-2011
3.20
Trim and Fit F-6111 Ribs
Details
11-12-2011
2.10
Fit, Prime and Paint Baggage Side Covers
Details
11-06-2011
4.00
Landing Gear Weldment Installation
Details
10-31-2011
3.50
Priming Fusalage Floor
Details
10-23-2011
3.20
Fitting F-7112 Forward Top Skin
Details
10-16-2011
6.10
Installing Landing Gear Mounts
Details
10-15-2011
2.40
External Step UHMW Block Installation
Details
10-10-2011
6.30
Installing WD-657 External Step
Details
10-10-2011
3.50
Fabricate F-635 Bellcrank
Details
09-21-2011
3.20
Mid Fusalage Side Rails and Canopy Deck Riveting
Details
09-18-2011
1.20
Verfying Quick Build Steps
Details
09-17-2011
2.80
Rudder Pedal Brace Fabrication
Details
09-16-2011
3.40
Drill Rudder Pedal Tubes to Longerons
Details
09-12-2011
3.20
Brake Pedal Fabrication
Details
09-11-2011
4.10
Verifying QuickBuild Steps
Details
09-10-2011
1.50
Verifying Quick Build steps
Details
09-09-2011
2.10
Seat Adjustment Supports
Details
09-08-2011
4.00
Start of Quick Build Fusalage
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
255
769
Avionics
14
52
Electrical System
1
3
Empennage
60
167
Engine
6
26
Fuselage
120
330
Ignition System
1
6
Shop Supplies
2
4
Wings
51
181
Copyright © 2001-2024 Matronics. All Rights Reserved.