Powered By Kitlog Pro v2.0
Zenith 601 HDS N219BD
CH-601 HDS
Fuel system
Work Logs Found:
13
Category Work Time:
56 Hours
Date
Hours
Work Log Summary
Details
08-26-2023
2.00
Installed Left Fuel sender
Details
08-05-2023
2.00
Fabricated two 3/8" hard fuel lines
Details
08-03-2023
0.50
Installed -6 braded fuel line to wing tank
Details
07-31-2023
3.00
Prepared Left 10 gal Wing Tank for installation
Details
07-26-2023
1.00
Removed existing Left WIng Locker tank
Details
07-03-2023
4.00
Installed fuel sender
06-29-2023
1.00
Corked 10 gal fuel tanks
Details
06-28-2023
26.00
Installed new 10 gal wing tanks & removed wing loc
Details
06-09-2023
4.00
Installed high pressure fuel lines
Details
06-04-2023
1.50
Ran fuel lines to mini header tank
Details
06-02-2023
4.50
Installed header fuel tank
Details
02-24-2023
4.00
Fabricated fuel lines for fuel selector forward
Details
02-24-2023
2.50
Fabricated fuel filter bracket
Details
SITE NAVIGATION
Contact Builder
CH-601 HDS Home
Category
# Logs
# Hours
All
117
471
Aircraft Electrical
29
102
Avionics
9
20
BRS 1350 Chute
6
54
Controls
1
2
Engine
18
52
Firewall Forward
10
40
Fuel system
13
56
Fuselage
11
40
Interior
1
0
Landing Gear
2
10
Miscellaneous
12
80
Prop
1
1
Wings
4
14
Copyright © 2001-2024 Matronics. All Rights Reserved.