KitLog pro

Powered By Kitlog Pro v2.0

Zenith 601 HDS N219BD
Work Logs Found: 29
Category Work Time: 102 Hours
 Date
Hours
Work Log Summary

Details

 04-18-2024
2.50
Removed and installed new headphone jacks
Details

 04-04-2024
7.50
Fabricated a switch panel
Details
       

 11-11-2023
4.00
Engine electrical wires traced for GRT 6000
Details
       

 08-21-2023
6.00
Installed the main engine electrical
Details
       

 08-04-2023
2.00
Installed weatherproof 12 pin electrical connector
Details
     

 08-01-2023
1.00
Replaced landing and taxi lights
Details
       

 07-16-2023
5.00
Re-made Engine electrical panel
Details
       

 07-06-2023
4.00
Tested right wing tank sender and gauge
Details
       

 06-02-2023
4.50

Details
       

 05-30-2023
1.00
Ran shielded wires to the headset jacks.
Details
       

 03-31-2023
1.00
Tested wing and panel lights
Details
       

 03-22-2023
3.50
Installed coil electrical wires to + battery
Details
       

 03-22-2023
0.50
Changed battery to ground negative (-) wire from 4
Details
     

 03-21-2023
5.00
Installed and tested TCW IBBS battery
Details

 03-18-2023
2.50
Worked on the starter power lines and test
Details
       

 03-18-2023
5.00
Added Essential Bus Relay + Tested
Details
       

 03-17-2023
4.50
Spent the day checking circuits and reviewing sche
Details
       

 03-16-2023
1.00
Continued labeling circuits.
Details
     

 03-14-2023
4.00
Completed Crowbar (40A) install.
Details
       

 03-13-2023
2.50
Installed ANL 40A in line circuit breaker
Details
     

 03-12-2023
1.00
Fabricated Crowbar electrical device stand/holder
Details
       

 03-12-2023
5.00
Continued working on aircraft electrical
Details
       

 03-11-2023
8.00
Installed Primary Power Circuit
Details
       

 03-06-2023
4.50
planning the electrical layout
Details
       

 02-15-2023
2.00
Adding new Mil Spec wiring for Voltage Regulator
Details
       

 01-22-2023
1.50
Fabricated new coil wire
Details
       

 01-17-2023
3.00
Installed pass-through and dual coils
Details
       

 10-25-2022
2.00
Removed electrical panel "brow"
Details
     

 10-21-2022
8.00
Remove and organize wiring
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.