Powered By Kitlog Pro v2.0
Chriss Web Site
RV-9A
Empennage
Work Logs Found:
17
Category Work Time:
50 Hours
Date
Hours
Work Log Summary
Details
07-19-2020
4.00
Fitted vertical satabilized in position
Details
07-18-2020
3.00
Aligned vertical stabilizer
Details
07-18-2020
6.00
Aligned and fitted horizontal stabilizer
Details
04-06-2019
3.00
Elevator trim tab
Details
03-29-2019
3.00
Elevator trim tab
Details
03-29-2019
3.00
Elevator trim
Details
03-28-2019
2.00
Elevator trim tab
Details
02-28-2019
3.00
Elevator tip fairings
Details
02-27-2019
3.00
Landing light
Details
02-27-2019
3.00
Elevator tip fairings
Details
02-26-2019
3.00
Fit elevator tip fairings
Details
02-25-2019
3.00
Elevator trim-tab hinge
Details
02-25-2019
3.00
Elevator tip fairings
Details
01-23-2019
2.00
rudder bottom fairing trim and fit
Details
01-17-2019
3.00
tail light fitting
Details
01-05-2019
2.00
Rudder tip fairing
Details
01-04-2019
1.00
Fin fairing
Details
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
187
584
Avionics
7
49
Electrics
6
31
Empennage
17
50
Engine
4
10
Final assembly
3
9
Finishing Kit
10
71
Fuselage
55
175
Miscellaneous
3
8
Paint Scheme
1
2
Shop Supplies
1
1
Upholstry
2
4
Wings
78
174
Copyright © 2001-2024 Matronics. All Rights Reserved.