KitLog pro

Powered By Kitlog Pro v2.0

Chriss Web Site
Work Logs Found: 6
Category Work Time: 31 Hours
 Date
Hours
Work Log Summary

Details

 02-08-2022
2.00
Battery rewired the terminals
Details
     

 01-25-2022
2.00
Install Battery
Details
       

 07-17-2020
4.00
Fitted connectors to electric trim
Details

 04-11-2020
10.00
Switch panels assembled and wired
Details
     

 04-07-2020
7.00
Switch Panels
Details
     

 03-02-2020
6.00
VP-X install
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.