KitLog pro

Powered By Kitlog Pro v2.0

Jons Web Site
Work Logs Found: 10
Category Work Time: 29 Hours
 Date
Hours
Work Log Summary

Details

 01-22-2023
2.00
Completed nav/strobe installation.
Details
       

 01-20-2023
1.00
Installed hour meter.
Details

 12-27-2022
2.50
Fabricated and installed pitot tube.
Details
       

 12-24-2022
2.20
Installed strobe driver box.
Details
     

 11-27-2022
3.00
Wiring tidy up
Details
     

 11-26-2022
4.20
More wiring
Details

 11-24-2022
1.20
Install ELT
Details
     

 11-20-2022
5.20
Installed wiring
Details
     

 11-13-2022
3.30
Installed instruments switches and circuit breaker
Details
     

 11-10-2022
4.20
Constructed Instrument panel
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.