KitLog pro

Powered By Kitlog Pro v2.0

Jons Web Site
Work Logs Found: 31
Category Work Time: 87 Hours
 Date
Hours
Work Log Summary

Details

 02-04-2023
2.00
Windshield install
Details
     

 01-29-2023
1.50
Installed tip windshield/ wing center fairing.
Details

 01-15-2023
6.20
Trim Paint
Details
       

 01-09-2023
4.00
Painted white base coat.
Details

 01-08-2023
1.00
Tightened fabric to eliminate any wrinkles.
     

 01-08-2023
6.20
Installed seam tape, fuselage.
Details

 01-07-2023
8.20
Covered fuselage.
Details
       

 12-30-2022
2.20
Install differential wheel brake system.
Details
     

 12-28-2022
2.50
Began covering fuselage.
Details
     

 12-18-2022
0.75
Sanded Fiberglass components
Details
     

 12-14-2022
6.40
Fabricated and installed electric elevator trim sy
Details
       

 12-10-2022
1.30
Installed forward nose cone and fabric formers
Details
     

 12-03-2022
4.30
fabricated side access panels to rear area
Details
     

 11-20-2022
6.80
Fabricate battery tray
Details
     

 11-01-2022
0.50
Installed nose gear assembly
Details
       

 10-26-2022
1.20
Set up Rudder and Elevators in neutral position
Details
       

 10-24-2022
0.50
Install rony brackets and vertical stabilizers
Details
       

 10-23-2022
4.50
Install rotating beacon cover vertical fin.
Details
       

 10-08-2022
1.10
Mounted front and rear seat harnesses
Details
       

 10-02-2022
2.60
Install front and rear throttle levers.
Details
     

 09-30-2022
2.20
Rear pushrod covers.
Details
     

 09-30-2022
2.30
main landing gear
Details
       

 09-30-2022
2.60
Landing Gear
Details
       

 09-27-2022
2.00
Motor mount, wing mount brackets, flap motor
Details
       

 09-26-2022
3.20
Installed fuel gauge
Details
     

 09-24-2022
2.50
Installed Rudder pushrods and nose steering pushro
Details
       

 09-22-2022
2.50
Install main landing gear legs.
Details
       

 08-18-2022
1.00
Connect upper aileron belcrank to pushrods.
Details
       

 08-16-2022
3.50
Vertical fin finish
Details
       

 08-15-2022
0.50
Installed vertical fin.
Details
     

 08-15-2022
1.00
installed belcranks for elevator pushrods.
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.