Powered By Kitlog Pro v2.0
Jons Web Site
Excalibur
Wings
Work Logs Found:
44
Category Work Time:
114 Hours
Date
Hours
Work Log Summary
Details
01-29-2023
4.50
Wing Jury Struts
Details
01-28-2023
2.60
Final flap installation
Details
01-22-2023
1.00
flap and jury struts
Details
01-22-2023
1.60
Connect ailerons
Details
01-21-2023
1.50
Bolted wings on
Details
07-18-2022
2.00
painted stripes
Details
07-09-2022
2.50
Painted RH aileron fairing, bolted aileron on
Details
07-08-2022
2.30
Sanded and paint LH wing fairing, construct RH win
Details
07-07-2022
2.00
Permanently fixed aileron fairing in place left wi
Details
07-04-2022
4.30
Fabricated new fairings for aileron push tube exit
Details
07-03-2022
3.25
re- cut aileron push tube exit holes
Details
07-02-2022
2.50
Remove old Aileron push tube fairings.
Details
06-28-2022
1.00
Paint RH wing
Details
06-26-2022
4.00
Paint RH wing
Details
06-22-2022
2.00
Painted on RH wing
Details
06-19-2022
2.50
Attach Control Surfaces LH wing
Details
06-18-2022
6.00
Painted on LH wing
Details
06-02-2022
2.25
Finish seam tapes left wing
Details
06-01-2022
2.00
Beginning leading and trailing edge seam tape
Details
05-29-2022
2.50
Install seam tape to top rib surfaces
Details
05-28-2022
2.80
Rivets in top of left wing
Details
05-27-2022
2.50
Sealing upper covering on left wing
Details
05-25-2022
1.00
worked on sealing left wing lower covering
Details
05-24-2022
1.00
left wing lower covering
Details
05-22-2022
1.75
continuing left wing covering
05-21-2022
2.00
starting left wing lower surface cover
Details
05-20-2022
2.50
sealing up right wing edges
Details
05-18-2022
1.00
Installed seam tape right wing tip
Details
05-17-2022
4.50
Install 2 inch seam tape on top ribs right wing
Details
05-16-2022
4.50
Right wing work
Details
05-15-2022
5.50
Right wing work
Details
05-14-2022
2.50
Install anti-chafe tape flaps and ailerons.
Details
05-14-2022
5.25
Covering left wing bottom
Details
05-13-2022
3.00
Connect pushrods and install strobe wire
Details
05-12-2022
1.00
constructed long aileron pushrods
Details
05-11-2022
2.00
Wing aileron bellcranks
Details
05-09-2022
1.50
left wing bottom anti-chafe tape
Details
05-08-2022
1.50
wing anti-chafe tape
Details
05-07-2022
4.50
left wing ribs and supports
Details
05-06-2022
2.25
Installed root ribs and sheet aluminum on left win
05-05-2022
1.00
Installed front and rear spar transition
Details
05-04-2022
1.00
Installed right wing nutplates
Details
05-03-2022
4.20
Installed wing ribs right wing
Details
05-02-2022
3.00
Install root ribs and sheet metal
Details
SITE NAVIGATION
Contact Builder
Excalibur Home
Category
# Logs
# Hours
All
111
283
Avionics
10
29
Empennage
13
30
Engine
11
22
Fuselage
31
87
Miscellaneous
2
1
Wings
44
114
Copyright © 2001-2024 Matronics. All Rights Reserved.