Powered By Kitlog Pro v2.0
Tony's RV-6A Web Site
RV-6A
Empennage
Work Logs Found:
20
Category Work Time:
58 Hours
Date
Hours
Work Log Summary
Details
10-19-2023
2.50
Elevator trim and rudder
Details
10-18-2023
2.00
Elevator
Details
03-14-2023
10.00
Emepennage parts
Details
03-07-2023
1.50
Elevator
Details
03-06-2023
2.00
Vertical stabilizer and rudder
Details
03-05-2023
2.00
Empennage fairings
Details
02-25-2023
1.50
Elevator fairing end caps
Details
02-23-2023
1.00
Horizontal stabilizer
Details
02-22-2023
1.00
Horizontal stabilizer
Details
02-19-2023
4.50
Vertical stabilizer and rudder
Details
02-18-2023
2.00
Empennage fairing plate nuts
Details
02-08-2023
2.00
Empennage lower fairing (passenger side)
Details
02-07-2023
2.00
Empennage lower fairing (passenger side)
Details
02-06-2023
2.00
Empennage lower fairing (pilot side)
Details
02-05-2023
3.00
Empennage lower fairing (pilot side)
Details
02-04-2023
2.50
Empennage fairing
Details
02-02-2023
3.00
Empennage fairing
Details
01-28-2023
2.00
Empennage
Details
01-18-2023
8.00
Vertical stabilizer and rudder
Details
01-16-2023
3.00
Horizontal stabilizer and elevator
Details
SITE NAVIGATION
Contact Builder
RV-6A Home
Category
# Logs
# Hours
All
609
1445
Avionics
17
32
Electrical
8
18
Empennage
20
58
Engine
90
229
Finish Kit
64
164
Firewall
15
24
Fuselage
278
579
Lighting
10
26
Miscellaneous
9
19
Paint
17
52
Panel
20
38
Prop
2
2
Shop Supplies
1
3
Tools
2
11
Wings
56
190
Copyright © 2001-2024 Matronics. All Rights Reserved.