KitLog pro

Powered By Kitlog Pro v2.0

Marlins Web Site
Work Logs Found: 50
Category Work Time: 344 Hours
 Date
Hours
Work Log Summary

Details

 04-18-2023
6.00
Modify Front Baffles and Install Rubber Seals
Details
       

 04-14-2023
6.00
Install & Seal Baffles, Glass in Ramps
Details
       

 03-28-2023
17.00
Rivet Rubber Baffle Seals
Details
       

 03-27-2023
5.00
Cut Rubber Baffle Seals
Details
       

 02-23-2023
8.00
Fabricate the Rubber Baffle Seals
Details
       

 02-22-2023
6.00
Fabricate/Trim the Front Engine Baffles (Cont.)
Details
       

 02-15-2023
20.00
Fabricate/Trim the Front Engine Baffles
Details
       

 02-14-2023
8.00
Create Inlet Outer Curved Flanges (Cont.)
Details
       

 02-13-2023
6.00
Create Inlet Outer Curved Flanges
Details
       

 01-13-2023
6.00
Drill and Install Magneto & Fuel Pump Blast Tubes
Details
       

 01-13-2023
1.00
Drill and Install Magneto & Fuel Pump Blast Tubes
Details
       

 01-12-2023
6.00
Installed Right Inlet Floor Heater Flange & Heat M
Details
       

 01-11-2023
6.00
Installed Right Inlet Floor Heater Flange & Heat M
Details
       

 01-10-2023
3.00
Adding Spark Plug Wire Mounts and Ties
Details
       

 01-06-2023
5.00
Fixing Cabin Heat Flange
Details
       

 01-05-2023
3.00
Final Snorkel Installation/Mounting
Details
       

 01-04-2023
6.00
Fabricating and Installing Baffle Tension Rods (Co
Details
       

 01-03-2023
12.00
Fabricating and Installing Baffle Tension Rods
Details
       

 01-02-2023
4.00
Painted Baffle Parts
Details
       

 12-21-2022
10.00
Installing the Filter Bypass Door (Cont.)
Details
       

 12-19-2022
12.00
I0-360 Filter Bypass Door Installation
Details
       

 12-16-2022
10.00
Fiberglass Snorkel
Details
       

 12-12-2022
18.00
Continued Snorkel Install; Begin Air Ramp Mods
Details
       

 12-08-2022
13.00
Continued Snorkel Install; Begin Air Ramp Mods
Details
       

 12-06-2022
6.00
Continued Snorkel Install; Begin Air Ramp Mod
Details
       

 12-05-2022
1.00
Continued Snorkel Install; Begin Air Ramp Mods
Details
       

 11-22-2022
1.00
Brackets for Front-Center Baffles (Cont.)
Details
       

 11-21-2022
1.00
Brackets for Front-Center Baffles
Details
       

 11-18-2022
5.00
Cut, Fit, Bend the Front-Center Baffles (Cont.)
Details
       

 11-17-2022
10.00
Cut, Fit, Bend the Front-Center Baffles
Details
       

 11-07-2022
5.00
Marking and Cutting Side Baffles
Details
       

 11-05-2022
3.00
Left Forward Ramp Support
Details
       

 11-04-2022
4.00
Fitting the Front Baffles to the Cowl Inlets (Cont
Details
       

 11-03-2022
5.00
Fitting the Front Baffles to the Cowl Inlets
Details
       

 11-02-2022
4.00
Cutting & bending side baffle flanges
Details
       

 10-28-2022
4.00
Cut Outboard Baffle and Floor-Baffle Flanges (cont
Details
       

 10-27-2022
5.00
Cut Outboard Baffle and Floor-Baffle Flanges
Details
       

 10-25-2022
6.00
Cut Outboard Baffle and Floor-Baffle Flanges
Details
       

 10-18-2022
12.00
Install Baffling (cont.)
Details
       

 10-03-2022
9.00
Install Baffling (cont.)
Details
       

 09-30-2022
6.00
Install Baffling (cont.)
Details
       

 09-27-2022
18.00
Install Baffling (cont.)
Details
       

 09-22-2022
7.00
Install Baffling (cont.)
Details
       

 09-20-2022
6.00
Install Baffling (cont.)
Details
       

 09-19-2022
4.00
Install Baffling (cont.)
Details
       

 09-17-2022
6.00
Install Baffling (cont.)
Details
       

 09-15-2022
1.00
Install Baffling (cont.) Oil Cooler Brace
Details
       

 09-14-2022
6.00
Install Baffling (cont.)
Details
       

 09-13-2022
6.00
Install Baffling (cont.)
Details
       

 09-12-2022
6.00
Install Baffling
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.