HB-YAK GS-2 Sportsman 2+2 kit
Work Logs Found: 9
Category Work Time: 38 Hours
 Date
Hours
Work Log Summary

Details

 01-19-2023
8.00
Avionics tray installed
       

 01-05-2023
4.00
Placing and fixing the different units
       

 01-05-2023
1.00
Mounting the GSU 25C on the back of the GDU 470 di
       

 01-05-2023
1.00
Fixing the beacket for the GMU
       

 08-06-2022
4.00
Modify wrenches -> special tools
       

 08-06-2022
2.00
Instument panel ready for painting
       

 08-06-2022
8.00
Instument panel is progressing
       

 07-23-2022
2.00
Drilled and pre installed the engine controls
       

 05-21-2022
8.00
Adjusting the laser cut aluminium boards
       