Powered By Kitlog Pro v2.0
CHUCK'S WEB SITE
Sonex-B Tri-Gear
Controls
Work Logs Found:
20
Category Work Time:
62 Hours
Date
Hours
Work Log Summary
Details
08-13-2023
2.00
Shortened Control Stick For HDX Clearance
Details
01-18-2023
1.30
Adjusting Slave Cable On Throttle Quadrants
Details
01-15-2023
1.90
Connecting Slaved Throttle Quadrant Cable
Details
01-14-2023
1.50
Securing Throttle Cables To Quandrants
Details
01-07-2023
4.20
Rigging And Running Throttle And Mixture Cables
Details
11-24-2022
0.75
Riveted Nose Trim Linear Actuator Mounts
Details
11-21-2022
2.10
Finished Mounting Flap & Nose Trim Actuators
Details
11-13-2022
3.50
Converting Flap Drive Tube For Rev 4 Actuator
Details
11-12-2022
2.10
Adjusting The Trim Springs
Details
11-11-2022
6.25
Mounting Nose Trim Springs
Details
11-10-2022
3.45
Mounted Linear Actuator For Nose Trim
Details
11-06-2022
5.80
Fabricating Aluminum Mounting Brackets
Details
11-05-2022
6.10
Designing Brackets For Trim Linear Actuator
Details
09-19-2022
1.90
Mounting Dual Throttle Quadrants
Details
08-20-2022
1.00
Lubed Rudder Pedal Pivot Blocks
Details
08-15-2022
2.80
Fabricating And Mounting Rudder Cable Fairings
Details
08-14-2022
4.80
Flap And Aileron Pushrod Assemblies
Details
08-10-2022
3.30
Installed Flap Drive Tube
Details
08-08-2022
3.25
Fabricate Flap Drive Tube Pivot Blocks
Details
05-04-2022
4.25
Installing Control Stick Grip.
Details
SITE NAVIGATION
Contact Builder
Sonex-B Tri-Gear Home
Category
# Logs
# Hours
All
463
1153
Avionics
53
142
Controls
20
62
Cowling
66
140
Documentation
69
81
Electrical System
4
17
Empennage
56
163
Engine
43
98
Fuel System
8
17
Fuselage
79
232
Landing Gear
28
97
Miscellaneous
8
12
Plans Review
7
14
Tools
3
10
Wings
19
68
Copyright © 2001-2024 Matronics. All Rights Reserved.