CHUCK'S WEB SITE
Sonex-B Tri-Gear
Avionics
Work Logs Found:
53
Category Work Time:
142 Hours
Date
Hours
Work Log Summary
Details
03-23-2024
1.00
Finalizing CHT Sensor Install Under Spark Plugs
Details
02-04-2024
2.90
Installing 2nd Firewall Fireproofed Wire Passage
Details
02-03-2024
1.00
Installing Cylinder Head Temperature Sensors
Details
08-20-2023
3.10
Fabricate And Install GPS Antenna Doubler Plate
Details
08-19-2023
0.50
Installed the EGT Sensor Probes
Details
08-18-2023
2.15
Completed MFD Tray Assmbly
Details
08-16-2023
4.70
Completed PFD Tray Assembly.
Details
08-15-2023
3.90
Cutting/Fabricating Avionics Tray Finals
Details
08-14-2023
2.40
Avionics Trays Final Toolpath Designs
Details
08-13-2023
1.50
Pulled Intrument Panel To Make Final Trays
Details
07-18-2023
1.90
Final Mounting Of Radio, Transponder And ADS-B.
Details
07-17-2023
1.30
Adding Nutplate Hardware To Mounting Brackets
Details
07-16-2023
6.40
Cutting Radio, Transponder And ADS-B Brackets
Details
07-15-2023
4.30
Radio, Transponder And ADS-B Mount Design
Details
07-10-2023
2.10
Final Mounting Of Left CF Overlay Panel
Details
07-09-2023
3.80
Mounting Of Left CF Overlay Panel
Details
07-07-2023
1.20
Final Mounting Of Right CF Overlay Panel
Details
07-06-2023
3.60
Mounting Headset Jacks And CF Overlay Panels
Details
06-30-2023
2.80
Left Carbon Fiber Overlay Panel Cut
Details
06-29-2023
3.20
Right Carbon Fiber Overlay Panel Cut
Details
06-27-2023
0.90
Continued Headset Jack Panel Overlay Design
Details
06-25-2023
1.60
Designing Overlays For Headset Plugs
Details
06-22-2023
1.80
Final Mounting Of The ADAHRS Unit
Details
06-20-2023
1.60
Initial Mounting Of The ADAHRS Unit
Details
06-19-2023
3.10
Fabricating An Adjustable ADAHRS Mount
Details
06-13-2023
2.20
Installing the ELT Antenna
Details
06-12-2023
1.90
Installing GPS Antenna
Details
06-11-2023
3.20
Drilling Attachment Points For Tray Components
Details
06-10-2023
1.75
Test Fitting Initial Avionics Trays
Details
06-06-2023
0.20
Updated Anttenna Position Drawing To v3
Details
06-06-2023
2.60
Mounting ADS-B Traffic And Weather Antenna
Details
06-05-2023
6.10
Fabricating Mounting Brackets For The ELT
Details
06-02-2023
2.80
Fabricating Mounting Brackets For ELT
Details
05-03-2023
2.10
Finalized Antenna Locations And Wireing Runs
Details
05-02-2023
2.30
Antenna Location And Wiring Runs And Lengths
Details
04-30-2023
6.50
Locating All Antennas And ELT
Details
02-12-2023
2.30
Final Mounting/Fitting Of Displays & Control Panel
Details
02-11-2023
2.20
Paint-FilledCarbon Fiber Panel Text And Labels
Details
02-11-2023
2.60
Cutting Matching Instrument Panel Openings
Details
02-11-2023
1.80
Cutting And Fitting Rectangular Panel Openings
Details
02-09-2023
2.10
Cutting Carbon Fiber Instrument Panel Overlay
Details
02-05-2023
6.60
Redesigning Tray Side Panel For ACM Mount
Details
02-04-2023
6.10
Complete Panel Assembly And Test Fitting
Details
01-30-2023
2.70
Cutting Latest Mounting Trays And Instrument Panel
Details
01-29-2023
4.60
Designing/Testing Avionics Tray Builds
Details
01-01-2023
1.90
Adjustment To Panel For Content, Fit & Position
Details
12-28-2022
1.70
Adjustment To Panel For Content, Fit & Position
Details
12-27-2022
1.20
Adjustment To Panel For Content, Fit & Position
Details
12-26-2022
4.20
Instrument Panel Layout And Test Cuts
Details
12-10-2022
1.00
Instrument Panel Mock-Up
Details
06-05-2022
1.50
Dropping Instrument Panel 2" Below Stock
Details
03-03-2022
2.25
Instrument Panel Layout Planning - Continued
Details
03-02-2022
2.50
Instrument Panel Layout Planning
Details
SITE NAVIGATION
Contact Builder
Sonex-B Tri-Gear Home
Category
# Logs
# Hours
All
463
1153
Avionics
53
142
Controls
20
62
Cowling
66
140
Documentation
69
81
Electrical System
4
17
Empennage
56
163
Engine
43
98
Fuel System
8
17
Fuselage
79
232
Landing Gear
28
97
Miscellaneous
8
12
Plans Review
7
14
Tools
3
10
Wings
19
68
Copyright © 2001-2024 Matronics. All Rights Reserved.