Sonex-B Tri-Gear
Fuselage
Work Logs Found:
79
Category Work Time:
232 Hours
Date
Hours
Work Log Summary
Details
11-19-2022
1.60
Completing Cross Tie Box Closeout
Details
11-18-2022
1.80
Riveting Cross Tie Box Closeout & Flap Brackets
Details
11-13-2022
0.60
Clecoed Cross Tie Bottom In Place
Details
09-27-2022
2.25
Seat Back Cross Tie Hinge Installation
Details
09-25-2022
3.15
Making SNB-F08-02 Seat Back Assembly
Details
09-25-2022
2.90
Installing Vertical Tail Fiberglass Tip Continued
Details
09-20-2022
1.70
Installing Vertical Tail Fiberglass Tip
Details
09-18-2022
6.00
Installing Horizontal Tail Tips
Details
09-18-2022
5.90
Completed Installing Horizontal Tail Tips
Details
09-13-2022
1.75
Locking Pin, WS Bolts and Brakes MC
Details
09-11-2022
2.90
Trimmed Canopy Forward Edge To Windshield
Details
09-11-2022
2.15
Final Mounting Of The Windshield Assembly
Details
09-10-2022
2.75
Reviewing QB Assembly And Installing Windshield
Details
09-08-2022
2.40
Canopy Finishing Touches
Details
08-22-2022
3.10
Instrument Panel Conversion And Fuel Tank Install
Details
08-21-2022
6.25
Converting Instrument Panel To Removeable
Details
08-20-2022
5.10
Glare Shield Riveting And Inst Panel Conversion
Details
08-20-2022
1.50
Converted Fuel Tank Stop Strap To Removeable
Details
08-13-2022
3.25
Attached Lower Firewall Cowling Hinge
Details
07-12-2022
1.80
Windshield Reassembly On The Bench
Details
07-10-2022
4.50
Prep/Paint Windshield Trim Skirt Interior Side
Details
07-09-2022
1.75
Prepping And Masking Windshield Skirt For Paint
Details
07-09-2022
2.25
Installed Glare Shield, Fuel Tank And Blank Panel
Details
06-28-2022
3.50
Painted Upper Firewall Flat Black
Details
06-26-2022
4.60
Finishing
Details
06-21-2022
0.80
Glare Shield Removal
Details
06-20-2022
8.80
Final Windshield Assembly And Fit For Mounting
Details
06-19-2022
4.85
Continued Fitting/Updrilling Windshield Assembly
Details
06-18-2022
1.45
Finished Fitting/Clecoing Windshield Assembly
Details
06-17-2022
3.20
Fitting/Clecoing Windshield To Forward Fuselage
Details
06-16-2022
1.40
Windshield Pre-Drill And Skirt Initial Clecoing
Details
06-16-2022
1.75
Fitting/Clecoing Windshield to Windshield Skirt
Details
06-12-2022
1.90
Windshield Installation (Continued)
Details
06-11-2022
5.10
Windshield Installation
Details
06-11-2022
1.90
Bulhead And Tank Fittings
Details
06-08-2022
2.00
Verifying Glare Shield And Fuel Tank Fit/Position
Details
06-06-2022
2.20
Deburred Glare Shield And Instrument Panel
Details
06-05-2022
4.60
Glare Shield And Instrument Panel
Details
05-14-2022
3.10
Final Mounting Of Left And Right Wheel Fairings.
Details
05-07-2022
7.30
Control Stick Completion And Seat Belt Fitting.
Details
03-28-2022
1.25
Mounted Seat Belts.
Details
03-12-2022
1.25
Installing Fuel Tank Oops Fittings.
Details
03-11-2022
0.90
Tank Straps And Oops Fittings
Details
03-05-2022
4.60
Main Brake Lever Assembly
Details
02-15-2022
0.90
Installed Tail Skid.
Details
02-12-2022
5.10
Rudder And Elevator Control Rigging.
Details
02-12-2022
0.80
Final Riveting Of The Tail Assembly.
Details
02-12-2022
3.20
Elevator Control Push Rod Linkage.
Details
02-12-2022
3.40
Completed Rudder Controls Rigging w/Nosewheel.
Details
02-11-2022
1.50
Fabricating Rudder Cable Adjusters.
Details
02-06-2022
1.75
Control Stick Installation.
Details
02-05-2022
2.70
Control Stick Assembly - Continued.
Details
02-03-2022
5.75
Final Tail Mounting Adjustments - Completed.
Details
02-02-2022
3.50
Final Tail Mounting Adjustments - Continued.
Details
02-01-2022
1.70
Final Tail Mounting Adjustments.
Details
01-30-2022
4.80
Rudder Cabling and Control Stick.
Details
01-17-2022
3.50
Fitting Vertical Stabilizer
Details
01-13-2022
4.45
Tail Skid Mount, Rudder Stop Plates, Upper Angle
Details
01-11-2022
2.65
Tail Cone Box Assembly Work.
Details
01-11-2022
1.10
Pilot Drilled Aft 5 Inch Round Inspection Covers.
Details
01-10-2022
5.20
Tail Skid Mount And Push Rod Support Assemblies.
Details
01-09-2022
2.85
Mounting Fairlead Mounting Blocks.
Details
01-09-2022
2.30
Fabricated And Mounted Rudder Stop Plates.
Details
01-09-2022
1.75
Bushings/Grommets And Tail Cone Box Work.
Details
01-08-2022
1.60
Fabricating Fairlead Mounting Blocks.
Details
01-04-2022
1.20
Fuselage Tail Cone Box.
Details
01-02-2022
4.30
Rudder Pedal Nose Wheel Push Rod Mounting.
Details
01-02-2022
3.50
Final Fitting And Mounting Pivot Blocks.
Details
01-01-2022
4.50
Fabricating Rudder Pedal Pivot Blocks.
Details
12-25-2021
3.10
Reaming Nose Wheel Strut Bearing.
Details
12-24-2021
3.50
Assembling Nose Wheel Strut.
Details
12-23-2021
2.50
Landing Gear Work and Push Rod Boot.
Details
12-21-2021
1.10
Landing Gear And Push Rod Boot Work.
Details
12-20-2021
2.20
Landing Gear Work.
Details
12-19-2021
2.80
Landing Gear Work
Details
12-19-2021
2.50
Landing Gear Work
Details
12-12-2021
2.00
Remove Temp Attachments & Install Motor Mount
Details
12-11-2021
3.50
Remove Temp Attachments
Details
11-25-2021
0.50
Fuselage Unpack From Trailer.
Details
SITE NAVIGATION
Contact Builder
Sonex-B Tri-Gear Home
Category
# Logs
# Hours
All
463
1153
Avionics
53
142
Controls
20
62
Cowling
66
140
Documentation
69
81
Electrical System
4
17
Empennage
56
163
Engine
43
98
Fuel System
8
17
Fuselage
79
232
Landing Gear
28
97
Miscellaneous
8
12
Plans Review
7
14
Tools
3
10
Wings
19
68