Powered By Kitlog Pro v2.0
CHUCK'S WEB SITE
Sonex-B Tri-Gear
Engine
Work Logs Found:
43
Category Work Time:
98 Hours
Date
Hours
Work Log Summary
Details
04-08-2024
0.60
Installed Oil Can Fittings & Remake Oil Hose
Details
03-31-2024
7.10
3D Scanning/Modelling/Printing Left Exhaust
Details
03-29-2024
2.20
Preliminary 3D Scanning Of Left Exhaust Pipe
Details
03-28-2024
2.90
CAD Modelled The Two-Piece Slip-Joint Pipe
Details
03-27-2024
2.60
Modelled & 3D Printed The Right Header/Reducer
Details
03-26-2024
2.10
3D Scanning Jabiru Right Exhaust Header
Details
02-04-2024
1.30
Temporarily Installing Jabiru Cylinder Air Baffles
Details
02-03-2024
0.90
Installing Oil Capture Tank On Firewall
Details
01-27-2024
1.20
Mounting Of Modified Oil Cooler Air Duct
Details
01-27-2024
1.70
Mounting Modification Of Oil Cooler Air Duct
Details
12-11-2023
1.60
Moving The Mount Position Of The Oil Cooler Aft
Details
12-11-2023
2.60
Fabricating A New Oil Cooler Mounting Bracket
Details
09-02-2023
2.80
Verifying Engine Level and Forward Position
Details
09-01-2023
0.90
Replaced AN4-50A Bolts With AN4-47A Bolts
Details
08-24-2023
3.80
Prop Hub Position - Short Of Spec - Part 2
Details
08-24-2023
1.70
Prop Hub Position - Short Of Spec - Part 1
Details
08-21-2023
3.10
Fabricating The Prop Hub Spacer
Details
08-19-2023
1.90
Mounted Both Ram Air Ducts On Cylinders
Details
08-19-2023
0.60
Completed Fuel Line From Tank To Firewall
Details
01-15-2023
0.80
Re-installing The Fire Sleeved Fuel Lines
Details
01-15-2023
2.10
Fabricate Final Voltage Regulator Firewall Mount
Details
01-14-2023
3.20
Finishing Regulator Mount Prototype
Details
01-13-2023
1.40
Fire Sleeving The Firewall-Forward Fuel Lines
Details
01-02-2023
1.10
Mounting AeroInjector And Running Fuel Lines
Details
12-22-2022
0.70
Prepping AeroInjector For Installation
Details
12-17-2022
1.50
Mounting The Gascolator
Details
12-17-2022
3.75
Fabricating Gascolator Bracket
Details
12-13-2022
3.10
Designing CNC Layout Of Gascolator Bracket
Details
12-11-2022
2.10
Plumbing Oil Cooler Components
Details
12-11-2022
1.40
Finalizing The Oil Cooler Instalation
Details
12-11-2022
2.90
Assembling Oil Cooler Components
Details
12-10-2022
3.45
Fabricating Oil Cooler Mounting Brackets
Details
12-04-2022
3.40
Pulled, Adjusted And Remounted Engine.
Details
12-04-2022
4.50
Mounting Battery Box And AeroInjector Air Filter
Details
12-03-2022
3.60
Initial Jabiru 3300 Gen 4 Engine Mounting
Details
11-30-2022
1.00
Completing Battery Box Fabrication
Details
11-30-2022
0.70
Checking Rubber Engine Mounts And Bolts
Details
11-28-2022
1.20
Drilling & Dimpling Battery Box Retaining Strap
Details
11-27-2022
4.55
Re-making Firewall Battery Box
Details
11-26-2022
7.10
Fabricating Firewall Battery Box
Details
11-25-2022
1.60
Layed Out The CAD File For The Battery Box
Details
12-17-2021
0.50
Mounted Motor Mount
Details
10-13-2021
1.20
Jabiru 330 Gen 4 Engine Arrives.
Details
SITE NAVIGATION
Contact Builder
Sonex-B Tri-Gear Home
Category
# Logs
# Hours
All
463
1153
Avionics
53
142
Controls
20
62
Cowling
66
140
Documentation
69
81
Electrical System
4
17
Empennage
56
163
Engine
43
98
Fuel System
8
17
Fuselage
79
232
Landing Gear
28
97
Miscellaneous
8
12
Plans Review
7
14
Tools
3
10
Wings
19
68
Copyright © 2001-2024 Matronics. All Rights Reserved.