KitLog pro

Powered By Kitlog Pro v2.0

CHUCK'S WEB SITE
Work Logs Found: 43
Category Work Time: 98 Hours
 Date
Hours
Work Log Summary

Details

 04-08-2024
0.60
Installed Oil Can Fittings & Remake Oil Hose
Details
       

 03-31-2024
7.10
3D Scanning/Modelling/Printing Left Exhaust
Details
       

 03-29-2024
2.20
Preliminary 3D Scanning Of Left Exhaust Pipe
Details
       

 03-28-2024
2.90
CAD Modelled The Two-Piece Slip-Joint Pipe
Details
       

 03-27-2024
2.60
Modelled & 3D Printed The Right Header/Reducer
Details
       

 03-26-2024
2.10
3D Scanning Jabiru Right Exhaust Header
Details
       

 02-04-2024
1.30
Temporarily Installing Jabiru Cylinder Air Baffles
Details
       

 02-03-2024
0.90
Installing Oil Capture Tank On Firewall
Details
     

 01-27-2024
1.20
Mounting Of Modified Oil Cooler Air Duct
Details
       

 01-27-2024
1.70
Mounting Modification Of Oil Cooler Air Duct
Details
       

 12-11-2023
1.60
Moving The Mount Position Of The Oil Cooler Aft
Details
       

 12-11-2023
2.60
Fabricating A New Oil Cooler Mounting Bracket
Details
       

 09-02-2023
2.80
Verifying Engine Level and Forward Position
Details
       

 09-01-2023
0.90
Replaced AN4-50A Bolts With AN4-47A Bolts
Details
       

 08-24-2023
3.80
Prop Hub Position - Short Of Spec - Part 2
Details
       

 08-24-2023
1.70
Prop Hub Position - Short Of Spec - Part 1
Details
     

 08-21-2023
3.10
Fabricating The Prop Hub Spacer
Details
       

 08-19-2023
1.90
Mounted Both Ram Air Ducts On Cylinders
Details
       

 08-19-2023
0.60
Completed Fuel Line From Tank To Firewall
Details
       

 01-15-2023
0.80
Re-installing The Fire Sleeved Fuel Lines
Details
       

 01-15-2023
2.10
Fabricate Final Voltage Regulator Firewall Mount
Details
       

 01-14-2023
3.20
Finishing Regulator Mount Prototype
Details
       

 01-13-2023
1.40
Fire Sleeving The Firewall-Forward Fuel Lines
Details
       

 01-02-2023
1.10
Mounting AeroInjector And Running Fuel Lines
Details
       

 12-22-2022
0.70
Prepping AeroInjector For Installation
Details
       

 12-17-2022
1.50
Mounting The Gascolator
Details
       

 12-17-2022
3.75
Fabricating Gascolator Bracket
Details
       

 12-13-2022
3.10
Designing CNC Layout Of Gascolator Bracket
Details
       

 12-11-2022
2.10
Plumbing Oil Cooler Components
Details
       

 12-11-2022
1.40
Finalizing The Oil Cooler Instalation
Details
       

 12-11-2022
2.90
Assembling Oil Cooler Components
Details
       

 12-10-2022
3.45
Fabricating Oil Cooler Mounting Brackets
Details
       

 12-04-2022
3.40
Pulled, Adjusted And Remounted Engine.
Details
       

 12-04-2022
4.50
Mounting Battery Box And AeroInjector Air Filter
Details
       

 12-03-2022
3.60
Initial Jabiru 3300 Gen 4 Engine Mounting
Details
       

 11-30-2022
1.00
Completing Battery Box Fabrication
Details
       

 11-30-2022
0.70
Checking Rubber Engine Mounts And Bolts
Details
       

 11-28-2022
1.20
Drilling & Dimpling Battery Box Retaining Strap
Details
       

 11-27-2022
4.55
Re-making Firewall Battery Box
Details
       

 11-26-2022
7.10
Fabricating Firewall Battery Box
Details
       

 11-25-2022
1.60
Layed Out The CAD File For The Battery Box
Details
     

 12-17-2021
0.50
Mounted Motor Mount
Details
 

 10-13-2021
1.20
Jabiru 330 Gen 4 Engine Arrives.
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.