Powered By Kitlog Pro v2.0
CHUCK'S WEB SITE
Sonex-B Tri-Gear
Empennage
Work Logs Found:
56
Category Work Time:
163 Hours
Date
Hours
Work Log Summary
Details
02-27-2022
4.75
Completed Tail Cone Fairing And Angle Installation
Details
02-26-2022
6.00
Fitting The SNB-T01-05L/R Fairing Panels.
Details
02-25-2022
2.00
Test Fitting SNB-T01-05R Tail Cone Fairing Plate.
Details
02-24-2022
1.50
SNB-T01-05L/R CNC Tool Path Layout And Creation.
Details
02-23-2022
1.50
Computer Tracing SNB-T01-05L/R Fairing Plate.
Details
02-04-2022
3.80
Control Stick Assembly.
Details
01-31-2022
3.25
Vertical Stabilizer Fitting Continued.
Details
01-29-2022
3.60
Rudder Installation And Fitting.
Details
01-29-2022
4.50
Finalized Vertical Stabilizer Attchment Points.
Details
01-28-2022
2.50
Continued Fitting Of Vertical Stabilizer.
Details
01-25-2022
4.20
Vertical Stabilizer Installation Continued.
Details
01-23-2022
0.70
Final Fitting Of VS After Bolting Down The HS.
Details
01-22-2022
5.80
Drilling/Mounting Tail Assemblies.
Details
01-19-2022
5.00
Continued Troubleshooting Low Elevator Up Deflecti
Details
01-17-2022
1.75
Further Decreased Up Elevator Travel With VS.
Details
01-16-2022
2.50
Unable To Ahieve 25 Degree Up Rudder Deflection.
Details
01-15-2022
2.30
Trimming Horizontal Stabilizer Skins To Position.
Details
01-15-2022
2.30
Trimming Horizontal Stabilizer Skins Continued.
Details
01-14-2022
1.75
Mounting Horizontal Stabilizer And Elevator.
Details
10-30-2021
0.70
T02: Fitting Elevator To Hor Stabilizer - Complete
Details
10-25-2021
2.75
T02: Fitting Elevator To Hor Stabilizer - Part 2
Details
10-21-2021
1.40
T02: Fitting Elevator To Hor Stabilizer - Part 1
Details
10-20-2021
6.15
T02: Hor Stab Assy - Skins - Complete
Details
10-19-2021
3.00
T02: Hor Stab Assy - Skins - Part 2
Details
10-18-2021
1.10
T02: Hor Stab Assy - Skins - Part 1
Details
10-17-2021
1.00
T03: Hor Stab Main Spar Assy - Complete
Details
10-17-2021
5.70
T02: Hor Stab Assy Frame
Details
10-16-2021
4.25
T03: Hor Stab Main Spar Assy - Part 1
Details
10-16-2021
5.00
T03: Hor Stab Forward Spar Assy
Details
10-12-2021
5.65
T02: Elevator Final Assembly. Elevator Complete.
Details
10-11-2021
4.20
T02: Elevator Control Surfaces
Details
10-10-2021
5.10
T02: Elevator Control Surfaces And Drive Horn.
Details
10-09-2021
5.25
T07 & T02: Making the two elevator control surface
Details
10-07-2021
1.75
T07: Left & Right Elevator Skin Prep.
Details
10-06-2021
1.50
T07: Fabricated Elevator Hinge Halves.
Details
10-03-2021
4.00
T10/T08: Assemble Vert Stabilizer Assy - Part 1
Details
10-03-2021
1.30
T08: Assemble Vert Stabilizer Assy - Part 3
Details
10-03-2021
1.50
T08: Assemble Vert Stabilizer Assy - Part 2
Details
10-03-2021
2.70
T08: Assemble Vert Stabilizer Assy - Complete
Details
10-02-2021
7.50
T09: Vert Tail Main Spar Assy - Complete
Details
10-01-2021
1.50
Angled Rivetting Wedge
Details
09-22-2021
2.90
T09: Vert Tail Fwd Spar Assy - Complete
Details
09-21-2021
1.00
T12: Vert Tail Fwd Spar Fitting
Details
09-21-2021
0.25
T09: Vert Tail Fwd Spar Assy - Part 1
Details
09-19-2021
2.75
T08: Rudder Assy - Part 4
Details
09-19-2021
1.50
T08: Rudder Assy - Part 3
Details
09-19-2021
3.60
T08: Rudder Assy - Complete
Details
09-18-2021
1.25
T13: Rudder Skin & Hinge - Complete
Details
09-18-2021
1.10
T08: Rudder Assy - Part 2
Details
09-18-2021
4.10
T08: Rudder Assy - Part 1
Details
09-17-2021
2.75
T13: Rudder Skin & Hinge - Part 1
Details
09-14-2021
2.00
T13: Rudder Drive Horn Assy - Complete
Details
09-13-2021
1.25
T13: Drive Horn - Complete
Details
09-12-2021
2.50
T13: Drive Horn - Part 1
Details
08-30-2021
0.25
Tail Kit Inventory - Box 2
Details
08-30-2021
2.80
Tail Kit Inventory - Box 1
Details
SITE NAVIGATION
Contact Builder
Sonex-B Tri-Gear Home
Category
# Logs
# Hours
All
463
1153
Avionics
53
142
Controls
20
62
Cowling
66
140
Documentation
69
81
Electrical System
4
17
Empennage
56
163
Engine
43
98
Fuel System
8
17
Fuselage
79
232
Landing Gear
28
97
Miscellaneous
8
12
Plans Review
7
14
Tools
3
10
Wings
19
68
Copyright © 2001-2024 Matronics. All Rights Reserved.