Barry's RV14A
Work Logs Found: 77
Category Work Time: 118 Hours
 Date
Hours
Work Log Summary

Details

 03-31-2023
2.50
Bottom Cowling Close Out C/W....
Details
       

 03-29-2023
1.00
Bottom Cowl Close-Out...
Details
     

 01-26-2022
1.30
Complete Riveting/Installation of the Baffle Seals
       

 01-25-2022
0.60
Begin Riveting/Installation of the Baffle Seals
     

 01-24-2022
1.00
Cut to Length & Install Magneto Cooling Tubes

 01-21-2022
1.00
Position Baffling Sections for Riveting
       

 01-16-2022
2.25
Complete Installation of Dipsptick Access Cover
       

 01-15-2022
2.25
Begin Installation of Oil Dip Stick Access Door
Details
       

 01-14-2022
2.50
Finish Application of Heat Shielding to Lower Cowl
     

 01-13-2022
2.25
Sand & Apply Final Fill Expoy Layer to Upper Cowl

 01-13-2022
1.50
Begin Application of Heat Shielding to Lower Cowl
       

 01-09-2022
2.00
Prep & Add Fairing Filler to Upper Cowl
     

 01-08-2022
2.25
Smoothing Transition of Upper Cowl Ramps
Details

 01-03-2022
0.75
Countersink & Installing Nutplates for Bottom Cowl
     

 01-03-2022
0.75
Begin Epoxy Micro Flare Out of Left Cowl Ramp
Details
     

 01-02-2022
1.25
Begin Epoxy Micro Flare Out of Right Cowl Ramp

 01-01-2022
1.75
Prep, Clean & Epoxy Ramps to Upper Cowling
     

 12-31-2021
0.50
Match Drill Lower Cowl Fuselage Nutplate Holes
     

 12-31-2021
0.75
Final Fit & Cleco of Ramps to Upper Cowl
       

 12-30-2021
1.75
Final Trim C-00003R & Rough Cut Cowl-00003L
       

 12-30-2021
1.00
Cleco & Tape Cowl Ramps For Intial Fit Check
Details
       

 12-29-2021
1.75
Rough Cut & Trim Out of Cowl-00003R
       

 12-27-2021
1.25
Rivet L&R Horizontal Hinges to Bottom Cowl
       

 12-27-2021
1.75
Countersink L&R Hinge Rivet Points of Bottom Cowl
     

 12-26-2021
2.25
Coutersink then Rivet Hinges to Buttom Rear Cowl
     

 12-26-2021
1.25
Coutersink & Rivet Right Hinge to Buttom Cowl
     

 12-25-2021
3.00
Rivet Hinges to Top Cowling
       

 12-24-2021
1.25
Begin Countersinking Top Cowl for Hinge Rivets
     

 12-24-2021
1.75
Add Nutplates to Buttom Cowl
       

 12-23-2021
0.75
Prep Lower Cowling for Skim Coat of Epoxy Resin

 12-23-2021
1.00
Clean Excess Resin from Lower Cowl Rivet Holes

 12-23-2021
1.25
Apply Thin Layer of Resin to Lower Cowl Interior
     

 12-22-2021
0.75
Prepare Upper Cowl for Resin Application

 12-22-2021
1.00
Apply Thin Layer of Resin to Upper Cowl Interior
     

 12-21-2021
1.75
Countersink & Paint Cowl Close-Out & FF-00003B
     

 12-19-2021
0.85
Remove Polyfiber Cloth & Left Hinge Pin Blank
       

 12-18-2021
1.50
Deburr & Prep Bottom Cowl Close-Out & FF-00003B

 12-18-2021
2.50
Add Microballoons & Fiberglass cloth to Pin Covers
       

 12-15-2021
1.00
Prep Blanks for Fiberglass Lay-Up
       

 11-19-2021
1.00
Cut Out Pin Cover Hole on Left Side

 11-18-2021
3.00
Back to the Cowling. Inlet Sanding & Pin Cover
       

 10-20-2021
2.25
Remove Cowling, Deburr & Install Nutplates
       

 10-19-2021
2.25
Drill & Match Drill Upper Cowl's Horizontal Hinges
       

 10-18-2021
1.00
Mark Horizontal Upper Cowl Rivet Lines

 10-17-2021
1.00
Narrowing Down Alignment Issue. Mark Upper Cowl
       

 10-16-2021
2.25
Continue Working Hinge Pin Issues/Alignment

 10-15-2021
1.00
Continue Working Hinge Pin Issues/Alignment

 10-14-2021
1.25
Cowl Works Continue. Hinge Alignment

 10-11-2021
1.00
Match Drill Horizontal Hinge Pins, Bottom Cowling
       

 10-10-2021
1.50
Begin Bottom Cowl Left Horizontal Hinge Lay-up

 10-09-2021
2.00
Match Drill Bottom Cowl Fuselage Side Hinges

 10-08-2021
2.00
Final Fit of Bottom Cowl - Drill Hinges Tomorrow

 10-07-2021
2.50
More Bottom Cowl Works...Final Trimming..?
Details

 10-04-2021
1.75
More Bottom Cowl Works...
       

 10-03-2021
1.00
Final Fitting of Bottom Cowl. Cut ExcessFrom Sides
     

 10-01-2021
3.25
Lower Cowl Work Continues, but Getting There...
       

 09-29-2021
1.50
Lower Cowl Work Continues...
     

 09-28-2021
1.50
Lower Cowl Work Continues...

 09-26-2021
2.25
Begin Lower Cowl Works
       

 09-23-2021
2.25
Match Drill Upper Cowl to Hinges
       

 09-21-2021
1.50
Upper Cowl Work Continues...

 09-03-2021
2.00
FineTune Hinge Assembly Connections

 09-01-2021
1.00
Cowl Work Continues...

 08-29-2021
1.50
Sanding/Adjusting Aft Edge of Top Cowl

 08-25-2021
1.25
Continue Adjusting Cowl Halves Rough Matching
       

 08-24-2021
1.00
Continue Cowl Works; Sanding & Alignment

 08-22-2021
1.75
Continue Working Forward Cowl Alignment
       

 08-21-2021
1.00
Continue Cowl Works - Chat w/Vans Support

 08-18-2021
1.25
Rough Cut for Trimming of Upper Cowl
     

 08-18-2021
1.25
Rough Cut for Trimming of Lower Cowl
     

 08-17-2021
2.75
Cutout, Deburr & Polish Oil Cooler Door
       

 08-17-2021
0.75
Cutout Oil Cooler Access From Top Cowling
     

 08-16-2021
1.00
Trace Scribe Line for Trimming - Top & Bottom Cowl
     

 08-16-2021
1.00
Redo Top Cowling Hinge Pins. See Remarks
Details

 08-15-2021
2.00
Complete Cowling Hinge & Pin Fabrications
       

 08-14-2021
0.75
Begin Cowling Hinge & Pin Fabrications

 08-13-2021
1.50
Fabricate FF-01408A & FF-0148C Hinge Assemblies