Date
|
Hours
|
Work Log Summary
|
Details
|
03-31-2023
|
2.50
|
Bottom Cowling Close Out C/W....
|
Details
|
|
|
03-29-2023
|
1.00
|
Bottom Cowl Close-Out...
|
Details
|
|
|
01-26-2022
|
1.30
|
Complete Riveting/Installation of the Baffle Seals
|
|
|
|
01-25-2022
|
0.60
|
Begin Riveting/Installation of the Baffle Seals
|
|
|
|
01-24-2022
|
1.00
|
Cut to Length & Install Magneto Cooling Tubes
|
|
|
|
01-21-2022
|
1.00
|
Position Baffling Sections for Riveting
|
|
|
|
01-16-2022
|
2.25
|
Complete Installation of Dipsptick Access Cover
|
|
|
|
01-15-2022
|
2.25
|
Begin Installation of Oil Dip Stick Access Door
|
Details
|
|
|
01-14-2022
|
2.50
|
Finish Application of Heat Shielding to Lower Cowl
|
|
|
|
01-13-2022
|
2.25
|
Sand & Apply Final Fill Expoy Layer to Upper Cowl
|
|
|
|
01-13-2022
|
1.50
|
Begin Application of Heat Shielding to Lower Cowl
|
|
|
|
01-09-2022
|
2.00
|
Prep & Add Fairing Filler to Upper Cowl
|
|
|
|
01-08-2022
|
2.25
|
Smoothing Transition of Upper Cowl Ramps
|
Details
|
|
|
01-03-2022
|
0.75
|
Countersink & Installing Nutplates for Bottom Cowl
|
|
|
|
01-03-2022
|
0.75
|
Begin Epoxy Micro Flare Out of Left Cowl Ramp
|
Details
|
|
|
01-02-2022
|
1.25
|
Begin Epoxy Micro Flare Out of Right Cowl Ramp
|
|
|
|
01-01-2022
|
1.75
|
Prep, Clean & Epoxy Ramps to Upper Cowling
|
|
|
|
12-31-2021
|
0.50
|
Match Drill Lower Cowl Fuselage Nutplate Holes
|
|
|
|
12-31-2021
|
0.75
|
Final Fit & Cleco of Ramps to Upper Cowl
|
|
|
|
12-30-2021
|
1.75
|
Final Trim C-00003R & Rough Cut Cowl-00003L
|
|
|
|
12-30-2021
|
1.00
|
Cleco & Tape Cowl Ramps For Intial Fit Check
|
Details
|
|
|
12-29-2021
|
1.75
|
Rough Cut & Trim Out of Cowl-00003R
|
|
|
|
12-27-2021
|
1.25
|
Rivet L&R Horizontal Hinges to Bottom Cowl
|
|
|
|
12-27-2021
|
1.75
|
Countersink L&R Hinge Rivet Points of Bottom Cowl
|
|
|
|
12-26-2021
|
2.25
|
Coutersink then Rivet Hinges to Buttom Rear Cowl
|
|
|
|
12-26-2021
|
1.25
|
Coutersink & Rivet Right Hinge to Buttom Cowl
|
|
|
|
12-25-2021
|
3.00
|
Rivet Hinges to Top Cowling
|
|
|
|
12-24-2021
|
1.25
|
Begin Countersinking Top Cowl for Hinge Rivets
|
|
|
|
12-24-2021
|
1.75
|
Add Nutplates to Buttom Cowl
|
|
|
|
12-23-2021
|
0.75
|
Prep Lower Cowling for Skim Coat of Epoxy Resin
|
|
|
|
12-23-2021
|
1.00
|
Clean Excess Resin from Lower Cowl Rivet Holes
|
|
|
|
12-23-2021
|
1.25
|
Apply Thin Layer of Resin to Lower Cowl Interior
|
|
|
|
12-22-2021
|
0.75
|
Prepare Upper Cowl for Resin Application
|
|
|
|
12-22-2021
|
1.00
|
Apply Thin Layer of Resin to Upper Cowl Interior
|
|
|
|
12-21-2021
|
1.75
|
Countersink & Paint Cowl Close-Out & FF-00003B
|
|
|
|
12-19-2021
|
0.85
|
Remove Polyfiber Cloth & Left Hinge Pin Blank
|
|
|
|
12-18-2021
|
1.50
|
Deburr & Prep Bottom Cowl Close-Out & FF-00003B
|
|
|
|
12-18-2021
|
2.50
|
Add Microballoons & Fiberglass cloth to Pin Covers
|
|
|
|
12-15-2021
|
1.00
|
Prep Blanks for Fiberglass Lay-Up
|
|
|
|
11-19-2021
|
1.00
|
Cut Out Pin Cover Hole on Left Side
|
|
|
|
11-18-2021
|
3.00
|
Back to the Cowling. Inlet Sanding & Pin Cover
|
|
|
|
10-20-2021
|
2.25
|
Remove Cowling, Deburr & Install Nutplates
|
|
|
|
10-19-2021
|
2.25
|
Drill & Match Drill Upper Cowl's Horizontal Hinges
|
|
|
|
10-18-2021
|
1.00
|
Mark Horizontal Upper Cowl Rivet Lines
|
|
|
|
10-17-2021
|
1.00
|
Narrowing Down Alignment Issue. Mark Upper Cowl
|
|
|
|
10-16-2021
|
2.25
|
Continue Working Hinge Pin Issues/Alignment
|
|
|
|
10-15-2021
|
1.00
|
Continue Working Hinge Pin Issues/Alignment
|
|
|
|
10-14-2021
|
1.25
|
Cowl Works Continue. Hinge Alignment
|
|
|
|
10-11-2021
|
1.00
|
Match Drill Horizontal Hinge Pins, Bottom Cowling
|
|
|
|
10-10-2021
|
1.50
|
Begin Bottom Cowl Left Horizontal Hinge Lay-up
|
|
|
|
10-09-2021
|
2.00
|
Match Drill Bottom Cowl Fuselage Side Hinges
|
|
|
|
10-08-2021
|
2.00
|
Final Fit of Bottom Cowl - Drill Hinges Tomorrow
|
|
|
|
10-07-2021
|
2.50
|
More Bottom Cowl Works...Final Trimming..?
|
Details
|
|
|
10-04-2021
|
1.75
|
More Bottom Cowl Works...
|
|
|
|
10-03-2021
|
1.00
|
Final Fitting of Bottom Cowl. Cut ExcessFrom Sides
|
|
|
|
10-01-2021
|
3.25
|
Lower Cowl Work Continues, but Getting There...
|
|
|
|
09-29-2021
|
1.50
|
Lower Cowl Work Continues...
|
|
|
|
09-28-2021
|
1.50
|
Lower Cowl Work Continues...
|
|
|
|
09-26-2021
|
2.25
|
Begin Lower Cowl Works
|
|
|
|
09-23-2021
|
2.25
|
Match Drill Upper Cowl to Hinges
|
|
|
|
09-21-2021
|
1.50
|
Upper Cowl Work Continues...
|
|
|
|
09-03-2021
|
2.00
|
FineTune Hinge Assembly Connections
|
|
|
|
09-01-2021
|
1.00
|
Cowl Work Continues...
|
|
|
|
08-29-2021
|
1.50
|
Sanding/Adjusting Aft Edge of Top Cowl
|
|
|
|
08-25-2021
|
1.25
|
Continue Adjusting Cowl Halves Rough Matching
|
|
|
|
08-24-2021
|
1.00
|
Continue Cowl Works; Sanding & Alignment
|
|
|
|
08-22-2021
|
1.75
|
Continue Working Forward Cowl Alignment
|
|
|
|
08-21-2021
|
1.00
|
Continue Cowl Works - Chat w/Vans Support
|
|
|
|
08-18-2021
|
1.25
|
Rough Cut for Trimming of Upper Cowl
|
|
|
|
08-18-2021
|
1.25
|
Rough Cut for Trimming of Lower Cowl
|
|
|
|
08-17-2021
|
2.75
|
Cutout, Deburr & Polish Oil Cooler Door
|
|
|
|
08-17-2021
|
0.75
|
Cutout Oil Cooler Access From Top Cowling
|
|
|
|
08-16-2021
|
1.00
|
Trace Scribe Line for Trimming - Top & Bottom Cowl
|
|
|
|
08-16-2021
|
1.00
|
Redo Top Cowling Hinge Pins. See Remarks
|
Details
|
|
|
08-15-2021
|
2.00
|
Complete Cowling Hinge & Pin Fabrications
|
|
|
|
08-14-2021
|
0.75
|
Begin Cowling Hinge & Pin Fabrications
|
|
|
|
08-13-2021
|
1.50
|
Fabricate FF-01408A & FF-0148C Hinge Assemblies
|
|
|