Date
|
Hours
|
Work Log Summary
|
Details
|
02-01-2024
|
2.50
|
We Have Rotation...
|
Details
|
|
|
01-04-2024
|
3.00
|
Out with the Old...
|
Details
|
|
|
01-02-2024
|
1.00
|
Sniffle Valve....
|
Details
|
|
|
02-02-2022
|
0.25
|
Installed Oil Temperature Sensor
|
|
|
|
01-28-2022
|
4.00
|
Installation of Exhaust Pipes to Tailpipe
|
|
|
|
11-16-2021
|
1.75
|
Position & Celco in Place Baffle Seals
|
|
|
|
11-15-2021
|
1.50
|
Final Installation of Air Filter & Snorkel Assembl
|
|
|
|
11-14-2021
|
0.40
|
Rivet Right Ramp to Baffle
|
|
|
|
11-14-2021
|
1.25
|
Prep & Rivet Nutplate for Air Filter Lid
|
|
|
|
11-14-2021
|
1.20
|
Paint Snorkel
|
|
|
|
11-14-2021
|
1.50
|
Cut Out & Quick Fit Baffle Seals to Baffling
|
|
|
|
11-13-2021
|
2.00
|
Bend/ShapeRight & Left Ramps. Match Drill Right
|
|
|
|
11-12-2021
|
0.75
|
Sand & Prime Snorkel
|
|
|
|
11-12-2021
|
0.75
|
Practice Bending/Shaping CB-00034
|
|
|
|
11-11-2021
|
1.50
|
Sand & Apply Final Micro Balloon Coat to Snorkel
|
|
|
|
11-11-2021
|
0.75
|
RTV Left & Right Heat Vent Assemblies
|
|
|
|
11-10-2021
|
0.50
|
Fabricate Gasket for Snorkel to Fuel Injector
|
|
|
|
11-10-2021
|
2.50
|
Alt. Ait Installation & Micro Ballooning
|
|
|
|
11-06-2021
|
1.00
|
Complete Micro Balloon Applications to Snorkel
|
|
|
|
11-05-2021
|
1.20
|
Prep Work & Apply Resin to Snorkel/Filterbox
|
|
|
|
11-04-2021
|
1.25
|
Snorkel Works Continues...
|
|
|
|
11-03-2021
|
1.25
|
Complete VA-192A. Cut & Drill Snorkel
|
|
|
|
11-01-2021
|
1.75
|
Snorkel Works
|
|
|
|
10-30-2021
|
3.00
|
Fabricate Stainless Wire Rope Tension Rods
|
Details
|
|
|
10-30-2021
|
0.75
|
Begin Fitting of the Air Filter Box Snorkel
|
|
|
|
10-29-2021
|
2.00
|
Complete the Installation of Enigne Engine Baffles
|
|
|
|
10-28-2021
|
4.00
|
Begin the Installation of Engine Baffles
|
|
|
|
10-27-2021
|
2.75
|
Apply RTV to Specific Area of Engine Baffels
|
|
|
|
10-26-2021
|
2.00
|
Prep Baffles for RTV
|
|
|
|
08-02-2021
|
0.25
|
Finish Safety Wiring Alternator, 2nd Bolt
|
|
|
|
07-29-2021
|
1.25
|
Install Avstar Fuel Injection Servo
|
|
|
|
07-29-2021
|
0.40
|
Install & Safety Wire Oil Dip Stick Assembly
|
|
|
|
07-28-2021
|
1.50
|
Prep. Fuel Injector Servo for Installation
|
Details
|
|
|
07-25-2021
|
1.75
|
Complete Installation of Remote Oil Filter
|
|
|
|
07-24-2021
|
4.50
|
Airwolf Remote Oil Filter Assembly & Installation
|
Details
|
|
|
07-17-2021
|
3.50
|
Hang Engine to Mount
|
|
|
|
07-17-2021
|
0.75
|
Check Engine Mount Torque & Nose Gear Points
|
|
|
|
07-10-2021
|
0.75
|
Assemble & Install Prop Governor Bracket Assy.
|
|
|
|
06-20-2021
|
1.75
|
Unpack & Lift Engine from Packaging Crate
|
|
|
|
06-04-2021
|
0.40
|
Engine Arrives, Albeit Six Weeks Late...
|
|
|