Barry's RV14A
Work Logs Found: 74
Category Work Time: 312 Hours
 Date
Hours
Work Log Summary

Details

 07-08-2024
0.75
Comm 2 Okay, as is G3X Ammeter Indicator...
Details

 07-06-2024
2.00
Comm Radios Issue Resolved...
Details
     

 05-04-2024
2.50
Sweet...
Details
       

 05-03-2024
0.50
UPDATE: PFD Configuration Module...
Details
       

 05-02-2024
4.50
Chip Gone Bad Replacement...
Details
       

 04-30-2024
2.40
Magnetometer Calibration, etc...
Details
       

 04-28-2024
2.80
The Beat Goes On...
Details
     

 02-14-2024
2.80
It's a Wrap...
Details
     

 02-13-2024
2.30
The Fix...
Details
       

 02-12-2024
2.30
Wow - That Hurt...
Details
       

 02-10-2024
6.00
Button Switch Gone Bad...
Details
       

 02-04-2024
2.80
Pitot Tube Installation & Captain, We've Got Press
Details
       

 01-24-2024
2.50
Flyleds Strobe Controller Wire-Up...
Details
     

 01-22-2024
3.00
Landing & Taxi Lighting Connections...
Details
       

 01-16-2024
2.30
Cold Snap Slow Down....
Details
     

 01-12-2024
1.50
Garmin G3X Update, 9.31...
Details
       

 01-09-2024
3.00
Panel Power-Up...
Details
       

 08-25-2023
1.50
Aileron Servo Harness Adjustment...
Details
       

 08-15-2023
2.50
Finished Pitot Tube Installation...
Details
       

 08-09-2023
2.30
Wired the GAP-26 Remote...
Details
       

 08-08-2023
3.30
GAP-26 Pitot Installation...
Details
       

 01-29-2023
5.50
Rework C/W...
Details
       

 01-26-2023
7.50
Re-Work... It Happens.
Details
       

 01-13-2023
2.80
Magnetometer....
Details
       

 01-07-2023
1.00
Connected VOR Antenna...
Details
       

 01-02-2023
9.00
Just About Ready for Power-Up...
Details
       

 12-27-2022
1.30
Brace for It...
Details
       

 12-26-2022
3.50
Completed EMAG Installation...
Details
       

 12-23-2022
11.50
E-Mags Reinstalled, etc.
Details
       

 12-14-2022
3.50
Stuffing, Wrapping & Tying. Season Greetings..!
Details
     

 12-12-2022
8.50
An Inconvenience...
Details
       

 12-06-2022
4.00
More Wire Routing - Getting There...
Details
     

 12-04-2022
1.30
Keyed Switch Added...
Details
       

 12-02-2022
4.00
Hurdle Cleared...
Details
       

 12-01-2022
1.50
8 Gauge Tie-In
Details
     

 11-30-2022
2.30
Tie it Together...
Details
     

 11-26-2022
3.50
Installation of FlyLed's Control Board...
       

 11-24-2022
11.80
It's Not Over - Until It's Over...
Details
       

 10-30-2022
3.20
Installation of VOR Antenna in Right Wing Tip.
Details
       

 10-26-2022
2.20
OAT Probe...
Details
       

 10-21-2022
4.20
Antenna Installation Wrap-Up...
Details
     

 10-16-2022
6.30
Antenna Coaxial Cable Runs & Connections...
Details
     

 10-12-2022
2.50
Mating BNC Connectors to RG400 Coax...
Details
       

 10-01-2022
5.80
GPS Antenna Installation...
Details
       

 09-24-2022
2.50
Loop It...
Details
       

 09-22-2022
1.80
Antenna Mounting & SteinAir Feedback Update...
Details
       

 09-21-2022
3.50
Moving Forward...
Details
       

 09-20-2022
0.80
Too Much of a Good Thing...
Details
       

 09-18-2022
8.30
It's a Wrap. Well, Not Really...
Details
       

 09-15-2022
6.80
67% There...
Details
       

 09-07-2022
7.50
Stuffing Wires - The Battle Continues...
Details
       

 09-02-2022
11.00
Return To Panel Installation...
Details
       

 08-22-2022
9.50
Wiring Continues...
Details
       

 08-12-2022
2.20
Final.., The Navigator is Fitted...
Details
       

 08-09-2022
2.30
Fitting GTN750Xi's Rack...
Details
     

 08-06-2022
1.30
Garmin's GTN750Xi
Details
     

 08-05-2022
4.50
A Fairly Productive Day...
Details
       

 08-04-2022
4.00
More Remote Installations...
Details
       

 08-03-2022
3.50
Plan C...
Details
       

 08-02-2022
3.80
Back From Vacation - The Assembly Continues...
Details
     

 07-23-2022
5.50
It's Sometimes a Slow Road to Progress...
Details
       

 07-13-2022
5.30
IBBS Installation & Re-Fab of Vertical Mount
Details
       

 07-11-2022
9.20
Remote Box Stack w/Hinge Modification
Details
       

 07-06-2022
4.50
The Beatings Will Continue Until Morale Improves..
Details
       

 07-05-2022
3.70
GTX45, GDL51 & GAD29 Remote Box Works...
Details
       

 07-04-2022
14.70
Fabrication Trials & Errors....
Details
       

 06-24-2022
8.20
Glove Box Hinged Panel Mod
Details
       

 06-22-2022
14.80
Remote Avioic Box Layout
Details
       

 06-14-2022
4.00
Begin Instrument Panel Installation
Details
       

 04-28-2022
3.50
Vendor Screws Customer...
Details
       

 04-26-2022
2.30
Install ELT + Components
       

 04-23-2022
0.50
Stein Air Panel Arrives
       

 03-30-2022
0.00
Stein Air Update - See Details...
Details
       

 03-25-2019
1.75
Cut out foam blocks, bend skin tabs, prep spars