Date
|
Hours
|
Work Log Summary
|
Details
|
07-08-2024
|
0.75
|
Comm 2 Okay, as is G3X Ammeter Indicator...
|
Details
|
|
|
07-06-2024
|
2.00
|
Comm Radios Issue Resolved...
|
Details
|
|
|
05-04-2024
|
2.50
|
Sweet...
|
Details
|
|
|
05-03-2024
|
0.50
|
UPDATE: PFD Configuration Module...
|
Details
|
|
|
05-02-2024
|
4.50
|
Chip Gone Bad Replacement...
|
Details
|
|
|
04-30-2024
|
2.40
|
Magnetometer Calibration, etc...
|
Details
|
|
|
04-28-2024
|
2.80
|
The Beat Goes On...
|
Details
|
|
|
02-14-2024
|
2.80
|
It's a Wrap...
|
Details
|
|
|
02-13-2024
|
2.30
|
The Fix...
|
Details
|
|
|
02-12-2024
|
2.30
|
Wow - That Hurt...
|
Details
|
|
|
02-10-2024
|
6.00
|
Button Switch Gone Bad...
|
Details
|
|
|
02-04-2024
|
2.80
|
Pitot Tube Installation & Captain, We've Got Press
|
Details
|
|
|
01-24-2024
|
2.50
|
Flyleds Strobe Controller Wire-Up...
|
Details
|
|
|
01-22-2024
|
3.00
|
Landing & Taxi Lighting Connections...
|
Details
|
|
|
01-16-2024
|
2.30
|
Cold Snap Slow Down....
|
Details
|
|
|
01-12-2024
|
1.50
|
Garmin G3X Update, 9.31...
|
Details
|
|
|
01-09-2024
|
3.00
|
Panel Power-Up...
|
Details
|
|
|
08-25-2023
|
1.50
|
Aileron Servo Harness Adjustment...
|
Details
|
|
|
08-15-2023
|
2.50
|
Finished Pitot Tube Installation...
|
Details
|
|
|
08-09-2023
|
2.30
|
Wired the GAP-26 Remote...
|
Details
|
|
|
08-08-2023
|
3.30
|
GAP-26 Pitot Installation...
|
Details
|
|
|
01-29-2023
|
5.50
|
Rework C/W...
|
Details
|
|
|
01-26-2023
|
7.50
|
Re-Work... It Happens.
|
Details
|
|
|
01-13-2023
|
2.80
|
Magnetometer....
|
Details
|
|
|
01-07-2023
|
1.00
|
Connected VOR Antenna...
|
Details
|
|
|
01-02-2023
|
9.00
|
Just About Ready for Power-Up...
|
Details
|
|
|
12-27-2022
|
1.30
|
Brace for It...
|
Details
|
|
|
12-26-2022
|
3.50
|
Completed EMAG Installation...
|
Details
|
|
|
12-23-2022
|
11.50
|
E-Mags Reinstalled, etc.
|
Details
|
|
|
12-14-2022
|
3.50
|
Stuffing, Wrapping & Tying. Season Greetings..!
|
Details
|
|
|
12-12-2022
|
8.50
|
An Inconvenience...
|
Details
|
|
|
12-06-2022
|
4.00
|
More Wire Routing - Getting There...
|
Details
|
|
|
12-04-2022
|
1.30
|
Keyed Switch Added...
|
Details
|
|
|
12-02-2022
|
4.00
|
Hurdle Cleared...
|
Details
|
|
|
12-01-2022
|
1.50
|
8 Gauge Tie-In
|
Details
|
|
|
11-30-2022
|
2.30
|
Tie it Together...
|
Details
|
|
|
11-26-2022
|
3.50
|
Installation of FlyLed's Control Board...
|
|
|
|
11-24-2022
|
11.80
|
It's Not Over - Until It's Over...
|
Details
|
|
|
10-30-2022
|
3.20
|
Installation of VOR Antenna in Right Wing Tip.
|
Details
|
|
|
10-26-2022
|
2.20
|
OAT Probe...
|
Details
|
|
|
10-21-2022
|
4.20
|
Antenna Installation Wrap-Up...
|
Details
|
|
|
10-16-2022
|
6.30
|
Antenna Coaxial Cable Runs & Connections...
|
Details
|
|
|
10-12-2022
|
2.50
|
Mating BNC Connectors to RG400 Coax...
|
Details
|
|
|
10-01-2022
|
5.80
|
GPS Antenna Installation...
|
Details
|
|
|
09-24-2022
|
2.50
|
Loop It...
|
Details
|
|
|
09-22-2022
|
1.80
|
Antenna Mounting & SteinAir Feedback Update...
|
Details
|
|
|
09-21-2022
|
3.50
|
Moving Forward...
|
Details
|
|
|
09-20-2022
|
0.80
|
Too Much of a Good Thing...
|
Details
|
|
|
09-18-2022
|
8.30
|
It's a Wrap. Well, Not Really...
|
Details
|
|
|
09-15-2022
|
6.80
|
67% There...
|
Details
|
|
|
09-07-2022
|
7.50
|
Stuffing Wires - The Battle Continues...
|
Details
|
|
|
09-02-2022
|
11.00
|
Return To Panel Installation...
|
Details
|
|
|
08-22-2022
|
9.50
|
Wiring Continues...
|
Details
|
|
|
08-12-2022
|
2.20
|
Final.., The Navigator is Fitted...
|
Details
|
|
|
08-09-2022
|
2.30
|
Fitting GTN750Xi's Rack...
|
Details
|
|
|
08-06-2022
|
1.30
|
Garmin's GTN750Xi
|
Details
|
|
|
08-05-2022
|
4.50
|
A Fairly Productive Day...
|
Details
|
|
|
08-04-2022
|
4.00
|
More Remote Installations...
|
Details
|
|
|
08-03-2022
|
3.50
|
Plan C...
|
Details
|
|
|
08-02-2022
|
3.80
|
Back From Vacation - The Assembly Continues...
|
Details
|
|
|
07-23-2022
|
5.50
|
It's Sometimes a Slow Road to Progress...
|
Details
|
|
|
07-13-2022
|
5.30
|
IBBS Installation & Re-Fab of Vertical Mount
|
Details
|
|
|
07-11-2022
|
9.20
|
Remote Box Stack w/Hinge Modification
|
Details
|
|
|
07-06-2022
|
4.50
|
The Beatings Will Continue Until Morale Improves..
|
Details
|
|
|
07-05-2022
|
3.70
|
GTX45, GDL51 & GAD29 Remote Box Works...
|
Details
|
|
|
07-04-2022
|
14.70
|
Fabrication Trials & Errors....
|
Details
|
|
|
06-24-2022
|
8.20
|
Glove Box Hinged Panel Mod
|
Details
|
|
|
06-22-2022
|
14.80
|
Remote Avioic Box Layout
|
Details
|
|
|
06-14-2022
|
4.00
|
Begin Instrument Panel Installation
|
Details
|
|
|
04-28-2022
|
3.50
|
Vendor Screws Customer...
|
Details
|
|
|
04-26-2022
|
2.30
|
Install ELT + Components
|
|
|
|
04-23-2022
|
0.50
|
Stein Air Panel Arrives
|
|
|
|
03-30-2022
|
0.00
|
Stein Air Update - See Details...
|
Details
|
|
|
03-25-2019
|
1.75
|
Cut out foam blocks, bend skin tabs, prep spars
|
|
|