KitLog pro

Powered By Kitlog Pro v2.0

Barry's RV14A
Work Logs Found: 57
Category Work Time: 105 Hours
 Date
Hours
Work Log Summary

Details

 01-07-2023
0.80
Trim & Sand Gear Leg Fairings...
Details

 01-06-2023
3.50
Gear Leg Fairings...
Details
       

 01-05-2023
3.00
It's Fairing to Say...
Details
       

 01-04-2023
1.30
Back to the Gear Legs Fairings...
Details
     

 07-17-2020
0.75
Add Epoxy Filler (final coat) to HS Stabilizer Tip
       

 07-16-2020
1.00
Sand & Shape Empennage Fairing
     

 07-15-2020
1.50
Remove Empennage Fairing & Rough Sand

 07-14-2020
3.00
Prep & Epoxy Empennage Fairing w/Filler
     

 07-12-2020
1.50
Install K1000-6 Nutplates in VS & HS for F-01496
       

 07-11-2020
3.50
Fairing Works - See Notes to Right
Details

 07-09-2020
1.75
Final Fitting of F-01496 & Drilling #40 Attach Hol

 07-08-2020
1.75
Sand F-01496 Empennage toward scrib line.

 07-07-2020
0.75
Continue Sanding & Fitting F-01496 Emp. Fairing

 07-06-2020
1.25
Begin Sanding & Fitting F-01496 Emp. Fairing

 06-30-2020
0.75
Rough Trim Empennage Fairing, F-01496

 06-29-2020
1.00
Marking of Empennage Fairing & Hole Patterns

 06-28-2020
2.50
Final Sanding of Fairings - See Notes to Right
Details

 06-25-2020
0.80
More Sanding of Rudder & Elevator Fairings

 06-24-2020
1.00
Sanding of Rudder & Elevator Fairings

 06-23-2020
2.50
Continue Sanding & Filling Rudder & Elevators

 06-22-2020
1.00
Sand & Fill Rudder & Elevators

 06-20-2020
1.25
Lightly Sand & Fill Rudder & Elevators

 06-19-2020
1.50
Fairing Works Continue - See Note to Right
Details

 06-17-2020
1.25
Rough Bend, Left F-14111 Empennage Gap Cover

 06-17-2020
1.00
More Fill Workings on Rudder & Left Elevator

 06-15-2020
2.00
More Fill Workings on Rudder & Left Elevator

 06-14-2020
2.50
More Fill Workings - See Notes to Right
Details

 06-12-2020
10.50
Filler Workings. See Note to Right
Details

 06-05-2020
2.00
Remove Tail Feathers - See Notes to Right
Details

 06-04-2020
1.50
Add Dynalight Filler to L&R Evelators Ends

 06-03-2020
0.50
Right Elevator Front Face Bondo Application

 06-02-2020
0.50
Left Elevator Front Face Bondo Application

 05-28-2020
1.50
Apply Another Layer of Bondo to Sub-Assemblies

 05-18-2020
3.00
Continue Empennage Fairing Work

 05-12-2020
0.75
Began Testing of Dynalight Filler on VS Tip

 05-07-2020
1.25
Began Sanding & Preping VS Top Fairing for Filler

 05-06-2020
1.00
Added Reinforcement Cloth to Interior of VS Tip.
Details

 05-04-2020
1.00
Fairing Works: See Remarks to Right...
Details

 05-03-2020
1.50
Cut, Trim, Drill & Sand VS Fairing. Rough Cut Fill

 05-02-2020
1.50
Interior Cloth Applied to Tips. Laid VS Tip Filler

 05-01-2020
1.25
Set 1st Epoxy Layer for Tips Inserts

 04-30-2020
1.25
Began Triming HS Tip Inserts

 04-28-2020
1.50
Fiberglass Work on Left Elevator Tip Insert
Details

 04-23-2020
2.00
Add 3 More Layers to Left Tip Insert. Right Done.
Details

 03-20-2020
2.50
Install L&R Elevator Tips & Rod End Bearings, x4ea

 03-19-2020
1.00
Epoxy #4 Washers to Elevator Fairings
Details

 03-18-2020
1.00
Match Drill & Countersink Left Elevator Fairing

 03-13-2020
1.00
Match Drill & Dimple for Right Elevator Fairing
     

 03-11-2020
3.00
Began Right Elevator Fairing - See Notes to Right
Details

 03-10-2020
1.25
Completed Rudder Fairings
Details

 03-09-2020
2.25
Fairings Continue - See Notes to Right
Details

 03-08-2020
3.00
Fairings Continue - See Notes to Right
Details

 03-07-2020
4.25
Continue Fairing Work - See Notes to Right
Details

 03-06-2020
1.25
Clean Up & Match Drill #40 Bottom Rudder Fairing

 03-05-2020
2.75
Continue Working Rudder Fairings

 03-04-2020
2.00
Continue Working Rudder Fairings

 03-03-2020
3.25
Began Sect. 12 Rudder Bottom Fairing Work










Copyright © 2001-2024 Matronics. All Rights Reserved.