Powered By Kitlog Pro v2.0
Barry's RV14A
RV14A-QB
Miscellaneous
Work Logs Found:
54
Category Work Time:
174 Hours
Date
Hours
Work Log Summary
Details
10-18-2024
3.00
Registration Numbers Applied...
Details
09-29-2024
1.00
Breakout Force Reset....
Details
09-28-2024
2.80
Nutplates & Paint Prep...
Details
09-11-2024
2.00
Miscellaneous Works...
Details
08-13-2024
1.00
Secured Drains Lines...
Details
08-11-2024
1.50
Static Lines & Rudder Gust Lock....
Details
07-05-2024
0.75
3D Printing of a Switch Mounting Assembly, Part Tw
Details
06-30-2024
2.50
3D Printing of a Switch Mounting Assembly
Details
03-09-2024
1.00
Putzing About...
Details
01-31-2024
1.80
Unwrapped Canopy...
Details
11-11-2023
2.50
Hangar Clean-out & Up...
Details
10-22-2023
10.50
Hangar Lighting Rework...
Details
09-28-2023
2.50
Wing's Third Bay Inward Access Panels...
Details
09-26-2023
3.80
Left Wing Rotisserie Mounts....
Details
09-25-2023
1.50
Rotisserie Height Extension...
Details
09-06-2023
1.30
Wing Rotisserie Complered...
Details
08-31-2023
3.50
Wing Rotisserie - Continued...
08-30-2023
4.00
Rotisserie Stands...
Details
08-05-2023
2.80
Magnetometer's CPC Mounting Bracket...
Details
08-03-2023
5.50
Wing Conduits...
Details
07-30-2023
1.30
Flyled Wing Tip Looms...
Details
07-29-2023
2.80
Primary Alternator Blast Tube installation...
Details
07-28-2023
3.50
It's a Blast...
Details
03-28-2023
1.30
Re-Work Jack Point Fit...
Details
03-23-2023
4.00
Jack Point Upgrade...
Details
02-10-2023
5.00
Transport & Setup of Tooling, etc. to/at Hangar
Details
02-02-2023
3.50
After 4 Years, She Has Found Her Way Home...
Details
01-31-2023
3.50
Moving Day Arriving Soon...
Details
01-18-2023
3.50
Prepping for the Move...
Details
01-18-2023
40.00
Moving to KAKR...
Details
03-24-2022
4.00
Moved Tail Feathers, etc. to Hangar - KAKR
02-13-2022
2.75
Cleanup Up & Miscellaneous Task
01-25-2022
3.00
Assembly of 1 Ton Engine Hoist
12-10-2021
2.50
Moving Day... See Notes to Right
Details
09-16-2021
6.50
Build Jack Stands
08-17-2021
0.50
Cut Slats & Support Sheets for Forward Flooring
03-08-2021
0.25
Modify Countersink Mirco Stop
02-27-2021
2.50
Shortened Wing Cart to Ease Wing Tip Work
02-21-2021
1.00
Modify Spad Extention Bit for Snap Bushing Use
01-30-2021
0.75
Fabricate Pitot & AOA Tubing Standoff Prototype
01-30-2021
2.00
Cleaned & Organized Work Space
11-01-2020
2.00
Deburr, Polish, Dimple & Rivet Flap Motor Box
Details
08-24-2020
2.00
Prep Flooring Panels for Primer & Fininsh Paint
08-19-2020
1.50
Finish Deburring & Polishing Flooring Panels
08-18-2020
1.50
Continue Deburring & Polishing Flooring Panels
08-12-2020
1.50
Begin Deburring & Polishing Floor Components
07-22-2020
1.50
Begin Assy. of EZ Out Glove Box
07-17-2020
1.75
Remove HS & VS Tail Fethers. Reposition Fuselage
05-29-2020
1.25
Deburr & Polish Flap Motor Cover Box
09-01-2019
1.75
Build Fuselage Flooring
08-31-2019
4.00
Build & Install Fuselage Supports
06-24-2019
3.00
Build Fuselage Platform
02-08-2019
1.50
Finish Tabletop Modification. Sand top smooth.
02-07-2019
1.00
Modify Tabletop for Aluminum Angle
SITE NAVIGATION
Contact Builder
RV14A-QB Home
Category
# Logs
# Hours
All
1116
2500
Avionics
74
312
Brake System
27
53
Canopy & Window
86
148
Control Sticks
9
27
Controls
9
27
Cowling
77
118
Electrical
11
24
Elevators
58
112
Empennage
11
33
Engine
40
65
Exhaust System
8
17
Fairings
57
105
Finishing Kit
42
87
Firewall Forward
33
81
Flap System
13
30
Flight Controls
23
64
Fuel System
7
12
Fuselage
133
269
Gear Assembly
19
49
Horizontal Stab.
21
45
Ignition System
3
5
Interior
10
19
Inventory
4
11
Lighting
26
56
Miscellaneous
54
174
Note(s)
6
Oil Cooler Assy.
4
7
Phase Inspection
3
6
Prime/Paint
29
53
Propeller
21
39
Protection Devices
1
4
Research
2
3
Rudder
27
47
Service Bulletin
1
3
Tools
1
2
Trim & Trim Tabs
1
2
Vent
8
16
Vertical Stabilizer
7
14
Wheel Pants
28
90
Wings
122
271
Copyright © 2001-2024 Matronics. All Rights Reserved.