Date
|
Hours
|
Work Log Summary
|
Details
|
04-21-2022
|
2.30
|
Installed Steps...
|
Details
|
|
|
07-28-2020
|
0.50
|
Install Two Missed Rivets in Baggage Floor
|
|
|
|
12-22-2019
|
0.50
|
Re-Position Seatback Braces
|
|
|
|
12-17-2019
|
1.25
|
Fabricate Seat Hinge Pins & Install
|
|
|
|
12-17-2019
|
2.25
|
Complete Riveting of Seat Back Assemblies
|
|
|
|
12-16-2019
|
1.50
|
Prime & Rivet Hinges to F-01437 Seat Braces
|
|
|
|
12-16-2019
|
2.00
|
Match Drill #12 Seat Angles, Deburr & Reassemble
|
|
|
|
12-16-2019
|
0.75
|
Begin Final Riviting of Seat Back Assemblies
|
|
|
|
12-15-2019
|
4.00
|
Continue Seat Works - See Notes to Right.
|
Details
|
|
|
12-14-2019
|
3.50
|
Continue w/ Seat Back Workings
|
Details
|
|
|
12-13-2019
|
2.00
|
Sect.37 C/W - Rivet F-14125 L&R to Fuselage
|
|
|
|
12-13-2019
|
2.50
|
Seat Back Assemblies Prep
|
|
|
|
12-12-2019
|
0.50
|
Final Riveting of Rollover Bar Assembly
|
|
|
|
12-12-2019
|
0.75
|
Begin Side Stiffeners Attachment
|
|
|
|
12-11-2019
|
3.50
|
Continue Attachment of Rollover Bar to Fuselage
|
|
|
|
12-10-2019
|
2.50
|
Begin Attachment of Rollover Bar to Fuselage
|
|
|
|
12-09-2019
|
2.25
|
Rollover Structure Assy. - See Notes to Right.
|
Details
|
|
|
12-05-2019
|
1.00
|
Match Drill Rollover Bar's Forward Mount Holes
|
|
|
|
12-02-2019
|
4.00
|
Final Assy. & Riviting of Rollover Bar
|
|
|
|
12-01-2019
|
1.00
|
Prime Inside of Rollover Bars. Prep for Riveting
|
|
|
|
12-01-2019
|
3.00
|
Countersink Fwd Bar, Outer Strap & Window Shims
|
|
|
|
11-29-2019
|
2.00
|
Match Drill Rollover Assy., Aft Side
|
|
|
|
11-29-2019
|
1.25
|
Deburr Rollover Assy.
|
|
|
|
11-28-2019
|
0.50
|
Separate & Debur & Polish C-01433, 4ea
|
|
|
|
11-27-2019
|
0.75
|
Separate & Debur& Polish C-01432, 4ea
|
|
|
|
11-27-2019
|
1.50
|
Match Drill Rollover Assy., Forward Side, Outboard
|
|
|
|
11-26-2019
|
1.75
|
Match Drill Rollover Assy., Aft Side, Outboard
|
|
|
|
11-25-2019
|
0.75
|
Prep Forward Rollover Structure for Riveting
|
|
|
|
11-25-2019
|
2.50
|
Assemble Rollover Structure for Match Drilling
|
|
|
|
11-21-2019
|
1.25
|
Paint Wiring Channel & Power Module Assembles
|
|
|
|
11-16-2019
|
0.75
|
Prime Wiring Channel & Power Module Assembles
|
|
|
|
11-16-2019
|
0.75
|
Install Nutplates to Wiring Channel Assembly
|
|
|
|
11-16-2019
|
2.50
|
Debur, Polish & Dimple Wiring Channel Assy.
|
|
|
|
11-16-2019
|
2.50
|
Debur, Dimple & Assemble Power Module Assembly
|
|
|
|
11-15-2019
|
1.00
|
Tighten & Torque Flap Control Assembly Bolts
|
|
|
|
11-15-2019
|
0.75
|
Safety Wire & Torque Seal Flap Control Assy.
|
|
|
|
11-15-2019
|
2.50
|
Install Flap Control Motor Assy.
|
|
|
|
11-14-2019
|
0.75
|
Install Flap Crank to Flap Torque Arms
|
|
|
|
11-14-2019
|
1.00
|
Align & Drill Right Flap Control Arm Assembly
|
|
|
|
11-13-2019
|
1.50
|
Align & Drill Left Flap Control Arm Assembly
|
|
|
|
11-12-2019
|
3.50
|
Install Rudder Cables Through Wing Spar & Tunnel
|
Details
|
|
|
10-31-2019
|
1.00
|
Finish Deburring Roll-Over Structure
|
|
|
|
10-30-2019
|
3.00
|
Continue Deburring Roll-Over Structure
|
|
|
|
10-26-2019
|
0.50
|
Prime & Paint (2nd coat) Air Vent Components
|
|
|
|
10-23-2019
|
1.25
|
Prime & Paint (1st coat) Air Vent Components
|
|
|
|
10-22-2019
|
1.75
|
Prep Vent Assemblies for Painting
|
|
|
|
10-17-2019
|
2.50
|
Begin Deburring Roll-Over Structure
|
|
|
|
10-11-2019
|
0.75
|
Finished Riveting Baggage Area Side Skins Panels
|
|
|
|
10-10-2019
|
1.75
|
Deburr Baggage Area Side Skins
|
|
|
|
10-10-2019
|
1.50
|
Complete the Installation of Flap Motor Channel
|
|
|
|
10-10-2019
|
2.00
|
Begin Installation of Left Baggage Area Side Skins
|
|
|
|
10-09-2019
|
2.00
|
Begin Installation of Flap Motor Channel
|
|
|
|
10-08-2019
|
3.75
|
Rivet Baggage Floor Panel Nutplates
|
|
|
|
10-07-2019
|
5.00
|
Prep & Blind Rivet Left Baggage Floor Panel
|
|
|
|
10-06-2019
|
6.50
|
Prep & Blind Rivet Right Baggage Floor Panel
|
|
|
|
10-05-2019
|
2.00
|
Complete the Mating of the Fuselage Sections
|
|
|
|
10-02-2019
|
3.00
|
Continue With the Mating of the Fuselage Sections
|
|
|
|
09-24-2019
|
2.50
|
Continue Riveting Fuselage Sections Together
|
Details
|
|
|
09-22-2019
|
1.50
|
Prep & Rivet Flap Motor Channel
|
|
|
|
09-21-2019
|
1.50
|
Prep & Countersink Baggage Floor Splice
|
|
|
|
09-19-2019
|
2.00
|
Continue Riveting Fuselage Sections Together
|
Details
|
|
|
09-18-2019
|
3.00
|
Riveting of Forward & Aft Fuselages
|
|
|
|
09-17-2019
|
2.50
|
Dimple Baggage Floor Panels, Install Nutplates
|
|
|
|
09-16-2019
|
1.75
|
Debur Baggage Floor Panels. Mark for Dimpling
|
|
|
|
09-15-2019
|
2.50
|
Fabricate Seatback Hinges
|
|
|
|
09-13-2019
|
2.50
|
Fabricate Flap Bushings
|
|
|
|
09-09-2019
|
1.75
|
Prep SV-10 Fresh Air Vents
|
|
|
|
09-03-2019
|
2.50
|
Begin Riveting to Aft to Forward Fuselages
|
Details
|
|
|
09-02-2019
|
1.75
|
Final Riveting of Lug Assemblies to Fuselage
|
|
|
|
08-29-2019
|
1.75
|
Assembly of Shoulder Harness Lugs
|
|
|
|
08-28-2019
|
1.00
|
Straighten Forward Bulkheads for Assembly
|
|
|
|
08-28-2019
|
4.00
|
Married & Clecoed Forward & Aft Fuselage
|
|
|
|
08-28-2019
|
2.00
|
Install Forward Bulkhead Assembly
|
|
|
|
08-26-2019
|
3.50
|
Begin Assembly of Forward Bulkhead, Deburr & Dimpl
|
|
|
|
08-25-2019
|
1.75
|
Install U-01402 Lower Gear Braces
|
|
|
|
08-24-2019
|
0.50
|
Install Brass Elbows to U-01402 Lower Gear Braces
|
|
|
|
08-20-2019
|
1.25
|
Enlarge Holes in Floor, Begin Gear Leg Cutouts
|
|
|
|
08-16-2019
|
1.50
|
Review plans for QB completion of required steps
|
|
|
|
07-02-2019
|
2.50
|
Rivet Top Center Skin Assembly to Fuselage
|
|
|
|
07-02-2019
|
0.50
|
Complete Fuselage
|
|
|
|
06-26-2019
|
2.00
|
Rivet Left Top Skin to Fuselage
|
|
|
|
06-25-2019
|
0.50
|
Cleco Top Plate to Fuselage
|
|
|
|
06-18-2019
|
2.00
|
Rivet Top Right Skin to Fuselage
|
|
|
|
06-15-2019
|
1.50
|
Secure Wiring Harness, Remove 2 Nutplate Rivets
|
|
|
|
06-14-2019
|
1.25
|
Install Remaining Aft Fuselage Rivets
|
|
|
|
06-13-2019
|
1.00
|
Fit Skins
|
|
|
|
06-13-2019
|
1.50
|
Deburr, File & Smooth Edges to Left Top Skin
|
|
|
|
06-13-2019
|
1.25
|
Break Edges & Dimple Left Top Skin
|
|
|
|
06-12-2019
|
2.00
|
Break Edges & Dimple Right Top Skin
|
|
|
|
06-11-2019
|
1.50
|
Deburr, File & Smooth Edges to Right Top Skin
|
|
|
|
06-10-2019
|
3.00
|
Deburr, Break & Assemble Center Top Plate Skin
|
|
|
|
06-08-2019
|
1.50
|
Completed Top Plate Installation
|
|
|
|
06-05-2019
|
2.00
|
Riveting Top Plate to Fuselage
|
Details
|
|
|
06-03-2019
|
1.50
|
Installed Comm & ELT cablels
|
|
|
|
06-01-2019
|
1.50
|
Completed Installation of Static System
|
|
|
|
05-31-2019
|
0.75
|
Begin Installation of Static System
|
|
|
|
05-29-2019
|
1.50
|
Install Rudder Cable & Guides
|
|
|
|
05-28-2019
|
1.50
|
Attach F-01473A Stiffeners & Right Rudder Stop
|
|
|
|
05-27-2019
|
2.00
|
Finished Riveting Tail Cone Side Skins to Skeleton
|
|
|
|
05-24-2019
|
0.50
|
Continue Riveting Tail Cone Side Skins to Skeleton
|
|
|
|
05-23-2019
|
3.50
|
Continue Riveting Tail Cone Side Skins to Skeleton
|
|
|
|
05-22-2019
|
3.50
|
Continue Riveting Tail Cone Side Skins to Skeleton
|
|
|
|
05-21-2019
|
1.50
|
Continue Riveting Tail Cone Side Skins to Skeleton
|
|
|
|
05-20-2019
|
4.00
|
Continue Riveting Tail Cone Side Skins to Skeleton
|
|
|
|
05-16-2019
|
1.25
|
Continue Riveting Tail Cone Assembly
|
|
|
|
05-15-2019
|
2.00
|
Continue Riveting Tail Cone Assembly
|
|
|
|
05-14-2019
|
4.00
|
Continue Riveting Tail Cone Assembly
|
|
|
|
05-13-2019
|
1.50
|
Clecoed Tail Cone & Began Riveting
|
|
|
|
05-11-2019
|
2.50
|
Cleco on Left & Right Side Skins
|
|
|
|
05-10-2019
|
2.00
|
Countersink Longerons for #6 Screws
|
Details
|
|
|
05-05-2019
|
5.00
|
Rivet Bulkheads & Lower Aft Fuselage Skin
|
|
|
|
05-04-2019
|
2.50
|
Install Wiring Harness in Fuselage Skeleton
|
|
|
|
05-03-2019
|
2.50
|
Complete Dimpling of Side Skins
|
|
|
|
05-03-2019
|
1.00
|
Beginning Assembly of Tailcone Skeleton
|
|
|
|
05-02-2019
|
1.50
|
Complete Countersinking Longerons
|
|
|
|
05-01-2019
|
2.25
|
Begin Countersinking Longerons
|
|
|
|
04-30-2019
|
2.00
|
Complete Riveting of Bottom Skin. Prep Side Skins
|
|
|
|
04-30-2019
|
1.50
|
Begin Dimpling of Side Skins
|
Details
|
|
|
04-29-2019
|
4.50
|
Rivet Bottom Skin to Skeleton
|
|
|
|
04-28-2019
|
4.50
|
Dimple F-01478 Skin. Celco on Bulkheads & Stiffene
|
Details
|
|
|
04-27-2019
|
2.50
|
Complete Battery Angle & Bulkhead Assembly, F-0140
|
|
|
|
04-26-2019
|
1.50
|
Countersink Battery Angles, Prime. Attach Nutplate
|
|
|
|
04-26-2019
|
1.00
|
Assembly& Rivet F-01407 & F-01408 Bulkheads
|
|
|
|
04-25-2019
|
2.50
|
Deburring of F-01407 & F-01408 Bulkheads
|
|
|
|
04-25-2019
|
2.30
|
Complete Assembly of F-01410 Bulkhead
|
|
|
|
04-24-2019
|
1.50
|
Completed Assembly of F-01411 Bulkhead
|
|
|
|
04-24-2019
|
2.00
|
Begin Assembly of F-01410 Bulkhead, Deburring
|
|
|
|
04-23-2019
|
1.00
|
Begin Assembly of F-01411 Bulkhead
|
|
|
|
04-22-2019
|
1.00
|
Prep F-01412 Bulkhead for Assembly
|
|
|
|
04-22-2019
|
1.50
|
Finish F-01412 Bulkhead
|
|
|
|
04-21-2019
|
6.50
|
Fabricate Rudder Stop & HS Attachment Bar
|
|
|
|
04-21-2019
|
2.50
|
Deburring, Sanding & Buffing
|
|
|
|
04-20-2019
|
4.50
|
Begin Assembly of Tail Cone, Deburring, etc.
|
|
|