Powered By Kitlog Pro v2.0
Rays Web Site
RV-9A
Fuselage
Work Logs Found:
20
Category Work Time:
129 Hours
Date
Hours
Work Log Summary
Details
01-12-2008
5.00
Riveted the Aft Fuselage Left Skin
Details
01-05-2008
3.00
Riveted the Right Aft Side skin.
Details
01-03-2008
4.00
Riveted the bottom of the Aft Fuselage.
Details
01-02-2008
9.00
Started the Riveting, Made some more of the small
Details
01-01-2008
10.00
Finished the Dimpling, Priming of Aft Fuse
Details
12-31-2007
11.00
Built a foot valve for the Pneumatic Dimpler and D
Details
12-29-2007
3.00
Riveted BellCrank, Made Spacers etc. Matched Drill
Details
12-28-2007
9.00
Assembled and drilled the Aft Fuselage section.
Details
12-27-2007
4.00
First Assy of the "Canoe"
Details
12-27-2007
3.00
Assembled F-711 and F-712
Details
12-26-2007
10.00
Built the various parts for the Bulkheads
Details
12-25-2007
8.00
Assembled F-705 Bulkhead
Details
12-24-2007
6.00
F-705 Assy Prep
Details
12-19-2007
4.00
F-904 Assembly
Details
12-17-2007
8.00
Finished deburring and preping then Primed Parts
Details
12-15-2007
7.00
More deburring and straightening
Details
12-14-2007
6.00
Deburring Parts
Details
12-14-2007
2.00
Assembled the firewall
Details
12-13-2007
8.00
Started assembly of Firewall
Details
10-12-2005
9.00
Received Fuselage and Inventoried
SITE NAVIGATION
RV-9A Home
Category
# Logs
# Hours
All
122
624
Empennage
17
132
Engine
2
3
Fuselage
20
129
Miscellaneous
7
14
Shop Supplies
2
21
Tools
2
7
Wings
72
318
Copyright © 2001-2024 Matronics. All Rights Reserved.