KitLog pro

Powered By Kitlog Pro v2.0

Rays Web Site
Work Logs Found: 72
Category Work Time: 318 Hours
 Date
Hours
Work Log Summary

Details

 12-11-2007
0.00
More Wing Pics
Details
       

 12-11-2007
7.00
Finished assembly of Aileron Controls
Details
       

 12-07-2007
0.10
First Test of Fuel Tank... A CAT Scan.
Details
     

 12-07-2007
7.00
Assembled and Sealed the Left Fuel tank.
Details
       

 12-06-2007
4.00
Assembled and sealed the Fuel Tank Access Covers
Details
       

 01-12-2007
3.50
Left Flap bottom skin & Trailing Edge Riveting don
Details
       

 01-12-2007
4.00
Assembled Right Flap
Details
       

 01-11-2007
2.50
Riveted the Left Flap Bottom Skin to Fwd Spar
Details
       

 01-10-2007
2.00
Started Right Flap Nose and top skin riveting.
Details
       

 01-09-2007
4.00
Riveted nose and top skins to Right Flap
Details
       

 01-09-2007
3.00
Finished Riveting Both Flap skeletons
Details
     

 01-06-2007
5.00
Dimpled the right flap and primed L&R flap skins/A
Details
       

 01-05-2007
5.00
Right Flap Assy First Assy & Match Drilling
Details
       

 01-05-2007
2.00
Deburred the Right Spar and Ribs Using new Tool.
Details
     

 01-03-2007
2.00
Assembling the Left Flap Skeleton.
Details
       

 01-02-2007
4.00
Assembled Left Flap Leading Edge rib/Hinge Assys
Details
       

 01-01-2007
3.00
Deburred and dimpled Left Flap skins
Details
       

 12-30-2006
6.00
Deburr, & Dimple the Left Flap Assy
Details
       

 12-30-2006
1.00
Countersunk Left Flap Spar
     

 12-29-2006
4.00
Fit Assembled and Match drilled Left Flap
Details
       

 12-29-2006
3.00
Designed and constructed the Flap assembly Jig and
Details
       

 12-28-2006
3.00
Fabricated the Flap angle brackets and ifitted the
Details
     

 12-27-2006
2.00
Install Ailerons to Wings
Details
       

 12-26-2006
2.00
Riveted Gap Seals on the Right wing.
Details
     

 12-26-2006
2.00
Built/Installed Right Outbd Aileron Hinge Assy
Details
     

 12-13-2006
1.00
Riveted the Left Wing Gap Seals
Details
     

 12-13-2006
2.00
Drill, Deburr and Dimple Gap Seals
Details
       

 12-11-2006
2.00
Drill the Flap hinge assy to bottom skin holes.
Details
       

 12-11-2006
2.00
Countersunk bracketts, Riveted assy to wing.
Details
       

 12-06-2006
2.00
Removed the Wing Fixture and cleaned up the area.
Details
       

 12-06-2006
4.00
Installed the Flap Hinges on the wings
Details
       

 12-05-2006
3.00
More Aileron Work
Details
       

 12-05-2006
1.00
Finished up the ailerons!
Details
       

 12-04-2006
2.00
Riveting R Aileron Skins
Details
       

 12-04-2006
3.00
Closing Up Right Aileron
Details
       

 12-02-2006
10.00
Ailerons
Details
       

 11-23-2006
1.00
Rivet Aileron Stiffeners
Details
     

 11-16-2006
4.00
Primed ailerons and flaps.
Details
       

 11-13-2006
6.00
Preped, drilled & Dimpled the Ailerons and flaps
Details

 03-15-2006
5.00
Started aileron assembly, drilled and de-burred bo
       

 03-15-2006
4.00
Preped alerons and flaps, removed blue plastic and
       

 03-09-2006
5.00
Right wing tank Phase II
Details
       

 03-08-2006
7.00
Riveted Right Top Wing Skin
Details
       

 03-08-2006
3.00
Finished up inserting and taping rivets on Rt top
     

 03-07-2006
3.00
Prepared Right Wing skeleton for leading edge
Details
       

 03-07-2006
5.00
Attached Right Wing Top skin, inserted rivets and
Details
       

 03-07-2006
4.00
Attached Right Wing outboard Leading Edge to Skele
Details
       

 03-04-2006
7.00
Right Wing Prep, Primed Skins & Ribs

 03-04-2006
3.00
Assembled Right Wing Leading edge
Details

 03-01-2006
7.00
Right Wing prep

 09-05-2005
6.00
Right Wing Prep and assembly

 07-28-2005
9.00
Sealing Tanks Phase 1
Details

 07-05-2005
8.00
Fitting Right Wing Leading Edge

 06-30-2005
7.00
Fit Right Wing skins

 06-29-2005
9.00
Assemble Right wing skeleton

 06-18-2005
4.00
Riveted Left Wing Top Skins

 06-09-2005
11.00
Left wing skin prep & riveting

 05-12-2005
6.00
Construct Roll-around wing stand

 02-09-2005
5.00
Drilling Left Tank Assy

 02-08-2005
5.00
Drill Left tank Assy

 01-24-2005
9.00
Fuel Tank assembly Left Wing

 01-06-2005
9.00
Leading Edge Assy, Construct Cradle

 01-06-2005
3.00
Continue fitting stringers

 12-30-2004
2.00
Fitting Span-wise Stringers

 12-29-2004
4.00
Fit Left wing skins
       

 12-28-2004
4.00
Assemble Left wing skeleton
     

 12-27-2004
5.00
PrepLeft wing ribs
     

 12-27-2004
0.50
Construct Aileron alignment tool

 12-25-2004
12.00
Assemble rear wing spars
       

 12-24-2004
8.00
ID wing spars, Attach Tank attach Platenuts to Spa
       

 12-23-2004
7.00
Built Wing assembly fixture
       

 10-14-2004
7.00
Wings arrived and Inventoried










Copyright © 2001-2024 Matronics. All Rights Reserved.