Rays Web Site
RV-9A
Empennage
Work Logs Found:
17
Category Work Time:
132 Hours
Date
Hours
Work Log Summary
Details
10-28-2004
6.00
Finish Elevators
10-27-2004
10.00
Fit Right Elevator to Horz Stab, assemble Left Ele
10-14-2004
7.00
Build trim Tab
09-06-2004
12.00
Building the Right elevator
08-17-2004
5.00
Complete Rudder Assembly
08-14-2004
9.00
Rudder assembly, Trailing edge riveting.
Details
08-13-2004
7.00
Rudder counterweight installation & riveting
08-11-2004
8.00
Rudder Assembly
08-11-2004
8.00
Finish Vert Stab assy.
Details
08-07-2004
8.00
Deburr, Dimple, Prime Vert Stab
08-06-2004
3.00
Drill Rib to Spar attach Holes
08-05-2004
9.00
Drilling Vert Stab
08-04-2004
7.00
Assemble Horizontal Stab
08-03-2004
8.00
Assemble Horizontal Stab
08-02-2004
7.00
Prep and prime Horizontal Stab Parts
07-30-2004
9.00
Prep, Match Drill, Dimple and assemble Horizontal
07-10-2004
9.00
Assemble the Horizontal Stabilizer Skeleton
SITE NAVIGATION
RV-9A Home
Category
# Logs
# Hours
All
122
624
Empennage
17
132
Engine
2
3
Fuselage
20
129
Miscellaneous
7
14
Shop Supplies
2
21
Tools
2
7
Wings
72
318
Copyright © 2001-2024 Matronics. All Rights Reserved.