Work Logs Found: 104
Category Work Time: 238 Hours
 Date
Hours
Work Log Summary

Details

 10-31-2021
1.00
first engine run
Details

 10-25-2021
2.00
cables checked

 05-01-2021
2.00
naca cowl

 08-29-2020
0.50
baggage cover

 07-01-2020
2.50
canopy skirts

 03-10-2020
1.00
fuselage pins

 02-28-2020
2.00
canopy

 10-18-2019
3.00
fuel tank vent

 08-31-2019
4.00
misc covers

 08-30-2019
1.00
lap belts

 08-25-2019
4.00
rudder cables

 05-30-2019
2.50
flap handel

 05-29-2019
1.00
BRAKE RESERVOIR

 05-17-2019
3.00
FUSUELAGE COVER ASSY

 05-14-2019
2.00
CANOPY LATCH/WIRES

 05-06-2019
2.50
TAILCONE ROUTING HARNESS

 05-05-2019
1.50
PITCH SERVO WIRING

 04-28-2019
2.00
CONNECTORS FUSUELAGE

 04-19-2019
1.50
HEADSET JACKS

 04-03-2019
2.00
power outlet

 03-31-2019
2.00
options wiring harness

 03-30-2019
1.50
oat

 03-29-2019
2.00
control ptt wiring

 03-24-2019
1.00
wiring harness

 03-22-2019
2.00
wiring harness

 03-21-2019
1.50
wiring harness

 03-20-2019
3.00


 03-17-2019
1.50
wiring

 03-15-2019
2.00
route antenna cables

 03-10-2019
2.00
bellcrank assembly

 01-05-2019
3.00
SERVOS INSTALLED

 12-28-2018
1.00
sb 13-04-05
Details

 12-18-2018
9.00
upper fusuelage
     

 12-11-2018
4.00
fuel system
     

 12-09-2018
5.00
rudder pedals and brake pedals
     

 12-01-2018
0.50
install seatbacks
     

 11-30-2018
6.00
seat backs

 11-27-2018
10.90
rollover strucrure/f-1207 bulkhead
     

 11-23-2018
13.00
side skins
     

 06-06-2014
1.00
Install flow-scan mount bracket
     

 06-06-2014
1.50
Construct gasolator bracket

 06-05-2014
2.00
Firewall shelf
       

 05-03-2014
1.00
Demo building at Manassas airshow
     

 04-19-2014
3.50
Lower firewall nutplates & cooler stiffener
       

 04-17-2014
3.50
Lower skins to tunnel assembly
       

 04-15-2014
0.75
Install engine mount brackets to tunner ribs
     

 04-12-2014
1.00
Install tunnel assembly nutplates

 04-10-2014
2.50
Prep for tunnel assembly nutplates

 04-09-2014
1.00
Install block studs. Mid fuselage complete
       

 04-07-2014
1.50
Install facet pump bracket

 04-03-2014
2.50
Install cockpit rear bulkhead & AP brackets
     

 03-31-2014
1.50
Install step floors
     

 03-27-2014
1.00
Attach nutplates to step floors

 03-26-2014
3.00
Install fwd bulkhead and step attach angles
       

 03-19-2014
2.00
Prep nutplate bracket & match drill step attach an
     

 03-18-2014
1.00
Prep step attach angles & nutplate bracket

 03-14-2014
2.00
Finish riveting fuselage bottom skin

 03-13-2014
1.50
Start riveting fuselage bottom
     

 03-12-2014
1.00
Cleco bottom stiffeners

 03-11-2014
2.00
Cockpit bottom skin: Install nutplates, cleco to f
       

 03-09-2014
1.50
Prepare bottom skin

 03-09-2014
2.00
Install bottom fuselage corner skins
       

 03-07-2014
3.00
Attach fwd bulkhead, insert snap bushings, prep co

 03-06-2014
3.00
Install control column & step ribs to fwd bulkhead
       

 03-05-2014
1.50
Nutplates to seat ramp floors

 03-04-2014
2.50
Install fwd bulkhead assembly and seat ramp floors
       

 03-02-2014
2.20
Fwd bulkhead nutplates and prep doublers

 03-01-2014
3.00
Doubler & control column assembly to fwd bulkhead

 02-28-2014
3.00
Fwd bulkhead assembly prep & stub spar recepticles

 02-25-2014
1.50
Install left and right bulkhead cap and roller

 02-21-2014
3.00
Left seat floor assembly to bulkhead & prime parts
     

 02-20-2014
1.00
Finish rt seat floor assembly & rivet to bulkhead

 02-18-2014
1.50
Complete lft seat floor assembly, start rt seat fl

 02-17-2014
2.50
Left seat floor assembly
     

 02-04-2014
2.00
Re-build seat back hinges & match drill to seat fl

 02-03-2014
1.00
Rt seat crotch strap brackets install

 02-02-2014
1.00
Right seat rib assembly
     

 01-31-2014
2.00
A/P seat rib doubler prep

 01-29-2014
1.50
Prep bulkhd flange & spar receptical support

 01-23-2014
2.50
Seatback hinge & seat floor support construct
     

 01-10-2014
1.00
Prep crotch strap brackets

 01-08-2014
0.50
Flaperon mixer to Rt Seat Rib

 01-06-2014
1.00
Seat rib assemblies

 12-31-2013
3.50
Seat ribs preparation

 12-30-2013
3.50
Flaperon mixer arm & seatbelt rib attachments
     

 12-29-2013
2.50
Baggage brackets & flaperon mixer
       

 12-28-2013
1.50
Baggage nutplates & bearing brackets

 12-27-2013
3.50
Attach baggage bulkhead aft ribs

 12-26-2013
1.50
Baggage bulkhead parts prep

 12-26-2013
0.50
Attach bag bulkhead to ribs
     

 12-24-2013
1.00
Prep baggage ribs

 12-23-2013
2.50
Blind rivet in bag floor nutplate, prep bag floor
       

 12-22-2013
3.00
Baggage floor nutplates & start bulkhead assembly
Details
     

 12-14-2013
1.50
Buck in last 3 baggage floor rivets in each end
       

 10-07-2013
3.50
Rivet baggage floor ribs
     

 10-02-2013
1.00
Mitch assist in bag floor solid rivets in tight sp
       

 08-18-2013
2.00
Rivet bulkhead assembly
     

 08-11-2013
2.00
Prime bulkhead assembly
     

 07-07-2013
3.00
Countersink Ctr Section & prep Ctr Sect flanges
     

 07-05-2013
1.50
Finish match drill 73 holes in center section
     

 07-04-2013
3.50
Start match drill 73 holes in center section
       

 06-17-2013
2.00
Center section preparation

 06-16-2013
2.00
Counter sink & install nutplates on Center Section
     

 05-25-2013
1.00
Fuselage kit arrives
       