Work Logs Found:
104
Category Work Time:
238 Hours
Date
Hours
Work Log Summary
Details
10-31-2021
1.00
first engine run
Details
10-25-2021
2.00
cables checked
05-01-2021
2.00
naca cowl
08-29-2020
0.50
baggage cover
07-01-2020
2.50
canopy skirts
03-10-2020
1.00
fuselage pins
02-28-2020
2.00
canopy
10-18-2019
3.00
fuel tank vent
08-31-2019
4.00
misc covers
08-30-2019
1.00
lap belts
08-25-2019
4.00
rudder cables
05-30-2019
2.50
flap handel
05-29-2019
1.00
BRAKE RESERVOIR
05-17-2019
3.00
FUSUELAGE COVER ASSY
05-14-2019
2.00
CANOPY LATCH/WIRES
05-06-2019
2.50
TAILCONE ROUTING HARNESS
05-05-2019
1.50
PITCH SERVO WIRING
04-28-2019
2.00
CONNECTORS FUSUELAGE
04-19-2019
1.50
HEADSET JACKS
04-03-2019
2.00
power outlet
03-31-2019
2.00
options wiring harness
03-30-2019
1.50
oat
03-29-2019
2.00
control ptt wiring
03-24-2019
1.00
wiring harness
03-22-2019
2.00
wiring harness
03-21-2019
1.50
wiring harness
03-20-2019
3.00
03-17-2019
1.50
wiring
03-15-2019
2.00
route antenna cables
03-10-2019
2.00
bellcrank assembly
01-05-2019
3.00
SERVOS INSTALLED
12-28-2018
1.00
sb 13-04-05
Details
12-18-2018
9.00
upper fusuelage
12-11-2018
4.00
fuel system
12-09-2018
5.00
rudder pedals and brake pedals
12-01-2018
0.50
install seatbacks
11-30-2018
6.00
seat backs
11-27-2018
10.90
rollover strucrure/f-1207 bulkhead
11-23-2018
13.00
side skins
06-06-2014
1.00
Install flow-scan mount bracket
06-06-2014
1.50
Construct gasolator bracket
06-05-2014
2.00
Firewall shelf
05-03-2014
1.00
Demo building at Manassas airshow
04-19-2014
3.50
Lower firewall nutplates & cooler stiffener
04-17-2014
3.50
Lower skins to tunnel assembly
04-15-2014
0.75
Install engine mount brackets to tunner ribs
04-12-2014
1.00
Install tunnel assembly nutplates
04-10-2014
2.50
Prep for tunnel assembly nutplates
04-09-2014
1.00
Install block studs. Mid fuselage complete
04-07-2014
1.50
Install facet pump bracket
04-03-2014
2.50
Install cockpit rear bulkhead & AP brackets
03-31-2014
1.50
Install step floors
03-27-2014
1.00
Attach nutplates to step floors
03-26-2014
3.00
Install fwd bulkhead and step attach angles
03-19-2014
2.00
Prep nutplate bracket & match drill step attach an
03-18-2014
1.00
Prep step attach angles & nutplate bracket
03-14-2014
2.00
Finish riveting fuselage bottom skin
03-13-2014
1.50
Start riveting fuselage bottom
03-12-2014
1.00
Cleco bottom stiffeners
03-11-2014
2.00
Cockpit bottom skin: Install nutplates, cleco to f
03-09-2014
1.50
Prepare bottom skin
03-09-2014
2.00
Install bottom fuselage corner skins
03-07-2014
3.00
Attach fwd bulkhead, insert snap bushings, prep co
03-06-2014
3.00
Install control column & step ribs to fwd bulkhead
03-05-2014
1.50
Nutplates to seat ramp floors
03-04-2014
2.50
Install fwd bulkhead assembly and seat ramp floors
03-02-2014
2.20
Fwd bulkhead nutplates and prep doublers
03-01-2014
3.00
Doubler & control column assembly to fwd bulkhead
02-28-2014
3.00
Fwd bulkhead assembly prep & stub spar recepticles
02-25-2014
1.50
Install left and right bulkhead cap and roller
02-21-2014
3.00
Left seat floor assembly to bulkhead & prime parts
02-20-2014
1.00
Finish rt seat floor assembly & rivet to bulkhead
02-18-2014
1.50
Complete lft seat floor assembly, start rt seat fl
02-17-2014
2.50
Left seat floor assembly
02-04-2014
2.00
Re-build seat back hinges & match drill to seat fl
02-03-2014
1.00
Rt seat crotch strap brackets install
02-02-2014
1.00
Right seat rib assembly
01-31-2014
2.00
A/P seat rib doubler prep
01-29-2014
1.50
Prep bulkhd flange & spar receptical support
01-23-2014
2.50
Seatback hinge & seat floor support construct
01-10-2014
1.00
Prep crotch strap brackets
01-08-2014
0.50
Flaperon mixer to Rt Seat Rib
01-06-2014
1.00
Seat rib assemblies
12-31-2013
3.50
Seat ribs preparation
12-30-2013
3.50
Flaperon mixer arm & seatbelt rib attachments
12-29-2013
2.50
Baggage brackets & flaperon mixer
12-28-2013
1.50
Baggage nutplates & bearing brackets
12-27-2013
3.50
Attach baggage bulkhead aft ribs
12-26-2013
1.50
Baggage bulkhead parts prep
12-26-2013
0.50
Attach bag bulkhead to ribs
12-24-2013
1.00
Prep baggage ribs
12-23-2013
2.50
Blind rivet in bag floor nutplate, prep bag floor
12-22-2013
3.00
Baggage floor nutplates & start bulkhead assembly
Details
12-14-2013
1.50
Buck in last 3 baggage floor rivets in each end
10-07-2013
3.50
Rivet baggage floor ribs
10-02-2013
1.00
Mitch assist in bag floor solid rivets in tight sp
08-18-2013
2.00
Rivet bulkhead assembly
08-11-2013
2.00
Prime bulkhead assembly
07-07-2013
3.00
Countersink Ctr Section & prep Ctr Sect flanges
07-05-2013
1.50
Finish match drill 73 holes in center section
07-04-2013
3.50
Start match drill 73 holes in center section
06-17-2013
2.00
Center section preparation
06-16-2013
2.00
Counter sink & install nutplates on Center Section
05-25-2013
1.00
Fuselage kit arrives
SITE NAVIGATION
Contact Builder
RV-12 Home
Category
# Logs
# Hours
All
333
814
Avionics
18
24
cowling
1
30
Empennage
38
114
Engine
16
37
Fuselage
104
238
Miscellaneous
25
64
None
1
1
notification
2
2
Prop
4
10
service bulletin
6
18
Tailcone
26
57
Tools
1
4
Wings
91
215