KitLog pro

Powered By Kitlog Pro v2.0

GARY'S WEB SITE
Work Logs Found: 91
Category Work Time: 215 Hours
 Date
Hours
Work Log Summary

Details

 10-23-2021
2.00
attach wings
Details

 08-09-2014
0.00
Pack wings for transport
       

 03-30-2013
0.00
Wings stored
       

 02-24-2013
2.00
Finish flaperons -- wings complete
     

 02-23-2013
5.00
Flaperon inbrd & mid nose skins
     

 02-18-2013
1.00
Match drill inbrd leading edge skin to nose ribs
     

 02-17-2013
2.50
Attach flaperon outbrd nose skins
       

 02-03-2013
2.50
Rivet flaperon aft skins
     

 01-27-2013
2.50
Prep left aft flaperon skins
     

 01-26-2013
2.00
Attach flaperon internal structures
     

 01-21-2013
2.00
Rivet flaperon actuation and pivot brackets
       

 01-20-2013
3.00
Prime flaperon brackets
     

 01-19-2013
1.50
Match drill right pivot and actuation brackets
     

 01-13-2013
3.00
Finish rt counterbalance, rt inbrd noserib asmbly

 01-12-2013
2.50
Start right counterbalance drilling

 01-06-2013
2.00
Finish left counterbalance drill & debur flaperon

 12-31-2012
1.00
Drill left counterbalance holes

 12-30-2012
4.00
Left aileron brackets and drill 3 counterbalance h
Details
       

 12-29-2012
2.50
Left flaperon counterbalance

 12-26-2012
1.00
Drill 2nd hole in left counterbalance

 12-23-2012
1.00
First counterbalance hole drilled
     

 12-22-2012
1.50
Start left aileron counterbalance
     

 12-16-2012
3.00
Wing tip trailing edge
       

 12-16-2012
1.00
Attach wingtip lights to extension
     

 12-09-2012
2.50
Flox epoxy inside both wing tip light extensions
       

 11-25-2012
1.50
Prep all flaperon skins

 11-24-2012
0.50
Flute flaperon nose ribs

 11-22-2012
2.00
Drill, countersink & cutout tip light extensions

 11-18-2012
3.00
Rivet left wing tip closeout. Fit both wing tip l
       

 11-12-2012
1.50
Install stall indicator access hatch
       

 10-08-2012
3.00
Wing tip light molex connectors
       

 10-08-2012
3.00
Trim wing tip light brackets
     

 10-08-2012
1.00
Rivet right bottom wing tip
     

 10-07-2012
0.50
Make wing tip light grounding wires
     

 10-07-2012
3.50
Cut rt wing light cutout & install both tip bottom
       

 09-15-2012
3.20
Install left and right upper wing tips
       

 09-09-2012
2.00
Install left and right wing tip hand holds and tip

 09-07-2012
2.50
Dry fit left wing tip pieces

 09-03-2012
3.50
Finish riveting right wiing skins
     

 09-01-2012
1.50
Rivet right top leading edge
       

 09-01-2012
2.00
Finish landing light install. Install landing ligh
       

 08-26-2012
4.00
Fabricate landing light lens and brackets
       

 08-19-2012
4.00
Rivet left top leading edge. Prep right wing top
       

 08-06-2012
5.00
Install flaperon hinges, cleco left top in & outer
       

 08-05-2012
4.00
Left top leading edge riveted, start landing light
       

 08-04-2012
1.50
Attach and rivet right center wing skin - right bo
       

 07-29-2012
5.00
Right lower outer skin and left mid lower skin com
       

 07-28-2012
1.00
Rivet left outer wing skin
     

 07-07-2012
1.50
Cleco left outer lower skin. Prep right lower oute
     

 07-05-2012
4.00
Install & rivet right lower inner wing skin.
     

 07-04-2012
3.50
Rivet left inner lower wing skin
       

 07-01-2012
1.00
Attach left lower inner wing skin
     

 06-24-2012
2.00
Install wing wires and elec connectors
       

 06-16-2012
1.50
Attach connector pins to wing wires and insert in

 06-03-2012
3.00
Install wing elec connector doublers and standoffs
       

 06-02-2012
2.00
Drill and tap flaperon brackets
     

 05-28-2012
4.00
Flaperon hardware fabricate
       

 05-27-2012
1.50
Start wing electrice update

 05-27-2012
2.50
Landng light rib prep - Learned about Molex pins
     

 05-06-2012
2.50
Construct landing light ribs
     

 05-05-2012
3.00
Disassemble temp wing shin, prep inbd bottom skin

 02-26-2012
1.50
Left wing light cut out
       

 02-20-2012
3.50
Temp install outwing and tips in prep for lighting
       

 02-12-2012
3.00
Landing light cut out
       

 01-25-2012
1.50
Prepare wing for landing light cutout
     

 01-22-2012
2.00
Fabricate and attach left and right wing terrminal
       

 01-21-2012
1.50
Install stall warning and verify allignment thru w
       

 01-16-2012
2.00
Remove and reinstall stall warning nutplate rivets
       

 01-15-2012
2.50
Start stall warning
       

 01-07-2012
2.50
Attach right wing forward ribs
       

 01-02-2012
2.50
Right wing rear ribs
     

 01-01-2012
2.50
Start right wing ribs
       

 12-26-2011
1.50
Complete left wing fwd rib attachments
     

 12-25-2011
1.50
Attach left wing fwd ribs
       

 11-23-2011
2.50
Left rear wing ribs and rear spar
       

 11-19-2011
3.50
Rig flaperon hinge & doubler, start attach left r
       

 11-13-2011
1.00
Wing rib doublers
     

 11-11-2011
2.50
Finish rib flut, trim ribs

 09-05-2011
3.00
Paint noserib trim cuts, nutplates on noseribs

 07-24-2011
4.00
Nose ribs: Flute and trim
       

 07-23-2011
2.00
Finish rear spar assemblies

 07-18-2011
1.00
Start rear spar assemblies

 07-17-2011
2.00
Hinge assemblies & tip attach angles

 07-10-2011
5.00
Stub spars and hinge bracket assemblies
       

 07-04-2011
2.50
Prep stub spars. Paint rudder hinges. R/R one sp

 06-27-2011
2.50
Finish spar assembly rivets

 06-26-2011
2.00
Start attaching angles to wing spars
     

 06-19-2011
3.00
Start wings. Tap tiedown holes
     

 05-30-2011
2.50
Complete wing inventory
     

 05-29-2011
3.00
Inventory wing kit
     

 04-14-2011
3.50
Wing kit arrives
       










Copyright © 2001-2024 Matronics. All Rights Reserved.