KitLog pro

Powered By Kitlog Pro v2.0

GARY'S WEB SITE
Work Logs Found: 26
Category Work Time: 57 Hours
 Date
Hours
Work Log Summary

Details

 02-27-2011
1.00
Store tailcone
       

 01-29-2011
1.00
Install top 3 rivets to aft tailcone rib assembly
Details
     

 01-23-2011
6.00
Install tailcone top. Tailcone complete
     

 01-22-2011
4.00
Finish riveting tailcone side
       

 01-17-2011
3.50
Install upper tailcone skins. Start riveting side
     

 01-16-2011
2.00
Prepare upper tailcone skin

 01-16-2011
2.00
Install static tubing
       

 01-09-2011
1.50
Install tail wire & static ports
     

 01-02-2011
2.50
Re-work side skins, control cable string, trim wir

 12-28-2010
5.00
Construct tailcone bottom
       

 12-26-2010
4.00
Attach tailcone ribs to bottom
     

 11-27-2010
3.00
Fit aft frame to stabilator. Prep bottom skin

 11-21-2010
1.50
Complete aft tailcone frame - 105 rivets
       

 11-14-2010
1.50
Finish riveting aft tailcone frame assembly

 11-12-2010
1.00
Aft frame nut plates and corrision paint tiedown

 10-24-2010
1.00
Finish riveting doubler to aft frame

 10-23-2010
1.00
Start rivet doubler to aft frame

 10-17-2010
1.00
Continue rear tailcone rib assembly

 10-16-2010
1.00
Start rear rib assembly

 10-11-2010
4.40
All page 10-3 and #1 on Pg10-4
Details

 09-06-2010
2.00
Tap & fabricate tail skid bracket
     

 08-25-2010
1.00
Solid rivet frame 1210
     

 08-14-2010
1.50
Construct tailcone frames

 08-07-2010
1.00
Break edges and fluting

 08-01-2010
0.50
Start tailcone

 09-01-2009
3.00
Unload tail kit
     










Copyright © 2001-2024 Matronics. All Rights Reserved.