Powered By Kitlog Pro v2.0
JEAN-PHILIPPE'S WEB SITE
s21
Empennage
Work Logs Found:
12
Category Work Time:
54 Hours
Date
Hours
Work Log Summary
Details
11-16-2020
4.00
ATTACH ELEVATOR TO HORIZONTAL STAB
11-15-2020
5.00
balance the elevator
07-19-2020
6.00
finish tip elevator and molding tip horizontal sta
07-18-2020
8.00
finish trim tab and inge and riveting the elevator
07-17-2020
5.00
work on trim tab
07-16-2020
5.00
finish assembling horizontal stabilizer
Details
07-15-2020
5.00
horizontal assembly
Details
07-13-2020
3.00
vertical stabilizer tip vertical done
07-13-2020
1.50
preparation and enventory for assembling horizonta
07-12-2020
6.50
vertical fin assembly less plastic mold cover
07-12-2020
2.50
finish rudder assembly
07-11-2020
3.00
start assembling rudder
SITE NAVIGATION
Contact Builder
s21 Home
Category
# Logs
# Hours
All
209
928
Avionics
38
154
Empennage
12
54
Engine
27
127
Fuselage
72
314
Miscellaneous
1
4
paint
21
107
Prop
1
5
Tools
1
4
Wings
32
141
work shop prep
4
18
Copyright © 2001-2024 Matronics. All Rights Reserved.