KitLog pro

Powered By Kitlog Pro v2.0

JOHN'S WEB SITE
Work Logs Found: 73
Category Work Time: 280 Hours
 Date
Hours
Work Log Summary

Details

 12-16-2006
0.50
Technical Advisor Inspection
Details

 11-18-2006
4.00
Empennage Completed (for time being)
Details
       

 10-21-2006
4.00
Elevator Counter Weights and Fitting
Details

 10-08-2006
2.00
Completed HS
Details

 10-07-2006
4.00
Riveted HS skins to skeleton
Details

 10-06-2006
3.00
Riveted HS spars
Details

 09-24-2006
6.50
Completed rudder assembly
Details

 09-17-2006
4.00
Primed horizontal stabilizer parts
Details

 09-10-2006
3.00
Prepared replacement rudder skin
Details

 09-04-2006
14.00
Horizontal Stabilizer
Details

 08-26-2006
1.50
Trim tab hinge riveted - Left elevator completed
Details

 08-25-2006
1.50
Right elevator trailing edge - Right elevator comp
Details

 08-23-2006
1.50
Tim tab hinge
Details

 08-22-2006
1.50
Right elevator trailing edge
Details

 08-20-2006
10.00
Tim tab, left and right elevator work
Details

 08-13-2006
7.50
Left elevator and trim tab
Details
       

 08-06-2006
7.00
Left elevator riveting continued
Details
       

 07-30-2006
6.00
Left elevator riveting
Details
       

 07-23-2006
4.00
Rudder spar and elevator stiffeners
Details
       

 07-22-2006
8.00
Completed VS; work on rudder spar and skins
Details
       

 07-19-2006
10.00


 07-16-2006
3.00
Rivet VS skin to skeleton
Details

 07-15-2006
3.50
Vertical stabilizer rear spar - rivet
Details
       

 07-09-2006
6.00
Priming elevator, rundder and HS parts
Details
       

 07-08-2006
3.00
Prime parts
Details
       

 06-11-2006
2.00
Bending break for trim tab
Details

 06-04-2006
12.00
Continued Left Elevator Prep
Details
       

 05-28-2006
4.00
Left elevator prep
Details

 05-27-2006
6.00
Elevator preparation
Details
       

 05-24-2006
2.50
Completed elevator stiffeners and matched drilled
Details

 05-23-2006
1.00
Fabricate elevator stiffeners

 05-22-2006
1.00
Fabricate elevator stiffeners

 05-21-2006
6.50
Completed rudder and VS prep; Started elevators
Details
     

 05-20-2006
6.50
Complete rudder skeleton prep
Details

 05-19-2006
2.50
Fit and match drilled rudder skins to skeleton

 05-17-2006
1.50
Fit and match drilled rudder horn
Details

 05-15-2006
1.50
Match drilled rudder stiffeners to skin
     

 05-14-2006
3.00
Rudder stifeners cut to size and match dril
Details
     

 05-13-2006
5.00
Rudder stiffeners and skin prep
Details
     

 05-06-2006
4.00
VS - Dimple and debur; Cut lightening holes
Details
       

 05-03-2006
2.00
Completed disassembly of HS
Details
     

 05-02-2006
2.00
Continue to dissassembe HS
Details

 04-27-2006
1.50
Continued with disassembly of HS
Details
       

 04-25-2006
2.50
Begin disassembly of riveted HS
Details

 04-24-2006
0.00
Diagnose problem
Details

 04-22-2006
7.00
Disaster may have befallen this project!
Details
       

 04-21-2006
3.50
Rivet nose ribs to right HS skin
Details
     

 04-20-2006
2.00
Completed riveting doublers to spars
Details

 04-17-2006
1.00
Completed riveting doubler plate
Details

 04-16-2006
1.00
Initial riveting of forward HS spar
Details

 04-15-2006
6.50
Complete Sanchem Treatement
Details
       

 04-14-2006
4.00
Worked with Sanchem CC6100 anticorrosion treat
Details
       

 04-09-2006
3.00
Anticorrosion treatment of HS sparts
Details

 04-08-2006
5.00
Cleco and march drill Verticle Stabilizer
Details
       

 04-06-2006
1.00
Counter sink spar doubler plates

 04-06-2006
2.00
Cleco Verticle Stabilizer Spar and Hinges

 04-02-2006
2.00
Match drilled HS 908 mounting brackets
Details
     

 03-26-2006
8.00
Continued fitting left HS; counter sunk right spar
Details

 03-25-2006
9.00
Counter sink spars; fitting skeleton to skin
Details

 03-24-2006
2.50
Completed mounting brackets
Details

 03-22-2006
2.50
Fabricated mounting brackets
Details

 03-21-2006
1.50
Completed dimpling HS skins and deburred
Details

 03-20-2006
2.50
Dimpled HS skins - half completed
Details

 03-17-2006
2.00
Debur HS skins
Details

 03-15-2006
1.50
Dimpled and sanded ribs
Details

 03-11-2006
3.00
Cleco and match drill right stabliizer skin
Details
     

 03-07-2006
2.00
Clecoed ribs and spars. Matched drilled left stabi
Details
     

 03-05-2006
7.50
Matched drilled spar. Started assemply of skeleto
Details
       

 03-04-2006
1.50
HS909 Shims and main spar doubler match driill

 03-03-2006
3.50
Clean-up ribs; match drill rear spar doubler and h
Details
     

 03-02-2006
1.00
Continue spar and doubler preparation
Details

 02-26-2006
4.00
Debur spar edges, lightening holes and doublers
Details

 02-20-2006
4.00
Inventory and start
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.