KitLog pro

Powered By Kitlog Pro v2.0

Kenneths Web Site
Work Logs Found: 14
Category Work Time: 42 Hours
 Date
Hours
Work Log Summary

Details

 08-23-2014
8.00
Installed primer lines,checked and set new spark p

 10-09-2010
3.50
Ran primer lines.
Details
       

 08-25-2010
3.00
Added a hobbs meter.
Details
       

 07-29-2008
2.00
Running the ignition leads.
Details
       

 07-29-2008
2.00
Changin the hose clamps.
Details
       

 07-12-2008
3.00
Mounted the fuelflow valve.
Details
       

 07-07-2008
3.00
Starter studs instaled.
Details
       

 07-02-2008
2.00
Installed the carb heat sensor.
Details
       

 07-02-2008
2.00
Dropped of starter for inspection.
Details

 06-30-2008
2.00
EGT wire leads instaled.
Details
       

 06-30-2008
1.00
CHT wires instaled.
Details
       

 05-21-2006
4.00
Observed my 0-320 run after TDI.
Details
       

 04-03-2006
4.00
Observing engine TDI
Details
       

 09-30-2005
3.00
Picked up the engine.
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.