KitLog pro

Powered By Kitlog Pro v2.0

RV-10 N73GF
Work Logs Found: 21
Category Work Time: 123 Hours
 Date
Hours
Work Log Summary

Details

 03-20-2024
8.00
Fuel Flow Tests
Details
       

 03-11-2024
4.00
Fuel cube location
Details
     

 07-03-2023
3.00
Cowl baffle seals
Details
     

 07-02-2023
7.00
PPS, ground strap and blast tube
Details
       

 06-17-2023
8.00
Oil cooler duct and CHT, EGT probes, PPS
Details
       

 06-09-2023
9.00
Fuel cube, fuel pressure oil pressure and Surestar
Details
       

 06-04-2023
9.00
Plug wires and fuel cube mounting
Details
       

 06-03-2023
8.00
Exhaust, starter cable, baffles and tension rods
Details
       

 05-30-2023
6.00
Alternators and wiring, oil temp, tach cap
Details
       

 05-20-2023
5.00
Engine controls
Details
       

 05-06-2023
4.00
Cowl baffle seals
Details
       

 05-05-2023
8.00
Cowl baffles
Details
       

 04-27-2023
7.00
Cowl inlet, fuel and oil lines
Details
       

 04-26-2023
5.00
FAB and cowl inlet work
Details
       

 04-23-2023
6.00
FAB work and inlet opening
Details
       

 03-11-2023
3.00
Fwd air ramps
Details
     

 03-10-2023
8.50
Engine baffles
Details
       

 03-09-2023
3.00
Baffles and MAP sensor
Details
     

 09-18-2021
8.50
Oil cooler mount, firewall insulation, adel mounts
Details
       

 08-21-2021
1.00
Oil cooler mount
Details
     

 07-14-2021
2.00
Firewall forward kit inventory
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.