Date
|
Hours
|
Work Log Summary
|
Details
|
06-24-2011
|
4.00
|
Moved fusalage to airport.
|
Details
|
|
|
06-02-2011
|
2.00
|
Reinforced elt bracket.
|
Details
|
|
|
03-13-2011
|
2.00
|
Making gaskit for my access panels.
|
Details
|
|
|
02-07-2011
|
7.00
|
Finishing up small items.
|
Details
|
|
|
02-05-2011
|
1.00
|
Put screws into the egress handles.
|
Details
|
|
|
02-05-2011
|
3.00
|
Made brackets for the sunvisors.
|
Details
|
|
|
02-05-2011
|
2.50
|
Installed the Dynon SV-32 pitch servo.
|
Details
|
|
|
01-23-2011
|
3.00
|
Drilled holes for egress handles, and started work
|
Details
|
|
|
01-22-2011
|
2.00
|
Mounted the sun visors and located the holes for t
|
Details
|
|
|
11-05-2010
|
4.00
|
Installed crotch belt Bracket.
|
Details
|
|
|
10-30-2010
|
4.00
|
Rivited on the front deck lid.
|
Details
|
|
|
10-27-2010
|
3.50
|
Started installing front deck lid, clamped primer
|
Details
|
|
|
09-06-2010
|
1.00
|
Located and drilled guards for the rudder cables.
|
Details
|
|
|
09-03-2010
|
3.00
|
Brackets for brake line and external power line.
|
Details
|
|
|
08-30-2010
|
3.50
|
Made brackets for brake lines and external power g
|
Details
|
|
|
08-27-2010
|
5.00
|
Mounted strobe and elt bracket.
|
Details
|
|
|
10-08-2008
|
2.00
|
Rivited the armrest bracket into place.
|
Details
|
|
|
10-03-2008
|
2.00
|
Finished the armrest barcket.
|
Details
|
|
|
10-03-2008
|
3.00
|
Drilling,mounting, and locating the map light hole
|
Details
|
|
|
10-02-2008
|
3.00
|
Reinforceing the armrests.
|
Details
|
|
|
03-04-2006
|
1.00
|
Run the static line.
|
Details
|
|
|
03-04-2006
|
4.00
|
Riviting the rear turtle deck on.
|
Details
|
|
|
03-04-2006
|
3.00
|
Made and instald brackets for the static line.
|
Details
|
|
|
03-04-2006
|
3.00
|
Drilling the wing gap fairings
|
Details
|
|
|
03-01-2006
|
3.00
|
Drilled the fuel tank attach brackets.
|
Details
|
|
|
02-26-2006
|
1.00
|
Installing static line on bulkhead.
|
Details
|
|
|
02-19-2006
|
0.50
|
Mounting the cylonide doubler plate.
|
Details
|
|
|
02-19-2006
|
2.00
|
Makeing the stick boot rings.
|
Details
|
|
|
02-19-2006
|
2.50
|
Makeing attach brackets.
|
Details
|
|
|
02-18-2006
|
2.00
|
Makeing the cylinoid doubler plate.
|
Details
|
|
|
02-18-2006
|
2.00
|
Building the battery hold down bar.
|
Details
|
|
|
02-17-2006
|
3.00
|
Built battery box.
|
Details
|
|
|
02-12-2006
|
0.50
|
Installed fittings into the brake cylinders.
|
Details
|
|
|
02-11-2006
|
1.00
|
Putting the gear on the plane.
|
Details
|
|
|
02-11-2006
|
1.00
|
Putting in rudder cables.
|
Details
|
|
|
02-11-2006
|
0.50
|
Primed the large elevator tube.
|
Details
|
|
|
02-11-2006
|
3.00
|
Greasing bearings, mounting the front wheel.
|
Details
|
|
|
02-10-2006
|
2.00
|
Priming landing gear parts.
|
Details
|
|
|
02-10-2006
|
2.00
|
Drilled holes in the firewall.
|
Details
|
|
|
02-09-2006
|
2.00
|
Finished the manual trim bracket.
|
Details
|
|
|
02-08-2006
|
2.00
|
Working on the manual trim handle.
|
Details
|
|
|
02-05-2006
|
3.00
|
Mounted and rivited the rudder bracket and the fir
|
Details
|
|
|
02-05-2006
|
3.00
|
Located,drilled,and clecoed the fresh air NACA ven
|
Details
|
|
|
02-04-2006
|
8.00
|
Drilling and fitting the sub panal and rollbar.
|
Details
|
|
|
02-03-2006
|
3.00
|
Fitting the subpanel and rollbar..
|
Details
|
|
|
02-01-2006
|
2.00
|
Finished the fuel lines.
|
|
|
|
01-31-2006
|
3.00
|
Hooking up the fuel valve
|
|
|
|
01-26-2006
|
1.50
|
Ran the right brake line and the right side vent l
|
|
|
|
01-24-2006
|
2.00
|
Ran a brake and vent line.
|
|
|
|
01-23-2006
|
1.00
|
Drilled the motor mount to the firwall.
|
|
|
|
01-22-2006
|
1.50
|
Put in the fuel and brake line fittings.
|
|
|
|
01-21-2006
|
1.50
|
Fit the front landing gear, put tires together.
|
|
|
|
09-28-2005
|
5.00
|
Rivited forward and aft canopy covers.
|
Details
|
|
|
09-26-2005
|
8.00
|
Fit debured and primed flap bracket and cover
|
Details
|
|
|
09-25-2005
|
3.00
|
Installed the rudder.
|
Details
|
|
|
09-25-2005
|
8.00
|
Fit the landing gear legs to the landing gear brac
|
Details
|
|
|
09-24-2005
|
1.50
|
Made the large pushrod.
|
Details
|
|
|
09-24-2005
|
1.50
|
Made small pushrod.
|
Details
|
|
|
09-24-2005
|
6.00
|
Instaling the vertical stabelizer.
|
Details
|
|
|
09-23-2005
|
4.00
|
Working on the stabelizer.
|
Details
|
|
|
09-22-2005
|
4.00
|
Drilled the elevater horns.
|
Details
|
|
|
09-18-2005
|
6.00
|
Fit debured and primed the center cabin covers.
|
Details
|
|
|
09-02-2005
|
2.00
|
Riviting on the steps.
|
|
|
|
09-01-2005
|
1.00
|
Putting in the cotter pins for the brake pedals an
|
|
|
|
08-31-2005
|
3.00
|
Riviting the seats together.
|
|
|
|
08-31-2005
|
2.00
|
Riviting the front braces on.
|
|
|
|
08-31-2005
|
2.50
|
riviting the bulkhead to the rear deck and the rea
|
|
|
|
08-29-2005
|
3.00
|
Finished priming all the existing parts.
|
|
|
|
08-28-2005
|
5.00
|
Alodined and primed several parts for the interior
|
|
|
|
08-20-2005
|
8.00
|
Deburing and cleaning parts.
|
Details
|
|
|
08-19-2005
|
3.50
|
Finishing some riviting up on the lower fuselage.
|
|
|
|
08-18-2005
|
2.50
|
Getting upper fuselage ready for deburing.
|
|
|
|
08-17-2005
|
4.50
|
Disassemble upper fuselage for debure and prime
|
|
|
|
08-15-2005
|
2.50
|
Disassembling upper fuselage.
|
Details
|
|
|
08-14-2005
|
5.00
|
Finished the seats,mounted the seat pans, finished
|
Details
|
|
|
08-13-2005
|
10.00
|
Built the seats.
|
Details
|
|
|
08-12-2005
|
3.50
|
Fitting the steps,elevator control, and luggage w
|
Details
|
|
|
08-08-2005
|
2.00
|
Installing the step kits.
|
|
|
|
08-07-2005
|
1.00
|
Debured , primed and rivited the elevator control
|
|
|
|
08-07-2005
|
4.00
|
Cut and mounted the stifners and the fuselage skin
|
Details
|
|
|
08-06-2005
|
5.00
|
Mounted the rudders and brake pedels.
|
|
|
|
08-06-2005
|
0.50
|
Made and mounted the seat belt brackets.
|
Details
|
|
|
08-06-2005
|
1.50
|
Drilled and clecoed the front firewall brackets.
|
|
|
|
08-05-2005
|
3.00
|
Squared the fuselage and drilled the rear deck pla
|
Details
|
|
|
07-30-2005
|
5.50
|
Finished bucking rivitson the lower fuselage.
|
|
|
|
07-25-2005
|
1.00
|
Bucking rivits on the bottom forward section of th
|
|
|
|
07-24-2005
|
3.00
|
Putting rivits in holes and building the saw bucks
|
Details
|
|
|
07-23-2005
|
3.00
|
Riviting the front floor skin on.
|
|
|
|
07-22-2005
|
2.00
|
Riviting the forward side skins on.
|
|
|
|
07-21-2005
|
2.00
|
Riviting the forward fuselage skins on.
|
|
|
|
07-20-2005
|
1.50
|
Started riviting the forward fuselage skins on.
|
Details
|
|
|
07-19-2005
|
2.00
|
Rivited the brake peddles together.
|
Details
|
|
|
07-18-2005
|
12.00
|
Primed and reassembled forward fuselage.
|
Details
|
|
|
07-16-2005
|
10.00
|
Priming and reassembly
|
Details
|
|
|
07-15-2005
|
4.00
|
Cleaning forward fuselage parts.
|
Details
|
|
|
06-26-2005
|
7.00
|
Deburing fuselage parts.
|
Details
|
|
|
06-25-2005
|
5.00
|
Deburing and counter sinking parts.
|
Details
|
|
|
06-24-2005
|
7.00
|
Counter sinking parts.
|
Details
|
|
|
06-21-2005
|
3.00
|
Deburing parts.
|
Details
|
|
|
06-20-2005
|
3.00
|
Disasembled fuselage.
|
Details
|
|
|
06-18-2005
|
5.00
|
Located landing gear mounts.
|
Details
|
|
|
06-16-2005
|
1.50
|
Fitting the luggage compartment ribs.
|
Details
|
|
|
06-15-2005
|
2.00
|
Working on the rudder pedals.
|
Details
|
|
|
06-13-2005
|
4.00
|
Fitted front fuselage braceing.
|
|
|
|
05-31-2005
|
1.50
|
Locating the lower short langerons.
|
Details
|
|
|
05-31-2005
|
3.00
|
Cutting holes in center section.
|
Details
|
|
|
05-30-2005
|
4.00
|
Drillling side pannels.
|
Details
|
|
|
05-21-2005
|
6.00
|
Drilling the side skins.
|
Details
|
|
|
05-21-2005
|
5.00
|
Attaching the center section.
|
Details
|
|
|
05-20-2005
|
2.00
|
Finished riviting the center section.
|
Details
|
|
|
05-19-2005
|
2.00
|
Riviting the seat ribs.
|
Details
|
|
|
05-18-2005
|
4.00
|
Fitting the seat pans to the seat ribs.
|
Details
|
|
|
04-28-2005
|
5.00
|
Teardown of the center section.
|
Details
|
|
|
04-23-2005
|
4.00
|
Working on the center fuselage bulkhead.
|
Details
|
|
|
04-22-2005
|
3.00
|
Fitting longerons to the rear fuselage.
|
Details
|
|
|
04-21-2005
|
8.00
|
Bending Longerons
|
Details
|
|
|
04-13-2005
|
4.00
|
Riviting the aft fuselage.
|
Details
|
|
|
04-13-2005
|
2.00
|
Drilled out center section skin.
|
Details
|
|
|
04-12-2005
|
4.00
|
Fitting the outer ribs.
|
Details
|
|
|
04-11-2005
|
2.00
|
Making shims and working on ribs.
|
Details
|
|
|
04-11-2005
|
2.00
|
Building the seating section.
|
Details
|
|
|
04-10-2005
|
6.00
|
Building the 705A bulkhead
|
|
|
|
04-09-2005
|
4.00
|
Debured and primed parts.
|
Details
|
|
|
04-09-2005
|
2.00
|
cutting the 605-c bar doubler.
|
Details
|
|
|
03-25-2005
|
6.00
|
Started riviting the rear fuselage.
|
Details
|
|
|
03-24-2005
|
4.00
|
Alodined and primed parts.
|
Details
|
|
|
03-22-2005
|
2.50
|
Dimpling rear fuselage parts.
|
Details
|
|
|
03-20-2005
|
1.00
|
Rudder stop
|
Details
|
|
|
03-20-2005
|
2.00
|
Match drilling rear fuselage.
|
Details
|
|
|
03-20-2005
|
2.00
|
Deburing and dimpling parts.
|
Details
|
|
|
03-19-2005
|
2.00
|
Trimming support J channels.
|
Details
|
|
|
03-19-2005
|
4.50
|
Preping parts for primer.
|
Details
|
|
|
03-19-2005
|
5.00
|
Match drilling holes to the J channels.
|
Details
|
|
|
03-19-2005
|
4.00
|
Clecoed skins to the bulkheads.
|
Details
|
|
|
03-17-2005
|
5.00
|
Deburing parts.
|
Details
|
|
|
03-14-2005
|
1.50
|
Drilling shims for the 705 bulkhead.
|
Details
|
|
|
03-13-2005
|
1.00
|
Maiting stifner and bulkhead tohether.
|
Details
|
|
|
03-13-2005
|
1.50
|
Fabrcated the tiedown bracket.
|
Details
|
|
|
03-13-2005
|
2.00
|
Building the 711 bulkhead.
|
Details
|
|
|
03-12-2005
|
0.50
|
Fitting the bulkhead parts.
|
Details
|
|
|
03-12-2005
|
1.50
|
Fitting the 706 bulkhead parts.
|
Details
|
|
|
03-11-2005
|
4.00
|
Deburing several parts.
|
Details
|
|
|
03-10-2005
|
1.00
|
Riviting on nut plates on the center sec
|
Details
|
|
|
03-10-2005
|
2.00
|
Preparing the seat braceing.
|
Details
|
|
|
03-09-2005
|
2.50
|
Riviting the side plates onto the center
|
|
|
|
03-09-2005
|
2.00
|
Preparing control arm brackets.
|
Details
|
|
|
03-08-2005
|
1.00
|
Enlarging holes for snap bushings.
|
|
|
|
03-07-2005
|
4.00
|
Finished the firewall started center sec
|
Details
|
|
|
03-06-2005
|
3.00
|
Riviting the braceing to the firewall.
|
|
|
|
03-05-2005
|
1.00
|
Priming all the firewall braceing.
|
|
|
|
03-05-2005
|
2.50
|
Dimpling the firewall.
|
Details
|
|
|
03-04-2005
|
2.50
|
Made fuel pump doubler.
|
Details
|
|
|
03-03-2005
|
2.00
|
Drilling matching holes in the firewall.
|
Details
|
|
|
03-02-2005
|
2.50
|
Braceing the firewall.
|
Details
|
|
|
03-01-2005
|
1.50
|
Fabricating firewall brackets.
|
Details
|
|
|
02-26-2005
|
2.00
|
Built shelving to hold the fuselage part
|
|
|
|
02-15-2005
|
2.00
|
Sorting bolts.
|
Details
|
|
|
02-13-2005
|
5.00
|
Inventoring the fuselage parts.
|
|
|
|
02-12-2005
|
6.00
|
Unpacking the fuselage boxes.
|
|
|
|
02-08-2005
|
2.00
|
Picked up fuselage from ABF in Lima.
|
Details
|
|