KitLog pro

Powered By Kitlog Pro v2.0

RV-10 N73GF
Work Logs Found: 22
Category Work Time: 126 Hours
 Date
Hours
Work Log Summary

Details

 05-07-2024
4.00
Wheel fairings
Details
       

 04-11-2024
8.00
Decals and ELT
Details
       

 03-16-2024
10.00
Brakes, spinner, nav/strobe and taxi light lenses
Details
       

 12-29-2023
5.00
Heater duct and door seals
Details
       

 04-28-2023
2.00
Oil door and engine control cables
Details
     

 04-22-2023
6.00
Cowl pin covers and FAB
Details
       

 04-19-2023
2.00
Cowl pin covers
Details
       

 04-16-2023
6.00
Cowl and wheel pants
Details
       

 04-15-2023
8.00
Oil door, lower cowl louvers
Details
       

 04-12-2023
5.00
Cowl ramps and reinforcement
Details
       

 04-08-2023
8.00
Cowl side hinges and fasteners
Details
       

 04-07-2023
6.00
Cowl trimming and fasteners
Details
       

 04-03-2023
4.00
Skybolt cowl fasteners
Details
       

 04-02-2023
6.00
Skybolt cowl fasteners
Details
       

 04-01-2023
7.00
Skybolt cowl fasteners
Details
       

 03-31-2023
4.00
Skybolt brackets for firewall
Details
       

 03-26-2023
8.00
Lower cowl trimming
Details
       

 03-24-2023
7.00
Top cowl trimming
Details
       

 03-21-2023
9.00
Spinner trimming
Details
       

 03-14-2023
5.50
Cowl trimming
Details
       

 03-13-2023
3.00
Spinner plate and doubler
Details
       

 06-10-2021
2.00
Inventoried Finishing Kit
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.