Powered By Kitlog Pro v2.0
WILLIAM'S WEB SITE
RV 7
Wings
Work Logs Found:
149
Category Work Time:
636 Hours
Date
Hours
Work Log Summary
Details
08-14-2021
4.00
Pitot And AOA Installation
Details
08-01-2021
6.00
Completed Flap Riveting
Details
07-31-2021
3.00
Wiring Fuel Sender Unit Left Tank Only
Details
07-31-2021
2.00
Placed Wings In Cradle
Details
07-31-2021
3.00
Bolting Left Fuel Tank to Spar
Details
07-25-2021
3.00
Wiring Conduit Right Wing
Details
07-22-2021
6.00
Continued Riveting Right Flap
Details
07-20-2021
3.00
Rivet Right Flap
Details
07-18-2021
3.00
Create Flap Stand
Details
07-17-2021
3.00
Create Right Reinforcement Plate
Details
07-11-2021
4.00
Completed Match-Drilling Reinforcement Plate
Details
07-05-2021
2.00
Countersink Flap Spar
Details
07-04-2021
2.00
Prepare and Treat Aileron Attach Brackets
Details
07-03-2021
4.00
Aileron Bracket and Fairing Preparation
Details
07-02-2021
3.00
Squeezed Rear Spar Skin Rivets
Details
06-30-2021
3.00
Paint Flap Components and Rivet Skins
Details
06-29-2021
3.00
Treated Flap Components
Details
06-27-2021
8.00
Completed Wing Cradle
Details
06-26-2021
6.00
Constructed Wing Cradle
Details
06-20-2021
5.00
Completed Riveting Right Tip Skins
Details
06-19-2021
5.00
Match Drill Flaps
Details
06-17-2021
1.00
Match Drill Flaps
Details
06-16-2021
1.50
Started on the Flaps
Details
06-14-2021
6.00
Riveted the Right Top Inboard Wing Skin
Details
06-14-2021
4.00
Finished Ailerons
Details
06-13-2021
6.00
Riveted Ailerons
Details
06-12-2021
6.00
Riveted Ailerons
Details
06-08-2021
2.00
Screwed in Right Tank Screws
Details
06-07-2021
2.00
Began Riveting Aileron
Details
06-05-2021
6.00
Right LE and Tank Secured
Details
06-02-2021
3.00
Primed Aileron Components
Details
05-29-2021
3.00
Prepare Aileron Components
Details
05-19-2021
2.00
Match Drill Right Aileron
Details
05-15-2021
3.00
Match Drill Left Aileron
Details
05-02-2021
5.00
Aileron Trailing Edge Bend
Details
05-01-2021
3.00
SAAA Inspection
Details
05-01-2021
2.00
Fuel Tank Test
Details
05-01-2021
0.00
Chad Boot SAAA Inspection
Details
04-26-2021
3.00
Blind Rivet Z Brackets
Details
04-25-2021
8.00
Closing Right Tank Baffle
Details
04-23-2021
3.00
Finished Riveting Left LE to Spar
Details
04-22-2021
5.00
Riveted Left Leading Edge to Spar
Details
04-05-2021
8.00
Treat and Prime Rear Aileron Parts
Details
04-05-2021
3.00
Back-Rivet Stiffeners to Aileron Skins
Details
03-27-2021
3.00
Aileron Substructure
Details
03-26-2021
3.00
Dimpled Left Aileron
Details
03-24-2021
6.00
Left Aileron Preparation
Details
03-22-2021
3.00
Completed Shaping of Stiffeners
Details
03-15-2021
2.00
More Stiffener Deburring
Details
03-14-2021
4.00
Shaped and Deburred Aileron Stiffeners
Details
03-13-2021
4.00
Trimmed Aileron Stiffeners
Details
03-13-2021
3.00
Test Left Tank
Details
03-06-2021
6.00
Sealed Left Tank
Details
02-07-2021
3.00
Riveted Right Leading Edge
Details
02-06-2021
6.00
Installing the Leading Edge Right Wing
Details
01-06-2021
1.00
Testing of Fuel Sender Units
Details
01-05-2021
6.00
Primed Wing Skins
Details
01-04-2021
4.00
Cleaned And Prepared Skins For Priming
Details
12-30-2020
4.00
Dimple And Debur Skins
Details
12-28-2020
4.00
Prepared Wing Skins
Details
12-20-2020
6.00
Opened Fuel Tank
Details
12-16-2020
4.00
Tank Testing
Details
12-06-2020
8.00
Sealed Fuel Tank
Details
11-28-2020
3.00
TC Inspection - Chad Boot
Details
11-17-2020
3.00
More Skin Dimpling
Details
11-15-2020
6.00
Dimpled Wing Skins
Details
11-08-2020
0.50
Leg Injury
Details
10-24-2020
6.00
Prime Countersunk Holes In Spar
Details
08-09-2020
6.00
Countersink Spar For Wing Skins
Details
07-20-2020
6.00
Debur And Dimple Wing Skins
Details
07-11-2020
6.00
Rivet Left Leading Edge
Details
06-24-2020
8.00
Dimpled Wing Skins
Details
06-24-2020
3.00
Dimpled Wing Ribs
Details
06-23-2020
2.00
Test Partial Tank With Water
Details
06-20-2020
7.00
Assembled And Riveted Leading Edge
Details
05-27-2020
4.00
Relocate Fuel Sender Unit Left Tank
Details
05-23-2020
8.00
Seal Inspection Caps On Left And Right Tanks
Details
05-11-2020
6.00
Sealed, Safety Wired And Installed Flop Tube
Details
05-03-2020
8.00
Sealed Right Tank Ribs
Details
04-19-2020
5.00
Seal Left Outboard Tank Rib
Details
04-18-2020
7.00
Fabricate Anti-Hang Up Bracket For Flop Tube
Details
04-10-2020
8.00
Rivet Left Wing Ribs
Details
03-29-2020
8.00
Seal Tank Ribs
Details
01-19-2020
6.00
Sealing Filler Cap and Drain
Details
01-07-2020
2.00
Clean Up Excess Sealant And Clean Remaining Skin A
Details
01-03-2020
4.00
Rivet Fuel Tank Stiffeners
Details
01-01-2020
4.00
Sealed and Riveted Tank Stiffeners
Details
12-30-2019
1.00
Prepared Stiffeners for Sealant
Details
12-30-2019
1.00
Dismantle Test Pieces
Details
12-29-2019
3.00
Test Seal Parts With Sealant
Details
12-23-2019
3.00
Prepare Tank Vent Line
Details
12-15-2019
2.50
Continued Dimpling Tank Skins
Details
11-16-2019
4.00
Preparation of Fuel Sender Unit Right Tank
Details
11-10-2019
6.00
Dimple Tank Skins
Details
11-09-2019
2.00
Prepared and Riveted Nut Plates to End Rib
Details
11-03-2019
2.00
Finalised Fuel Filler Cap and Assembled Flop Tube
Details
11-02-2019
2.00
Prepared Fuel Filler Cap
Details
10-27-2019
3.00
Prepare End Rib Stiffeners
Details
10-27-2019
2.00
Flop Tube Preparation
Details
10-26-2019
1.00
Prepare End Ribs
Details
10-20-2019
1.00
Debur Tank Skins and Form Tank Attach Bracket
Details
10-07-2019
1.00
Match Drill Tank Ribs
Details
10-06-2019
10.00
Fuel Tank Stiffeners
Details
09-22-2019
1.50
Drilled Replacement Angle Brackets
Details
06-16-2019
8.00
Checked Tank Alignment
Details
06-15-2019
10.00
Trimmed Tank Stiffeners
Details
06-15-2019
5.00
Treated and Primed Z Brackets and Inspection Cover
Details
06-01-2019
10.00
Tank Attach Brackets
Details
05-25-2019
2.00
Primed LE Ribs
Details
04-27-2019
6.00
Complete Match-Drilling LE
Details
04-20-2019
8.00
Match Drill LE Skins
Details
04-19-2019
2.00
Debured leading edge skin
Details
04-06-2019
5.00
Fuel Tank Joint Strip
Details
04-05-2019
5.00
Tie Down Holes in LE
Details
03-23-2019
6.00
Debur LE Skins
Details
03-16-2019
12.00
Fuel Tank Ribs
Details
02-23-2019
8.00
Match-Drill Wing Skins
Details
02-17-2019
6.00
Match-Drill Wing Skins
Details
02-09-2019
7.00
Wing Walk Doublers
Details
01-13-2019
6.00
Rivet Rear Spar
Details
01-12-2019
2.00
Rivet Right Spar
Details
01-08-2019
4.00
Taped Spar for Riveting
Details
01-06-2019
8.00
Set Up Two Wing Stands
Details
01-05-2019
2.00
Assembled Wing Substructure on Stands
Details
12-29-2018
4.00
Stall Warning Horn
Details
12-29-2018
3.00
Right Wing Rib Treatment
Details
12-27-2018
4.00
Primed Left Wing Ribs
Details
12-26-2018
6.00
Left Wing Rib Preparation
Details
11-24-2018
2.00
Conduit Holes in Wing Ribs
Details
11-18-2018
4.00
Match-Drill LE Ribs
Details
11-04-2018
3.00
Prepare Leading Edge Ribs
Details
11-03-2018
6.00
Assemble Right Wing
Details
11-02-2018
4.00
Left Wing Assembly
Details
10-30-2018
5.00
Wing Rib Prep
Details
10-28-2018
6.00
Wing Stands
Details
10-26-2018
5.00
Wing Rib Preparation
Details
10-21-2018
5.00
Wing Rib Prep
Details
09-27-2018
2.00
Tie-Down Assembly
Details
09-24-2018
2.50
Rear Spar Preparation
Details
09-09-2018
3.50
Wing Rear Spar Doublers
Details
09-02-2018
1.50
Prepare Tie-Down
Details
08-25-2018
4.00
C/S Spar for Tank Attach Screws
Details
08-24-2018
4.50
Tie-Down Spacers
Details
08-11-2018
3.00
Spar Nut Plates
Details
08-10-2018
2.00
Primed Wing C/S Holes
Details
07-31-2018
4.00
C/S Wing Spars
Details
05-18-2018
3.00
Treat LE Ribs
Details
02-24-2018
6.00
Inventory of Wing Kit
Details
02-23-2018
1.50
Wing Kit Arrived
Details
SITE NAVIGATION
Contact Builder
RV 7 Home
Category
# Logs
# Hours
All
210
795
Empennage
48
122
Fuselage
4
17
Miscellaneous
7
17
Tools
2
3
Wings
149
636
Copyright © 2001-2024 Matronics. All Rights Reserved.