KitLog pro

Powered By Kitlog Pro v2.0

HB-YAK GS-2 Sportsman 2+2 kit
Work Logs Found: 49
Category Work Time: 312 Hours
 Date
Hours
Work Log Summary

Details

 03-06-2024
6.00
Installing the fuletank caps
       

 02-26-2024
4.00
Wings paintaid in Yellow, mobile parts in red
       

 01-25-2024
2.00
Wing tip lights with anchor nuts
       

 01-25-2024
2.00
Taxi lights in wingtip installed
     

 12-13-2023
8.00
Last rivets on the wing
       

 11-29-2023
10.00
Riventing
       

 11-29-2023
10.00
Cove skins installation
       

 11-29-2023
2.00
Aux fuel tank support installation
       

 11-23-2023
16.00
Riveting of wing
       

 11-20-2023
8.00
More riveting on wing
     

 09-28-2023
4.00
Prep and corrosion proof of inspection covers
       

 08-17-2023
10.00
More protective film removal
       

 08-08-2023
16.00
More protective film removing
       

 06-19-2023
20.00
More riveting
       

 06-13-2023
10.00
More riveting on the wing
       

 06-07-2023
20.00
Riveting wing skins
       

 05-26-2023
16.00
Riveting wing skins in place
       

 05-16-2023
16.00
Riveting wing skins in place
       

 05-11-2023
16.00
Peeling off the old and fragile protective film of
       

 04-08-2023
6.00
Riveting hat section stiffners in place
       

 04-08-2023
6.00
Cutting wing skins fuel access
       

 01-20-2023
2.00
Working on the landing light
       

 12-01-2022
2.00
Further testing of fuel system with real fuel
       

 11-22-2022
1.00
Wing Tip LED Landing Lights
       

 11-14-2022
4.00
Checking fuel tanks
Details
       

 09-15-2022
3.00
Cutting the acces holes for the tank filler neck.
       

 07-16-2022
10.00
take wings of fuselage
Details
       

 03-12-2022
8.00
Cable guides in wings
Details
       

 03-05-2022
2.00
Aileron trim servo complete
       

 02-26-2022
8.00
Install Flaps and connecting rods
       

 02-19-2022
4.00
Rework all inspection hole covers for countersunk
       

 02-19-2022
2.00
Aileron trim servo slot with sufficiant clearance
       

 02-19-2022
2.00
Aileron Trim Servo and cable connector
       

 02-19-2022
2.00
Aileron servo tab riveted in place
       

 02-12-2022
2.00
Ailorin Trim servo rod slot
       

 02-05-2022
2.00
Left wing venting
       

 02-05-2022
1.00
Aileron trim servo service hole doubler
       

 02-05-2022
6.00
Aileron Trim and Servo Tab
       

 02-05-2022
2.00
Access hole for trim servo
       

 06-09-2021
4.00
Right wing; Fuel transfer pump installation
Details
       

 06-07-2021
4.00
Position and Drill the Aux Tank Mounting Channels
Details
       

 03-29-2021
1.00
Wing tip fairing preparation
Details
       

 03-20-2021
2.00
Installing nutplates on inspection hole doublers
       

 03-20-2021
4.00
Fuel transfer pump installation
Details
       

 03-13-2021
2.00
Test Fit the Main Fuel Tank
     

 03-13-2021
2.00
Routing of the wingtip lights
     

 03-13-2021
4.00
Position and Dril lthe Aux Tank Mounting Channels
Details
       

 03-13-2021
8.00
Inspection hole doublers
Details
       

 03-06-2021
10.00
Pitot mast installation
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.